Loading...
HomeMy WebLinkAboutRES 21-034RESOLUTION NO. 21-034 WHEREAS, bids were received for a contract to furnish all labor, materials, and equipment for the Fleet Management Facility Parking Lot Reconstruction — Phase I Project; and, WHEREAS, McInnis Construction, Inc., of Silsbee, Texas, submitted a bid in the amount of $888,820.27, as shown on Exhibit "A," attached hereto; and, WHEREAS, City Council is of the opinion that the bid submitted by McInnis Construction, Inc., of Silsbee, Texas, is the lowest responsible bidder providing the best value to the City and should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the bid submitted by McInnis Construction, Inc., of Silsbee, Texas, to furnish all labor, materials, and equipment for the Fleet Management Facility Parking Lot Reconstruction — Phase I Project in the amount of $888,820.27, as shown on Exhibit "A," attached hereto, be accepted by the City of Beaumont; and, BE IT FURTHER RESOLVED THAT the City Manager be and he is hereby authorized to execute a contract with McInnis Construction, Inc., of Silsbee, Texas for the purposes described herein. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 9th day of February, 2021. Iai Beckyayor BID TABULATION Fleet Management Facility Parking Lot Reconstruction Project- Phase I Bid Number. PW1121-08 Bid Opening Date: Thursday, January 28, 2021 The Bid Proposals submitted have been reviewed en best of my knowledge this Is an accurate tabulation of the bids received. /?lc..��. 012q- 20z. By: Brandon Belaire, P.E., Roadway Engineer Date McInnis Construction, Inc. N&T Construction Brystar Contracting, Inc. MK Constructors SETEX Construction Corp. RAMTEX ALLCO Item No. Code Oeacrip5on Estimated Ouenoty Unit Unit Price Total Unit Price Total Unit P Total Unit Price Total Unit Pdce' Total Unit Price Total Unit Price Total 100 6001 PREPARING ROW 1 AC $ 8,51200 $ 8.51700 $ 4.320.00 $ 4,320.00 $ 16.000.00 $ 15,000.00 $ 2,750.OD S 2,750.00 S 2273.87 $ 2.273.87 $ - $ $ 6,000.00 $ 6,000.00 104 6001 REMOVING CONC PAV 5462 SY $ 8.31 $ 45,389.22 $ 4.88 $ 26,545.32 S 8.00 $ 43.696.00 $ 5.00 5 27,310.00 S 5.12 $ 27,9B5.44 $ 11.57 $ 63,210.58 $ 14.00 S 76,468.00 105 6000 REMOVING STAB BASE AND ASPHALT PAV 1832 SY $ 4.02 $ 7,364.64 $ 4.32 $ 7,914.24 $ 6.50 $ 11,908.00 $ 6.00 6 91160.00 $ 4.55 $ 8.335.60 $ 4.63 $ 8,474.94 $ 9.00 $ 16,488.00 110 6003 EXCAVATION (SPECIAL) 661 CY $ 21.46 $ 14.185.06 $ 9.72 $ 6,424.92 $ 16.01) $ 10,576.00 $ 11.0 $ 7,271.00 $ 10.23 $ 6,762.03 $ 25.72 $ 17,001.43 S 30.00 S 19,830.00 162 60D2 GRADINGAND BLOCKSOODING 4835 SY Is 3.28 5 15,858.80 S US $ 23,497.62 $ 7.00 $ 33,845.00 $ 5.00 S 24,175.00 S 4.55 $ 21.999.25 $ 3.74 $ 18,085.92 $ 6.00--$ 29.010.00 260 16002 JUME TREAT (HYDRATED LIME (SLURRY)) 155 TONS $ 439.261 $ 68.083.76 S 395.28 $ 61.268.40 $ 440.00 $ 68,200.00 $ 420.00 $ 65,100.00 $ 416.12 $ 64,499.60 $ 491,34 $ 76,158.36 1 $ 510.00 S 79,050.00 360 6000 CONC PAV (JRCP) (HES) (B-) 7092 SY $ 57.61 $408,570.12 $ 63.18 $ 448,07256 $ 67.00 $ 475,164.OD S 72.25 $ 512,397.00 $ 63.95 $ 453.533.40 $ 76.38 $ 541,701.53 $ 63.00 $ 446,798.00 427 6OD4 SILICONE RESIN PAINT FINISH 600 SF $ 4,64 $ 2.724.00 $ 6.30 $ 3,780.DO $ 6.00 $ 3,600,00 $ 9.00 $ 6,400.00 $ 2.04 $ 1,704.00 $ 4JI1 $ 2,406.47 $ %50 S 6,30D,00 464 6003 RC PIPE (CL 111) (181 80 LF $ 68.10 $ 5,448.00 $ 86.40 $ 6,912.00 $ 80.00 $ 6.400.00 $ 100.00 $ 8,000.00 $ 90.95 $ 7,Z76.00 $ 76.96 S 6.156.461 $ 131.00 $ 10,480.0D 467 6363 SET (lY II) (18') (RCP) (6:1) (P) 2 EA $ 1,021.50 $ 2,043.00 $ 810.00 $ 1,620.00 $ 800.00 $ 1,600.00 $ 1,100.00 $ 22DO.00 S 85270 $ 1.705.40 $ 788.01 S 1,576.02 $ 1,200.00 $ 2400.00 479 6000 ADJUSTINLET 1 EA $ 340.50 S 340.50 $ 540.00 $ 640.00 $ 1.000.00 $ f,000.00 $ 825.00 $ 825.00 $ 568A7 $ 568.47 $ 307.24 $ 307.24 $ 1.020.00 $ 1,020.00 496 6DO7 REMOVE STRUCTURE (PIPE) 245 LF $ 13.90 $ 3,405.50 $ 5AO $ 1,323.00 $ 12.00 $ 2,940.00 $ 7.00 $ 1,715.00 $ 5.68 $ 1.391.60 $ 17.44 $ 4,273.08 $ 37.DD $ 9,055.00 496 6023 REMOVE STRUCTURE (JUNCTION BOX) 2 EA $ 397.25 $ 794.50 $ 189.00 $ 378.00 $ 600.00 $ 1.200.00 $ 375.0D $ 750.00 $ 198.96 S 397.92 $ M14 S 1,068.27 $ 2230.00 $ 4,460.00 496 1 6030 REMOVE STRUCTURE (BOLLARD) 27 FA $ 105.10 $ 2,837.70 $ 54.00 $ 1A58.00 $ 100.00 $ 2,700.00 $ 55.00 $ 1.485.00 $ 66.85 $ 1,534.95 $ 4291 $ 1,158.66 $ 94.00 $ 2,538.00 500 60DI MOBILIZATION 1 LS S 2270.00 $ 2270.00 $ 66,303.64 $ 56,303.64 S 30,000.OQ $ 3D,ODO.00 $100,000.OD $ 100.000.00 $ 2273.87 $ 2,273.87 S 8.479.74 $ 8,479.74 $104,000.00 S 104,000.00 502 6001 BARRICADES, SIGNS, AND TRAFFIC HANDLING 5 MO $ 1,70250 $ 8,512.50 S 540.00 S 2,T00,00 $ 450.00 $ 2.250.00 S T70.00 S 3,850.00 $ 558.47 $ 2642.35 111.801.04 S 9.005.18 $ 600.00 $ 3,000.00 606 6020 CONSTRUCTION EXIT (INSTALL) 720 SY $ 18.91 S 13,615.20 $ 48.60 $ 34,99100 $ 35.00 $ 25.200.00 $ 55.00 $ 39,600.00 S 47.75 $ 34.380.00 $ 20.03 $ 14,419.35 $ 21.00 $ 15.120.00 606 6020 CONSTRUCTION EXIT (REMOVE) 72D SY $ 9AS $ 6.804.00 $ 10.80 $ 7.776.00 $ 7.00 $ 5.040.00 S 17.00 $ 72240,00 $ 11.37 $ 8.186.40 $ 5.59 $ 4,027.7B $ 1.90 $ 1,368.00 529 6002 CONC CURB (TY 11) 648 LF $ 5.11 S 3,311.28 $ 5.40 $ 3.499.2D $ 6.03 $ 31888.00 S 7.00 $ 4.535.00 $ 5.68 $ 3.680.64 $ 34.77 $ 22528.88 $ 8.00 $ 5.184.00 530 6008 TURNOUTS (ACP) (rY-D) (PG64-22) 675 SY $ 20.17 $ 13.614.75 $ 27.00 $ 18,225.00 $ 37-00 $ 21.600.00 $ 33.00 $ E2 275.00 $ 28A2 $ 19.183.50 $ 56.46 $ 38.111.69 $ 40.00 $ 27,000.00 550 6OD3 CHAIN LINK FENCE (REMOVE) SD LF $ 2270 S 1.135.00 $ 19.44 $ 972.04 S 6.00 $ 300.00 S 44,00 $ 2.200.00 $ 1.421.17 $ 71.058.50 $ 44.52 S 2.225.93 $ 27.00 $ 1,350.00 550 16009, CHAIN LINK FENCE (INSTALL) (BARB TOP) 50 LF $ 68.10 S 3,405.00 $ 41.04 $ 2.052.00 $ 25.00 $ 1.250.00 S 44.00 $ 2200.00 $ 2.160.18 $ 108.009.00 $ 29.29 $ 1,464A3 $ 41.00 $ 2050.00 552 6009 GATE (SPECIAL) (INSTALL AND REMOVE) (6' x 17) (DBL INCL) 2 EA $ 567.60 $ 1.135.00 $ 918.00 $ 1,836.00 $ 2,300.00 $ 4.600.00 S 5513.00 $ 1.100.00 $ 1,932.79 $ 3,86558 $ 995.81 Is 1,991.62 $ 925.00 S 1.850.00 760 6001 DITCH CLEANING AND RESHAPING 495 LF $ 624 $ 3,088.80 $ 8.64 $ 4.276.80 $ 14.00 $ 6,930.00 S 11.00 $ 5,446.00 $ 7.96 $ 3,940.20 $ 10.65 $ 5,270.3D $ 14.00 $ 6,930.00 5084 6001 FIXED BOLLARD 35 FA $ 255.38 $ 8,938.30 $ 243.00 S 8.505.00 $ 600.00 3 21.000.00 S 250.00 5 8,750.00 $ 244.44 $ 8.555.40 $ 397.97 S 13,928.97 $ 340.00 $ 11.9130.00 7165 6000 INSTALL GAS LINE (1-) 185 LF $ 21.57 S 3,990A5 $ 1796 $ 2397.60 $ 23.01) $ 4.255.00 S 21M S 3,885.00 $ 13.64 S 2523.40 $ 59.98 $ 11,096.85 $ 34.00 5 Q290.00 7165 6008 REMOVE EXISTING GAS PIPE AND VALVES 185 LF $ 10.90 $ 2.016.50 $ 324 $ 599AO $ 5.00 $ 925.00 S 9.00 $ 1,665.00 $ 3.41 $ 630.85 $ 17.57 $ 3,251.03 $ 20.00 $ 3.700.00 7171 6025 EXISTING WATER LINE (REMOVE) 483 LF $ 13.62 $ 6,578.46 $ 7.38 S 3,562.92 $ 5.00 $ 2,416.00 $ 7.00 $ 3,38150 $ 7.77 $ 3.76291 S 7.03 $ 3,395,13 $ 36.00 $ 17,388,OD 7172 6024 REMOVE EXISTING SAN SEWER PIPE 245 LF $ 13.62 $ 3,336,90 $ 13.2J $ 3,241.08 $ 6.00 $ 1,470.00 S 7.00 $ 1,715.00 $ 13.93 S 3,41285 $ 21.09 S 5,166.50 $ 40.00 $ 9,800.00 9000 1000 REMOVE AND REPLACE FUEL TANK 11 EA 1 $188.054.53 $188,054.63 5201,278.52 1 $ 201.278.62 1 5220,000.00 $ 220,000.00 5764,000.00 $ 184,000.00 I $197A28.43 1 $ 197,428.43 1 $200,322.08 $ 200.322.08 1 $209,000.00 1 $ 209,600.00 801 100 FURNISH & INSTALL 4" x 2" TAP CAP 1 EA S 163.44 $ 163.44 S 15120 $ 151.20 $ 200.00 $ 200.00 $ 160.00 $ 160.00 $ 159.17 $ 169.17 $ 326.86 $ 326.86 $ 186.00 $ 186.OD 601 101 FURNISH & INSTALL 4"x4" MJ TEE 1 EA $ 924.37 $ 624.37 $ 311.04 $ 311.04 $ 300.00 $ 300.DD $ 500.00 S 500.00 $ 327A4 $ 327.44 $ 449.87 S 449.87 $ 964.00 S 96430 801 102 FURNISH & INSTALL 4"45-DEGREE BEND 7 EA $ 368.88 $ 2,587-16 $ 216.00 $ 1.512.00 $ 220.00 $ 1.540.00 $ 358.00 $ 2,505.00 $ 2Z7.39 $ 1,591.73 $ 373.72 $ 2616.05 $ 650.00 $ 4,550.00 805 100 CLEANOUT & VALVES 3 EA $ 48238 $ 1,447.14 $ 864.01) $ 2,59200 $ 160.00 $ 450.00 $ 468.00 $ 1,404.00 S 909.55 $ 2,728.65 $ 267.11 $ 801.34 $ 1,470.00 $ 4,410.00 810 100 PVC PRESSURE WATER PIPE (4') (C900) 478 LF $ 34.79 $ 16.629.62 $ 25.92 $ 12,389.76 S 30.00 $ 14,340.00 $ 34.00 $ 16.252.00 $ 2729 S 13.044.62 $ 5Q.38 $ 24,079.89 $ 59.00 $ 28,20200 811 100 FURNISH & INSTALL 4" GATE VALVE 1 EA $ 1,004.48 $ 1,004.48 $ 761.4D $ 761.40 $ 800.00 $ 80D.DD $ 976.00 $ 975.00 $ 801.64 $ 801.54 $ 1,015.73 $ 1.016.73 $ 1,400.00 $ 1,400.00 813 100 HDPE DR11 (4') (SAN SEWER) 245 LF $ 3201 IS 7.842.45 $ 4536 $ 11,113.20 $ 25.00 $ 6,125.00 S 32DO $ 7,840.00 $ 47.75 $ 11.698.75 $ 71A6 $ 17.608.71 $ 100.00 $ 24,500.00 1000 1 100 1 CONNECT PROPOSED TO EXISTING 5 1 EA $ 65263 $ 3,263.15 $ 54.00 $ 270.00 $ 130.00 $ 650.00 $ 660.00 $ 3,300.00 $ 56.85 $ 294.25 $ 374.89 $ 1.874.47 $ 3,170.00 $ 15,850,00 Bid Total $888,820.27 $ 975,371.72 $1,053,357.00 $1,D98,317.00 $1,104,306.56 $1.134,937.31 $1,215.897.00 .............................. BRANDON G. BELAIRE ............................. 138396 BEAUMONT Public Works Page 1 of 1 m 2 X W