HomeMy WebLinkAboutRES 21-164RESOLUTION NO. 21-164
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
THAT the City Council hereby approves the purchase of construction services from
Construction Managers of Southeast Texas, LLC, of Port Arthur, Texas, for replacement
of the roof system at the Fleet Fire Maintenance Shop located at 1125 Archie Street, in
the amount of $200,675.00, through The Interlocal Purchasing System (TIPS)
Cooperative Purchasing Program.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 13th day of
July, 2021.
G�V�` MONT \,�1
- Mayor Robin Mouton -
®
S�
tittai� %1N�.<=
AGREEMENT
THIS AGREEMENT made this 20th day of July in the year 2021, by and between The City of
Beaumont, a legal entity organized and existing in the State of Texas, hereinafter designated as the
Owner, and Construction Managers of Southeast Texas, LLC hereinafter designated as the
CONTRACTOR.
The Owner and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
follows:
ARTICLE 1. THE WORK
The Contractor shall complete the Work as specified or indicated under the Bid Schedule(s) of the
Owner's Contract Documents entitled:
Contract to Replace the Roof System at the Fire Fleet Maintenance Facility
Located at
1125 Archie Street, Beaumont Texas
The Work is generally described as:
Furnishing_all labor, material, equipment, and to perform all work necessary to complete the
replacement of the entire roof system, make necessary deck repairs, and install metal panels where
asbestos siding has been removed. All work shall be performed as described and shown on City of
Beaumont Fire Maintenance Drawing A-1, A-2, and A-3 and as described in Construction
Managers of Southeast Texas's proposal dated June 24, 2021.
ARTICLE 2. TIME OF COMMENCEMENT OF COMPLETION
The Work to be performed under this Contract shall be commenced on the date specified by the Owner in
the Notice to Proceed and the Work shall be fully completed in 60 calendar days. .
The Owner and the Contractor recognize that time is of the essence of this Agreement and that the Owner
will suffer financial loss if the Work is not completed within the time specified in this Article 2, herein,
plus any extensions thereof allowed in accordance with Article 3 of the Instructions to Bidders. They also
recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss
suffered by the Owner if the Work is not completed on time. Accordingly, instead of requiring any such
proof, the Owner and the Contractor agree that as liquidated damages for delay. (but not as a penalty) the
Contractor shall pay the Owner the sum of $0 for each calendar day that expires after the time specified
in this Article 2, herein.
ARTICLE 3. CONTRACT PRICE
The Owner shall pay the Contractor for the completion of the Work in accordance with the Contract
Documents in current funds the Contract Price(s) named in the Contractor's Bid in the amount of
$200,675.00.
ARTICLE 4. THE CONTRACT DOCUMENTS
The Contract Documents consist of Scope of Work, Information Required of Bidder, Agreement,
Performance Bond, Payment Bond, Schedule of Prevailing Local Wage Rates, General Summary of the
Work, Technical Specifications, Drawings listed in the Schedule of Drawings in the Supplementary
General Conditions of the Contract, General Notes, Addenda Number N/A , inclusive, and all Change
Orders and Work Directive Changes which may be issued subsequent to the Effective Date of the
Agreement and are not attached hereto. Documents which will become part of these Contract Documents
subsequent to Award consist of. Notice of Award, Certificates of Insurance, Evidence of Workers
Compensation coverage, Surety's Powers of Attorney (to accompany the executed Performance and
Payment Bonds) and Notice to Proceed.
ARTICLE 5. PAYMENT PROCEDURES
Payment will be made in accordance with Article 5 of the General Conditions of Agreement.
ARTICLE 6. NOTICES
Whenever any provision of the Contract Documents requires the giving of written Notice, it shall be
deemed to have been validly given if delivered in person to the individual or to a member of the firm or to
an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified
mail, postage prepaid, to the last business address known to the giver of the Notice.
ARTICLE 7. MISCELLANEOUS
Terms used in this Agreement which are defined in Article I of the General Conditions and
Supplementary General Conditions will have the meanings indicated in said General Conditions_ and
Supplementary General. Conditions.
No assignment by a party hereto of any rights under or interests in the Contract Documents will be
binding on another party hereto without the written consent of the party sought to be bound; and
specifically but without limitation monies that may become due and monies that are due may not be
assigned without such consent (except to the extent that the effect of this restriction may be limited by
law), and unless specifically stated to the contrary in any written consent to an assignment no assignment
will release or discharge the assignor from any duty or responsibility under the Contract Documents.
The Owner and the Contractor each binds itself, its partners, successors, assigns, and legal representatives
to the other party hereto, its partners, successors, assigns, and legal representatives in respect of all
covenants, agreements, and obligations contained in the Contract Documents.
The Contractor agrees to indemnify and hold harmless the City, its officers, agents, and
employees from and against any and all claims or suits for injuries, damages, loss, or
liability of whatever kind of character, arising out of or in connection with the
performance by the Contractor of those services contemplated by this Agreement, based
upon the negligent acts of Contractor, its officers, agents, employees and expressly
including allegations of negligence, acts or omissions of the City of Beaumont, its
agents, officers or employees, when such negligence to the City arises from the
vicarious negligent performance of professional work undertaken by Contractor
hereunder.
IN WITNESS WHEREOF; the Owner and the Contractor have caused this Agreement to be executed the
;day and: year first written above. .
CITY OF'BEATJMONT Construction Manakers of'S.outheast Texas,.LLC.
STATE OF TEXAS L B CONTRACT
By: y.
City Manager Title:
Attest. Attest:tc�¢, u
City .Clerk 'Title:
3
WIT
(*zw
�P
225 HIGHWAY 365-PORT ARTHUR, TEXAS. 77640 - PHONE (409) 736 - 9010- FAX (4.09) 7369020
Tune 24, 2021
Jimmy Bevilacqua
Project Coordinator
184.8 Pine St.
.B'eaumont, TX 77704
Re: Fire_ Fleet Maintenance Building 1.125 Archie Beaumont, TX.
TIPS Reference #: 200201
Jimmy:
Please see below our proposal for the Fire Fleet Maintenance Building -Repairs on 1125 Archie St.
Scope of Work:
I.Remove-existing gravel with, spud machine down to vapor barrier over wood deck and remove, all gravel'off site.
2.Sweep clean existing surface to .be roofed.
3.1hstall overflow scuppers ,at drain- cutting notch out of angle — 4-inch-wide and two-inch=deep at each drain to
meet drainage standards.
4.Install tapered insulation between .drains to make crickets. to allow equal waterflow to each drain. ISO insulation
will be fully adhered with Duro-Last CR20 board max alybond adhesive in ribbon pattern.
5.Install'/z Dens deck Rilly adhered with DuroLast CR20 board maxin ribbons cover the entire surface of roof.
6.Install DuroLast 80 mil (ally adhered to dens deck with CR20 water base adhesive over entire roof surface.
7.Iustall pre -molded pipe boots, drain boots, wall flashing, term bar, etcwelded to roof surface.
8.1nstall new facial flashing two piece with cleat -and snap on facial — color to match. beams.
9. Approximately 100' of wall repairs.
10. Cover windows, with metal, panels and flashings
11. Deck Repairs as -listed on theproject drawings sheets A-1 thru A-3.
Cost for scope identified above:
Sincerely,
Construction Managers
of Southeast Texas, LLC
$200,675.0a
Jose Cardenas:
Comtruction,Managers
sr L of Southeast TexJLC
CC: Bruce Reyes— MOST