HomeMy WebLinkAboutRES 22-034RESOLUTION NO. 22-034
WHEREAS, on April 25, 2017, the City Council of the City of Beaumont, Texas,
passed Resolution No. 17-083 awarding a contract in the amount of $15,984,397.88 to
Allco, LLC of Beaumont, Texas, for the Washington Boulevard Pavement Widening
Phase II (Corporate Drive to Amarillo Street) Project; and,
WHEREAS, on August 3, 2017, the City Manager executed Change Order No. 1,
in the amount of $9,920.00, to adjust the estimated quantities to reflect the actual
quantities used in the completion of the project, thereby increasing the contract amount
to $15,994,317.88; and,
WHEREAS, on February 6, 2018, the City Council of the City of Beaumont,
Texas, passed Resolution No. 18-032 authorizing the City Manager to execute Change
Order No. 2, in the amount of $103,893.00, to accommodate design changes necessary
to address unforeseen conflicts with the underground utilities and additional curb and
driveway improvements required on Executive Boulevard and Corporate Drive, thereby
increasing the contract amount to $16,098,210.88; and,
WHEREAS, on May 14, 2018, the City Manager executed Change Order No. 3,
in the amount of $7,714.55, to adjust the estimated quantities to reflect the actual
quantities used in the completion of the project, thereby increasing the contract amount
to $16,105,925.43; and,
WHEREAS, on June 5, 2018, the City Council of the City of Beaumont, Texas,
passed Resolution No. 18-123 authorizing the City Manager to execute Change Order
No. 4, in the amount of $16,032.91, to adjust the pipe quantity and size which was not
allotted for in the original design and the addition of fourteen (14) calendar days,
thereby increasing the contract amount to $16,121,958.34; and,
WHEREAS, on July 17, 2018 the City Council of the City of Beaumont, Texas,
passed Resolution No. 18-157 authorizing the City Manager to execute Change Order
No. 5, in the amount of $33,303.00, to adjust bid items and quantities in the contract to
accommodate revisions to the storm sewer system; relocate a 16" waterline; and,
twenty-two (22) calendar days will be added to the contract for the work, thereby
increasing the contract amount to $16,155,261.34; and,
WHEREAS, on October 16, 2018 the City Council of the City of Beaumont,
Texas, passed Resolution No. 18-255 authorizing the City Manager to execute Change
Order No. 6, in the amount of $215,144.90, to adjust the bid items and quantities in the
contract to accommodate for additional sewer work; ground boxes for fiber optics and
traffic signals; and, sixty (60) calendar days will be added to the contract for the work,
thereby increasing the contract amount to $16,370,406.24; and,
WHEREAS, on April 9, 2019 the City Council of the City of Beaumont, Texas,
passed. Resolution No. 19-084 authorizing the City Manager to execute Changer Order
No. 7, in the amount of $128,658.75, to adjust the bid items and quantities in the
contract for additional waterline, surface inlets for storm sewer, and foundations for
traffic ground cabinets; traffic signal poles that meet the height requirements needed to
fit in the field; and, ten (10) calendar days will be added to the contract for the work,
thereby increasing the contract amount to $16,499,064.99; and,
WHEREAS, on September 3, 2019 the City Manager executed Change Order
No. 8, in the amount of $6,400.00, to adjust the estimated quantities to reflect the actual
quantities used in the completion of the project relating to exploratory digging of a 20"
water line, thereby increasing the contract amount to $16,505,464.99; and,
WHEREAS, on April 7, 2020, the City Council of the City of Beaumont, Texas,
passed Resolution No. 20-073 authorizing the City Manager to execute Change Order
No. 9, in the amount of $28,474.00, for the addition of a conflict junction box to account
for flow line design issues with one sewer, one water and two storm lines; and, ten (10)
calendar days will be added to the contract for the work, thereby increasing the contract
amount to $16,533,938.99; and,
WHEREAS, on June 2, 2020, the City Council of the City of Beaumont, Texas,
passed Resolution No. 20-111 authorizing the City Manager to execute Change Order
No. 10, in the amount of $37,033.00, to account for revisions to the storm sewer
system, thereby increasing the contract amount to $16,570,971.99; and,
WHEREAS, on March 23, 2021, the City Council of Beaumont, Texas, passed
Resolution No. 21-073 authorizing the City Manager to execute Change Order No. 11,
in the amount of ($39,863.07), to adjust actual quantities used during the course of
construction and additional water line work being paid for by Jefferson County Drainage
District No. 6, thereby decreasing the contract amount to $16,531,108.92; and,
WHEREAS, on April 21, 2021, the City Manager executed Change Order No. 12,
in the amount of $0.00, to allow for additional time for the completion of the project due
to the actual number of inclement weather days exceeding the days set out in the
contract, thereby having no effect in the total contract amount of $16,531,108.92; and,
WHEREAS, on October 4, 2021, the City Manager executed Change Order No.
13, in the amount of $0.00, to allow for additional time for the completion of the project
due to the actual number of inclement weather days exceeding the days set out in the
contract, thereby having no effect in the total contract amount of $16,531,108.92; and,
WHEREAS, Change Order No. 14, in the amount of ($81,440.27), is necessary
to adjust the estimated quantities in the contract to reflect the actual quantities used in
the completion of the project, thereby decreasing the contract amount to
$16,449,668.65; and,
WHEREAS, the project has been inspected by the Engineering Division and
found to be complete in accordance with the provisions and terms set forth in the
contract;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 14, in the amount of $(81,440.27), to adjust the estimated quantities in the
contract to reflect the actual quantities used in the completion of the project, thereby
decreasing the total contract to $16,449,668.65; and,
BE IT FURTHER RESOLVED THAT the Washington Boulevard Pavement
Widening Phase II (Corporate Drive to Amarillo Street) Project be and the same is
hereby accepted; and,
BE IT ALSO RESOLVED THAT the City Manager is authorized to make final
payment in the amount of $765,977.01 to Allco, LLC, of Beaumont, Texas.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 1st day of
February, 2022. = 90V. �y
r $ ,,it,
U �► - Mayor Robin Mouton -
CITY OF BEAUMONT
Date:
January 5, 2022
Project_
Washinton Blvd -Phase 1I
Owner:
City of Beaumont
Contractor:
ALLCO, LLC
Change Orden- No.: 14 - Final
......:...
cHE:FO LLOW�rl� cr�avc�s rlv`r pz�N
............ �.:-.:- .:•.���..... .. ...... Aria
...........:• .... ......:::: .....;...:;;.... A Try=HEI:tE Y�MA,DE��..:..����'....... .. ...
All quantities adjusted to reflect final field measurements,
Change Order
Item No.
Item Code
Description
Unit
Original Quttntit�
I�revY Ra�ltitY
Unit price
Amount
ADD
104
002
REMOVING CONCRETE (DRWY) (4" - 611)
SY
4.729.00
7,029.67
$16.00
S36,810,72
104
003
REMOVING CONCRETE (SWLK) (4" - 6")
SY
300,00
435.56
$30.13
$4,084,42
152
001
SODDING FOR. EROSION CONTROL
SY
1 1.336,00
13,680.00
$7.50
$17,550.00
423
001
RETAINING WALLS (6" X 211 - 2411) { CL A)
LF
206.00
2,792.00
S44.00
$113,344.00
464
001
RCP 15"
LF
96.00
992.00
S'28,00
S25,038.00
464
002
RCP 18"
LF
884.00
908.00
S31.00
$744.00
464
007
RCP48"
LF
1,642.00
1,681.00
$162.00
S6,31S,00
465
004
CURB INLET EXTENSION TY F. (COMPL) (5'.0")
EA
43.00
46.00
$1.410.00
$4,230,00
465
009
JUNCTION BOX (COMPL) (YT(TY B)
EA
4.00
5.00
$5,975,00
$5,975,00
496
001
REMOV STR (PIPE) 8" -48" RCP
LF
11,025.00
11,666.00
$7,00
S4,487.00
496
004
REMOV (MH) (JBOX)
EA
18.00
19,00
$720,00
$720.00
506
003
TEMP SEDIMENT CONTROL FENCE (INSTALL)
LF
4,500.00
4.620,00
$2.50
5300.00
506
004
TEMP SEDIMENT CONTROL FENCE (REMOVE)
LF
4,500.00
4.620,00
$0,50
$60.00
530
001
DRIVEWAYS (CONC) (4")
SY
782.00
991.98
$60,00
S12,598.80
530
002
DRIVEWAYS (CONC) (6")
SY
4,70S.00
5.939.52
$68.00
S83,743,36
531
004
CONC WHEELCHAIR RAMPS (411) TYPE 9
EA
2.00
4.00
$2,503.50
$5,007,00
618
003
3" PVC SCHD 40 CONDUIT (TRAFFIC SIGNAL)
LF
1.170,00
1.197.00
$19.00
$513,00
636
001
ALUMINUM SIGNS (TYPE A)
SF
62.00
82.24
$33.00
$667.92
662
003
24" (W) (SLID) REMOVABLE)
LF
357,00
397.00
$3.45
$138,00
662
004
4" (Y) (SLD) (REMOVABLE)
LF
39,268,00
40,389.00
$0.53
$593,60
666
001
REEL PAV MRK TY I (Y) 4" (SLD)(1001VM)
LF
18,511.00
20,523.00
$0.52
$1,046.24
666
002
REFL PAV MRK TY 14" (BKR)(100MLL)
LF
205.00
615.00
S0.70
$287.00
666
003
REFL PAV MILK TY I (W) 4" BRK)(I00MIL)
LF
4,095.00
4.880.00
S0,63
$494,55
666
004
REFL PAV MRKTY I (W) 6"(SLD)(I00MIL)
LF
1,029.00
1,095.00
$0,80
$52,80
666
007
REFL PAV MRK TY I (W) (WORD)
LF
100
14.00
$120.00
$1,440,00
666
009
REFL PAV MRK TY I (W)(ARROW)(I OOMIL)
EA
18.00
20,00
$115,00
V.a0.00
666
010
REFL PAV MRK TY It (Y) 4" (SLID)
LF
19,511.00
20,523.00
$0.37
a J44.44
666
011
REFL PAV MRK TY 11 (Y) 4" (BRK)
LF
205.00
615,00
$0,42
$172.20
666
012
REFL PAV MRK TY 11 (W) 4" (.BRK)
LF
4,095.00
4.980.00
$0.42
S329.70
666
013
REFL PAV MRK TY 11 (W) 61- (SLD)
LF
1,029,00
1,095,00
$0.77
$50,82
666
015
REFL PAV MRK TY H (W) (24") (SLD)
LF
45.00
531,00
$2.60
$1,263,60
666
016
REFL PAV MRK TY 11(WORD)
EA
2.00
14.00
$220.00
S2,640.00
666
017
REFL PAV MRK TY 11 (W) (ARROW)
EA
18.00
20.00
$36.50
$73.00
678
002
PAV SURF PREP FOR MRK (4")
LF
22.811,00
26.223.00
$0,12
$409.44
678
002
PAV SURF PREP FOR MRK (6")
LF
1.029.00
1.095.00
$0.27
$17.S2
678
004
PAV SURF' PREP FOR MRK (24")
LF
45,00
531.00
$3,02
$1,467.72
679
005
PAV SURF PER.P FOR, MRK (WORD)
EA
2.00
14.00
$47.00
$564.00
678
006
PAV SURF PREP FOR MRK (ARROW)
EA
19.00
20,00
$31,50
$63.00
801
001
FCTRNiSH & INSTALL 6"X6" MJ TEE, COMPLETE IN PLACE,
TNCLUDTNG LABOR A S .1 TE MATERIALS
E'4
2.00
5.00
S250.00
$750,00
801
002
FURNISH & rNSTALL 8°X8" MJ TEE COMPLETE IN PLACE
TN L DTN LAB R I M A
EA
6.00
10.00
$335.00
$L340.00
801
006
(CHANGE ORDER NO.07) FURNISH 8-- INSTALL 8" M]
EA
ADDAPTER COMPLETE TN PLACE INCLUDING LABOR
10.00
11.00
$215.00
S225.00
801
009
FURNISH & INSTALL 8" HYMAX ADAPTER, COMPLETE IN
PLACE INCLUDING LASO ASSOCIATED MATERIALS
12.00
14,00
SI,275,0D
S2,550,00
801
009
FURNISH & INSTALL 811X6" MJ REDUCER, COMPLETE IN
PLACE, TNCLUDTNG LAB R ASEQQATED MATERYALS
EA
2,00
3.00
$175,00
S175.00
901
015
FURNISH &INSTALL 6" MJ WITH 45 DEGREE BEND
CQMPLETF- IN PLAT 1NCL. ING LABOR ASSOCIATED
EA
12.00
22.00
$165.00
$1,650.00
908
001
FURNISH & INSTALL FIRE HYDRANT ASSEMBLY,
EA
COMPLETE IN PLACE~ OF THE AMERI AN DARLING B-
11.00
14,00
S3,545.00
$10,635.00
808
002
REMOVE &SALVAGE EXITING FIRE HYDRANT
ASS BLY MP T IN P WIT S
EA'
5.00
10.00
$500.00
$2.500.00
810
OQ3
7TN
FURNISH & INSTALL 6" VC CLASS 150-C-900 PVC
WATERLINE COMPLETE IN PLA E .LURING ALL
LF
1,357.00
i's13,00
$87.63
$13,670.28
fl10
004
(CHANGE ORDER NO.07) FURNISH & INSTALL S" VC
CLASS ISO-C-900 PVC WATERLINE COMPLETE IN PLACE
LF
8.562,00
9.111,00
S89.83
$49.316.67
811
001
FURNISH INSTALL 6" RESILENT WEDGE GATE VALVE &
VALVE BOX AS PE SE .T1Q 805 A 811
EA
9.00
19.00
S935.00
$9,350,00
811
002
FURNISH & INSTALL 8" RESILIENT WEDGE GATE VALVE
&VALVE ROX . AS PER FCTTONS 805 AND 811 OF TBE
EA
35.00_1
39,00
$1,260.00
$5,040,00
SUBTOTAL
$431,551.10
DELETE
168 001 VEGETATIVE WATERING Mir 649.00 371.00
$42A0
411,676,00
247 00.1 FLEX BASE (TY A) (GR 2) (8")(DC) ASPHALT TRANSITIONS SY 1,389.00 1.141.40
$23.00
-$6,932.80
340
001
° -"
TONS
595.00
214,03
$125.00
-$47,621.25
360
001
CONC PAV (8") (CL P)
SY
11.914.00
11.669.30
S63.00
415,479.10
360
002
CONC PAV (10") (CL P)
SY
51.363.00
48.323.36
$64.00
-$194,536.96
360
003
CONC PAV (10") (HES}
SY
2,900.00
2,743,52
$76.00
-$11,842,48
464
003
RCP 24u
LF
3.314.00
3229,00
$35,00
-$2,975.00
465
001
MANHOLES (COMPLETE) ( TY A)
EA
46,00
45.00
$7,810.00
47.810.00
529
001
CONC CURB (TY 11) (MONO) (CL A) (6")
LF
25.451,00
22.686.00
$4.30
-$3,28950
531
001
CONC SIDEWALKS (411)
SY
7,454,00
7,372.94
$35.40
-S2,869.52
531
003
CONC WHEELCHAIR RAMPS (41') TYPE 7
EA
34.00
32,00
$1,482.94
-S2,965,88
531
005
CONC WHEELCHAIR RAMPS (4") TYPE 10
EA
22,00
21.00
$1,996.54
41,996,54
644
001
RELOCATE SM RD SN SUP & AM
EA
55.00
19.00
S250.00
-S9,000,00
662
001
4" (W) (SLD) REMOVABLE
LF
27,61100
23.955.00
$0.54
-SI,974,78
662
002
8" (W) (SLD) REMOVABLE)
LF
1,077,00
326.00
$1,10
-$826.10
662
005
ARROW (W) REMOVABLE
EA
10,00
2.00
$69,00
-$552.00
662
006
WORD (W) REMOVABLE
BA
10.00
zoo
$69,00
-$552,00
666
005
REFL PAV MRK TY 7 (W) 12" (S LD)(I OOMIL)
LF
4.532.00
3.790.00
$2.30
-$1,706,60
666
006
REFL PAV MRK TY I (W) 24" (SLD)(I OOMIL)
LF
45.00
531,00
$6.35
$3,086, 10
666
014
REFL PAY MRK TY H (W) 12` (SLD)
LF
4,532.00
4,264,00
$1.35
4361.90
677
001
REMOVE PAVEMENT MARKINGS
LF
30,000.00
10,847.00
$0,44
48,427.32
678
003
PAV SURF PUP FOR MRK 0 2")
LF
4.532.00
4.264.00
S038
-$101 . 84
4640
1
1 5" CPP AASHTO M33 0 (DUAL GASKET)
LF
8.00
0,00
$150.00
41,200.00
9999
004
JOINT REPAIR (PIPE) 8" - 43" RC?
EA
12.00
3,00
$500,001
-$5,400.00
801
003
FURNISH &INSTALL 8`X6` MI TEE COMPLETEIN PLACE,
INCLUDING LABOR ASSOCTATED MATERIALS AND
EA
10,00
9.00
S310.00
-$620.00
801
004
FURNISH k, INSTALL VX8" MJ CROSS, COMPLETE IN
PLACEWC3, T)TN('tLAB!2E.ASS OCTATFDMATERTAI,S
,U
EA
5.00
2.00
S400.00
-$1,200.00
801
007
FURNISH &I INSTALL 6" MJ ADAPTER, COMPLETE IN
PLACE. INCLUDtN-Q 1,88012, ASSOCIATED MATERIALS
EA
6,00
4.00
$165.00
-$330.00
801
010
FURNISH &I INSTALL SOXT' MJ TAP, COMPLETE IN
PLACE, INCLUDIN Or LABOR ASSOCIATE) MATERIALS
EA
2,00.
0.00
$150.00
-$300.00
801
012
(CHANGE ORDER NO.07) FURNISH & INSTALL 8" MJ
WITH 45 DF(-yRFE BEND- MPFTTN PT ACF
EA
42.00
32.00
5225.00
-$2,250.00
801
013
(CHANGE ORDER NO.07) FURNISH & INSTALL S` MJ
WITH 22,5 DEGREE BENID, CO�RLET-E IN PLACE,
EA
4.00.
2,00
S225.00
-$450,00
$01
014
FURNISH & INSTALL 8` MJ WITH 11.25 DEGREE BEND
COMPLETE IN PLACE. TNCLUDM LABQR. A.S90CIATED
EA
2.00
0,00
$210.00
-$420.00
BIG
002
(CHANCE ORDER NO,6) FURNISH & INSTALL 2"" vc
,I A. 50-C-900 PVC W6TFa1,TNF E
, -COMPT, -TE TN PLACE,
LF
800.00
651.0 0:
S15=
-$2,235.00
BIG
006
FURNISH AND INSTALL TEMPORARY FIRE PROTECTION,
COMPLETE IN PLACE, TNCLUDINGALL SIZE(SI
LF
500.00
0,00
$25.50
-$12,750,00
2505
002
FURNISH & INSTALL 2" H DPE PE3409 SDR-9, 200 PST
LONG jrDF. SERVICE, CONNECTIONS. TNCLUDINa
EA
14.00
6,00
49,600.00
2505
003
FURNISH & INSTALL I" HDPS PE3403 SDR-9,200 PSI
SRORT SIDE SERVIE, QQNNE f.TJQN-,;. TN` .Q.LUI)NG
EA
279.00
46.00
.$1,200.00
$475,00
4110,675,00
2505
004
FURNISH & INSTALL V HDPE PE3409 SDR-9,200 PSI
LONQ ONNE LU- ING
,- - - STDE SE9VICE C , CTIONS INC D
EA
91.00
41,00
$580.00
-$29,000.00
2505
005
REMOVE & REPLACE EXISTING AIR RELASE VALVA
16ED PIPE, CMECTION TQ EXTqTINC, MAIN A MET R
EA
4.00
0.00
$1,525,00
-S6,100.00
SUBTOTAL
-$512,991. 7
TOTAL AMOUNT OF THIS CHANGE ORDER:
-$81,440.27
ORDE
DED*T THE ONTRACT.TIMEBYTWS-CAANGE
DA
ORIGINAL CONTRACT AMOUNT-
$ 15,984,397.88_
NET FROM PREVIOUS CHANGE ORDERS:
$ 546,711.04
TOTAL AMOUNT OF THIS CHANGE ORDER:
(91,440,27)
PERCENT OF THIS CHANGE ORDER:
-0.51%
TOTAL PERCENT CHANGE ORDER TO DATE:
2,91%
NEW CONTRACT AMOUNT:
$ 16,449,6%65
ORIGINAL CONTRACT TIME:
1005 Calendar Days
ADDITIONAL CONTRACT TIME PER PREVIOUS CHANGE ORDERS*.
587 Calendar Days
ADDITIONAL CONTRACT TIME PER THIS CHANGE ORDER-
0 Calendar Days
REVISED CONTRACT TIME:
1592 Calendar Days
CONDITION OF CHANGE: .
"Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Changt. Order represents full compensation for all
increases and decreases in the cost of, and the time required to perform the entire work under the contract arising directly or indirectly from this Change Order and all
previous Change Orders, Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change, Order represents an all inclusive, mutually
agreed upon adjustment to the Contract, and that Contractor will waive all rights to file a claim on this Change Order after it is properly executed,"
ACCEPTED BY:
ALLCO CONTRACTING, INC. DATE
CONTRACTOR
iRE-VIE ED 0 BY.
AMALIA VILLARREAL, P.E., CFM DATE
CITY ENGINEER
APPROVED BY:
KYLE HAYES DATE
CITY MANAGER
P WP A RIE BY:
DIRECTOR OF PUBLIC WORKS
AND TECHNOLOGY SERVICES
AAT E- D B Y.-
�.ajp"
-iINA BROUSSARD DATE
CITY CLERK