Loading...
HomeMy WebLinkAboutRES 21-318RESOLUTION NO. 21-318 WHEREAS, on December 15, 2020 the City Council of the City of Beaumont, Texas passed Resolution No_ 20-279 awarding a contract in the amount of $721,615.00 to BE)- Constructors, LLC d/b/a MK Constructors, of \/idor, Texas, for the Primer Street Lift Station Repairs Contract Project; and, WHEREAS, on October 20,2021 , the City Council of the City of Beaumont, Texas passed Resolution No_ 21-279 authorizing the City Manager to execute Change Order No_ 1, in the amount of $18,356.00, to remove and replace the existing deteriorated ductile iron piping and fittings in the wet well, thereby increasing the total contract amount to $739,971 _00; and, WHEREAS, Change Order No_ 2, in the amount of $87,620.00, is necessary to install a valve to isolate the force main from the drywall to remove and replace the existing valves, fittings and piping, thereby increasing the total contract amount to $827,591 .00; NOW, THEREFORE, BE IT RES(DLA/EE:) BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No_ 2, in the amount of $87,620.00 for the additional worK described above, thereby increasing the total contract amount to $827,591.00 for the Primer Street Lift Station Repairs Contract Project_ The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 7th day of December, 2021. — Mayor Robin Mouton - APPROVAL OF CONTRACT CHANGE PROJECT: City of Beaumont, Texas Lift Station & WWTP repairs Tropical storm Harvey Primer 5tr'eet Lift Station Bid No. WU1021-01 / FEMA 1148892 OWNER: City of Beaumont, Texas got Main Street Beaumont, Texas 777+ CONTRACTOR,.,, MK Constructors 2485 North Street Vldor, Texas 77662 TO THE OWNER: Approval of the following contract change Is requested'. Reason for Changes To furnish all labor, materials and equipment to Install a 20" AVT valve on the 20" force main to Isolate the force main from the drywell In order to remove and replace the existing, valves, fittings and piping. ORIGINAL CONTRACT A OUNTs 721,615.00 REVISED CONTRACT AMOUNT PER CHANGE ORDER No,1 73919,71.00 THIS CHANGE ORDER Item Description 11 Furnish all labor, materials and equipment to Install a 20" AVTvalve on the 2011 force main to Isolate the 87,920.00 force main from the drywell in order to remove and replace the existing valves, fittings and pipings ADD 87,820,00/L8 TOTAL AMOUNT OF THIS CHANGE DER: 87,620,09. TOTAL REVISED CONTRACT rANiO'UNT' INCLUDING' THI,S CHANGE ORDER: $ 827, 991,00 PERCENT OF THIS CHANGE ORDER 12,14 TOTAL PERCENT CHANGE ORDER TO DATE 14,69� CONTRACT TI M8 Original Contract Time: 180 calendar days Additional Contract Time per Previous Cha nge orders 28 calendar days Additional Contract Time per this Change orders 84 calendardays Rev►]sed Co Tlme 292 calendar days CONDITION OF CHANGE: "Contractor, acknowledges and agrees that the adjustments in contract price and contract time stipulated In this Change !order represents full compensation for all Increases and decreases In the cast of, and the time required to perform the entire work under the Contract arising directly or Indirectly from this Change Order and all previous Change Orders, Acceptance of this waiver constitutes an agreement between Owner and Contractor that the. Change Order represents an all Inclusive, mutually agreed upon adjustment to the Contract, and that Contractor will waive all rights to file a claim on this Change Order after It Is properly executed." ConstructorsMK Contractor Schaumburg olk, Inc. Engineer Deter Reviewed b Amalla, Villarreal, P.E. City Engineer Date:�i Approved by: Kyle Hayes City Manager 2. Date: 12, It / and Technology Services it % /y�� � i A , .r tested by: AlCk� I Ina Broussard City Clerk Date: