Loading...
HomeMy WebLinkAboutRES 21-332RESOLUTION NO. 21-332 WHEREAS, on May 12, 2020, the City Council of the City of Beaumont, Texas passed Resolution No. 20-099 awarding a contract in the amount of $1,473,000.00 for the Base Bid; Alternate Bid No. 1 in the amount of $12,000.00 for an ornate fence and gating between the existing door and the window openings in a secured courtyard; Alternate Bid No. 2 in the amount of $20,600.00 for a six-foot vinyl coated security fence and a concrete mow strip to secure access to the courtyards; and, $12 per square foot for saw cutting, removing material, installation of 3/8" dowels, pouring and finishing concrete to match existing patterns at an estimated cost of $20,000.00 to McInnis Construction, Inc., of Silsbee, Texas, for the Adaptive Restoration of the Tyrrell Park Visitors Center Project, and, WHEREAS, a contingency allowance in the amount of $100,000.00 was included in the above noted contract; and, WHEREAS, on October 20, 2020, the City Manager executed Change Order No. 1, in the amount of $13,110.00, to furnish and install approximately fifty (50) laminated mats around the building; frame and shore the roof deck; and credit for removal of contaminated debris on the floor and roofing materials down to the deck, thereby decreasing the contingency allowance to $86,890.00 and having no effect on the total contract amount of $1,505,600.00; and, WHEREAS, on January 19, 2021, the City Manager executed Change Order No. 2, in the amount of $6,132.00, to demo and pour back 511 square feet of concrete slab, thereby decreasing the contingency allowance to $80,758.00 and having no effect on the total contract amount of $1,505,600.00; and, WHEREAS, on March 30, 2021, the City Manager executed Change Order No. 3, in the amount of $3,741.00, to switch from three phase HVAC to single phase HVAC, thereby decreasing the contingency allowance to $77,017.00 and having no effect on the total contract amount of $1,505,600.00; and, WHEREAS, on March 30, 2021, the City Manager executed Change Order No. 4, in the amount of ($10,200.00), for adjustments and substitutions relating to electrical network/alarm wiring, thereby increasing the contingency allowance to $87,217.00 and having no effect on the total contract amount of $1,505,600.00; and, WHEREAS, on July 28, 2021, the City Manager executed Change Order No. 5, in the amount of $20,452.25, to relocate electrical service entry to a new built rack; pour concrete landing pad around new service; provide rack for service equipment and secondary feeders; and, restroom and hospitality room floor tiling, thereby decreasing the contingency allowance to $66,764.75 and having no effect on the total contract amount of $1,505,600.00; and, WHEREAS, on September 7, 2021, the City Manager executed Change Order No. 6, in the amount of $4,000.00, for the addition of the modification, powder coating and installation of the original gates and to fabricate and install one new gate, thereby decreasing the contingency allowance to $62,764.75 and having no effect on the total contract amount of $1,505,600.00; and, WHEREAS, on September 14, 2021, the City Manager executed Change Order No. 7, in the amount of $102,305.00, for the removal and re -construction of the concrete curb, gutter and sidewalk and shaping and regrading of the ditch, thereby decreasing the contingency allowance to $0.00 and increasing the total contract amount to $1,549,094.28; and, WHEREAS, Change Order No. 8, in the amount of $25,676.42 is necessary for the credit of base and asphalt; the credit for ditch cleaning; and, the addition of cement base treatment, thereby increasing the total contract amount to $1,574,770.70; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 8, in the amount of $25,676.42, for the additional work described above, thereby increasing the total contract amount to $1,574,770.70 for the Adaptive Restoration of the Tyrrell Park Visitors Center Project. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 14th day of December, 2021. ad�� O �( - Mayor Robin Mouton -