HomeMy WebLinkAboutRES 21-033RESOLUTION NO. 21-033
WHEREAS, bids were received for a contract to furnish all labor, materials,
equipment, and supplies for the Cattail Marsh Wetlands Repair Project; and,
WHEREAS, Solid Bridge Construction, LLC, of Huntsville, Texas, submitted a bid
in the amount of $953,415.45, as shown on Exhibit "A," attached hereto; and,
WHEREAS, City Council is of the opinion that the bid submitted by Solid Bridge
Construction, LLC, of Huntsville, Texas, is the lowest responsible bidder providing the
best value to the City and should be accepted;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the bid submitted by Solid Bridge Construction, LLC, of Huntsville, Texas,
to furnish all labor, materials, equipment, and supplies for the Cattail Marsh Wetlands
Repair Project in the amount of $953,415.45, as shown on Exhibit "A," attached hereto,
be accepted by the City of Beaumont; and,
BE IT FURTHER RESOLVED THAT the City Manager be and he is hereby
authorized to execute a contract with Solid Bridge Construction, LLC, of Huntsville,
Texas, for the purposes described herein.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 9th day of
February, 2021.
61t/w
Mayor Becky Ames -
BID TABULATION
CITY OF BEAUMONT, TEXAS
CATTAIL MARSH WETLAND REPAIR
BID No. PW1121-06/ FEMA PROJECT No. 13339 & No. 39195
Solid Bridge Construction LLC
McInnis Construction, Inc.
Brystar Contracting, Inc.
ALLCO, LLC
1204 Sam Houston Ave, Suite 1
675 S. 4th Street
8385 Chemical Rd.
6720 College Street
Item
Qty
Unit
Description
Huntsville, TX 77340
Silsbee, TX 77656
Beaumont, TX 77705
Beaumont, Texas 77707
Unit Price I Item Total
Unit Price I Item Total
Unit Price I Item Total
Unit Price Item Total
BAS
ID IT
MS
1.
1
LS
Mobilization, Including payment bond, performance bond, insurance, moving equipment to project, and demobilization,
$10,000.00
$20,500.00
$20,500.00
$30,000.00
$30,000.00
$35,OOD.00
$35,000.00
all in strict conformance with plans ands specifications; NOT TO EXCEED 3 % OF TOTAL PROJECT BID for,$10,000.00
Exterior Slope Repair 1A - repair the exterior levee slope including removing vegetation, scarify existing levee slope 3"
2.
1
LS
deep, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all in
$4,503.00
$4,503.00
$9,602.50
$9,602.50
$5,000.00
$5,000.00
$16.733.17
$16,733.17
accordance with the plans andspecifications for
Exterior Slope Repair 1B - repair the exterior levee slope Including removing vegetation, scarify existing levee slope 3"
3.
1
LS
deep, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all in
$8,255.00
$8.255.00
$20,462.50
$20,462.50
$12,000.00
$12,000.00
$23.109.39
$23,109.39
accordance with the plans ands ecifications for
Exterior Slope Repair 1C - repair the exterior levee slope including removing vegetation, scarify existing levee slope 3"
4.
1
LS
deep, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$12,587.00
$12,587.00
$34,572.50
$34,572.50
$22,000.00
$22,000.00
$29,443.43
$29,443.43
accordance with the plans ands ecifications for
Exterlor Slope Repair 1F - repair the exterior levee slope including removing vegetation, scarify existing levee slope 3"
5.
1
LS
deep, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all in
$9,010.00
$9,010.00
$26,275.00
$26,275.00
$14,000.00
$14,000.00
$32,915.70
$32.915.70
accordance with the plans andspecifications for
Exterior Slope Repair 2A - repair the exterior levee slope including removing vegetation, scarify existing levee slope 3"
6.
1
LS
deep, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$1,742.00
$1,742.00
$4,935.00
$4.935.00
$2,500.00
$2.500.00
$17,299.86
$17,299.86
accordance with the plans andspecifications for
Exterior Slope Repair 2B - repair the exterior levee slope including removing vegetation, scarify existing levee slope 3"
7.
1
LS
deep, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all in
• $10,083.00
$10,083.00
$26.002.50
$26,002.50
$13,000.00
$13,000.00
$27,699.97
$27,699.97
accordance with the plans ands ecifications for
Exterior Slope Repair 2C - repair the exterior levee slope Including removing vegetation, scarify existing levee slope 3"
8.
1
LS
deep, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$3,982.00
$3.982.00
$9.185.00
$9,185.00
$4,500.00'
$4,500.00
$17.861.86
$17,861.86
accordance with the plans andspecifications for
Exterior Slope Repair 4A - repair the exterior levee slope including removing vegetation, scarify existing levee slope 3"
9.
1
LS
deep, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$3,350.00
$3,350.00
$7,625.00
$7,625.00
$4,000.00
$4,000.00
$17,380.30
$17,380.30
accordance with the plans andspecifications for
Exterior Slope Repair 4C - repair the exterior levee slope Including removing vegetation, scarify existing levee slope 3"
10.
1
LS
deep, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$24,107.00
$24,107.00
$70,172.60
$70,172.50
$36,000.00
$36,000.00
$47,163.87
$47,163.87
accordance Wth the plans ends ecifications for
Exterior Slope Repair 5A - repair the exterior levee slope Including removing vegetation, scarify existing levee slope 3"
11.
1
LS
deep, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$7,778.00
$7,778.00
$22,115.00
$22,115.00
$12,500.00
$12.500.00
$28.784.88
$28,784.88
accordance with the plans andspecifications for
Interior Slope Repair 3A - repair the interior levee slope Including removing vegetation, scarify existing levee slope 3"
12.
1
LS
deep, reconstructing the interior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all in
$6,979.00
$6,979.00
$16,932.50
$16,932.60
$8,000.00
$8,000.00
$26,252.26
$26,252.26
accordance with the plans andspecifications for
Interior Slope Repair 3B - repair the interior levee slope including removing vegetation, scarify existing levee slope 3"
13.
1
LS
deep, reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$9,501.00
$9,501.00
$27,367.50
$27,367.50
$15,000.00
$15,000.00
$33,174.15
$33,174.15
accordance wfth the plans ands ecifications for
Interior Slope Repair 3C -repair the interior levee slope including removing vegetation, scarify existing levee slope 3"
14.
1
LS
deep, reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$17,274.00
$17,274.00
$50,295.00
$50,295.00
$27,000.00
$27,000.00
$44,279.50
$44,279.50
accordance with the plans ands ecifications for
Interior Slope Repair 3D -repair the interior levee slope including removing vegetation, scarify existing levee slope 3"
15.
1
LS
deep, reconstructing the Interior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all in
$5,701.00
$5.701.00
$15,167.50
$15,167.50
$7.500.00
$7,500.00
$25,919.01
$25,919.01
accordance with the plans andspecifications for
dEBid Opening Documents Pre thru AwardBid Tabulation
1/14/2021 4:40 PM Page 1 of 5
q
_m
X
LLI
BID TABULATION
CITY OF BEAUMONT, TEXAS
CATTAIL MARSH WETLAND REPAIR
BID No. PW1121-06/ FEMA PROJECT No. 13339 & No. 39195
Solid Bridge Construction LLC
McInnis Construction, Inc.
Brystar Contracting, Inc.
ALLCO, LLC
1204 Sam Houston Ave, Suite 1
675 S. 4th Street
8385 Chemical Rd.
6720 College Street
Item
City
Unit
tlon
Description
P
Huntsville, TX 77340
Silsbee, TX 77656
Beaumont, TX 77705
Beaumont, Texas 77707
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Interior Slope Repair 3E - repair the Interior levee slope including removing vegetation, scarify existing levee slope 3"
16.
1
LS
deep, reconstructing the interior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$3,677.00
$3,677.00
$8,047.50
$8,047.50
$4,500.00
$4,500.00
$16,624.47
$16,624.47
accordance with the plans and specifications for
Interior Slope Repair 3F - repair the Interior levee slope including removing vegetation, scarify existing levee slope 3"
17.
1
LS
deep, reconstructing the Interior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$2,392.00
$2,392.00
$5,960.00
$5,960.00
$3,000.00
$3,000.00
$17,438.36
$17,438.36
accordance with the plans andspecifications for
Interior Slope Repair 4B - repair the Interior levee slope including removing vegetation, scarify existing levee slope 3"
18.
1
LS
deep, reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$3,505.00
$3,505.00
$8,437.50
$8,437.50
$4,000.00
$4,000.00
$16,954.23
$16,954.23
accordance with the plans andspecifications for
Interior Slope Repair 4D - repair the interior levee slope including removing vegetation, scarify existing levee slope 3"
19.
1
LS
deep, reconstructing the interior slope in compacted lifts, and hydro -mulch seed the repaired levee slope, all in
$16,949.00
$16,949.00
$49,707.50
$49,707.50
$26.000.00
$26.000.00
$45,417.55
$45,417.55
accordance with the plans andspecifications for
Interior Slope Repair 4E - repair the interior levee slope including removing vegetation, scarify existing levee slope 3"
20.
1
LS
deep, reconstructing the Interior slope In compacted lifts, and hydro -mulch seed the repaired levee slope, all In
$10,977.00
$10.977.00
$32,997.50
$32.997.50
$15,500.00
$15,500.00
$43,794.15
$43,794.15
accordance with the plans ands ecifications for
Interior Slope Repair 1D - repair the Interior levee slope including steel sheet pile coffer dam, removing vegetation,
21.
1
LS
scarify existing levee slope 3" deep, reconstructing the Interior slope In compacted lifts, and hydro -mulch seed the
$26,242.00
$26.242.00
$87,135.00
$87,135.00
$420,000.00
$420,000.00
$293,102.26
$293,102.26
repaired levee sloe all in accordance with the plans ands ecifications for
Interior Slope Repair 1 E - repair the interior levee slope including steel sheet pile coffer dam, removing vegetation,
22.
1
LS
scarify existing levee slope 3" deep, reconstructing the interior slope in compacted lifts, and hydro -mulch seed the
$11,167.00
$11,167.00
$35,822.50
$35.822.50
$195,000.OD
$195,000.00
$130,402.09
$130,402.09
repaired levee sloe all in accordance with the plans andspecifications for
Install geotextile fabric and crushed limestone road material on the top of the finished berm, TEN FOOT (10') wide top of
$34.00
$40.460.00
$47.90
$57.001.00
$60.00
$71.400.00
$72.56
$86,346.40
23.
1,190
LF
berm all in accordance wlth the plans andspecifications for
Install geotextile fabric and crushed limestone road material on the top of the finished berm, TWELVE FOOT (12') wide
$38.00
$89.452.00
$51.40
$120,995.60
$60.00
$141.240.00
$55.75
$131,235.50
24.
2.354
LF
top of berm all in accordance with the plans andspecifications for
Sampling Station - construct outfall sampling station Including reinforced concrete pad and fence post, relocate chain
25.
1
LS
link fence, gate and cover, relocate sampler and electrical conduit/conductors. abandon existing pad, all in accordance
$20,900.00
$20,900.00
$34,940.00
$34,940.00
$18,000.00
$18,000.00
$17,792.24
$17,792.24
with the plans andspecifications for
Miscellaneous Improvements -furnish all labor, materials, and equipment to perform all miscellaneous improvements,
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$100.000.00
26.
1
ALLOW
as directed bV the Owner.
LTERNATEBD
ITEMS
Exterior Slope Mitigation 1A - reconstruct the exterior levee slope Including removing existing crushed limestone and
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$11,346.15
$11,346.15
$18,047.00
$18,047.00
$14,500.00
$14,500.00
$41,060.36
$41,060.36
2A
1
construct 3' deep clay key, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all in accordance with the plans andspecifications far•
Exterior Slope Mitigation 1 B - reconstruct the exterior levee slope including removing existing crushed limestone and
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$17,067.75
$17,067.75
$31,662.50
$31,662.50
$23.000.00
$23,000.00
$44,072.30
$44,072.30
3A
1
LS
construct T deep clay key, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all In accordance with the plans andspecifications for
Exterior Slope Mitigation 1C - reconstruct the exterior levee slope Including removing existing crushed limestone and
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$23.194.35
$23,194.35
$43,002.50
$43,002.50
$31,000.00
$31,000.00
$45,721.32
$45.721.32
4A
1
LS
construct 3' deep clay key, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the reconstructed
levee slope, all In accordance with the plans andspecifications for
df:Bid Opening Documents Pre thru AwardBid Tabulation
1/14/2021 4:40 PM Page 2 of 5
BID TABULATION
CITY OF BEAUMONT, TEXAS
CATTAIL MARSH WETLAND REPAIR
BID No. PW1121-06/ FEMA PROJECT No. 13339 & No. 39195
, a 4 � o.nn our
Solid Bridge Construction LLC
McInnis Construction, Inc.
Brystar Contracting, Inc.
ALLCO, LLC
1204 Sam Houston Ave, Suite 1
675 S. 4th Street
8335 Chemical Rd.
6720 College Street
Item
Qty
Unit
Description
Huntsville, TX 77340
Silsbee, TX 77656
Beaumont, TX 77705
Beaumont, Texas 77707
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Exterior Slope Mitigation 1 F - reconstruct the exterior levee slope including removing existing crushed limestone and
5A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$27,412.50
$27.412.50
$50,750.00
$50,750.00
$37,000.00
$37,000.00
$47,989.78
$47,989.78
construct 3' deep clay key, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all in accordance Wth the plans andspecifications for
Exterior Slope Mitigation 2A - reconstruct the exterior levee slope including removing existing crushed limestone and
6A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$g 428 10
$8,428.10
$15,500.00
$15,500.00
$11,500.00
$11,500.00
$36,837.78
$36,837.78
construct 3' deep clay key, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all in accordance with the plans andspecifications for
Exterior Slope Mitigation 2B - reconstruct the exterior levee slope including removing existing crushed limestone and
7A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$31,112.15
$31,112.15
$62,547.50
$62,547.50
$46,000.00
$46,000.00
$67,333.88
$67,333.88
construct 3' deep clay key, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all in accordance with the plans andspecifications for
Exterior Slope Mitigation 2C - reconstruct the exterior levee slope including removing existing crushed limestone and
8A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$11,661.10
$11,661.10
$22.865.00
$22,865.00
$16,600.00
$16,600.00
$37,929.77
$37,929.77
construct 3' deep clay key, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all in accordance with the plans ands ecifications for
Exterior Slope Mitigation 4A - reconstruct the exterior levee slope Including removing existing crushed limestone and
9A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$10,431.50
$10,431.50
$17,690.00
$17,690.00
$12,600.00
$12,600.00
$36,550.25
$36,550.25
construct 3' deep clay key, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all In accordance with the plans ands ecifications for
Exterior Slope Mitigation 4C - reconstruct the exterior levee slope including removing existing crushed limestone and
10A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$56,692.00
$56,692.00
$133,617.50
$133,617.50
$98,000.00
$98,000.00
$74,704.86
$74,704.86
construct 3' deep clay key, reconstructing the exterior slope In compacted lifts, and hydro -mulch seed the reconstructed
levee slope. all in accordance with the plans andspecifications for
Exterior Slope Mitigation 5A - reconstruct the exterior levee slope Including removing existing crushed limestone and
11A
1
LS
stockpile on -site, remove and dispose existing geotextlle fabric, stripping the vegetation, removing a 2' layer of clay fill,
$19,584.90
$19,584.90
$36,785.00
$35,785.00
$26,500.00
$26,500.00
$45,704.00
$45,704.00
construct 3' deep clay key, reconstructing the exterior slope in compacted lifts, and hydro -mulch seed the reconstructed
levee sloe all In accordance with the plans andspecifications for
Interior Slope Mitigation 3A - reconstruct the Interior levee slope Including removing existing crushed limestone and
12A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$19,241.95
$19,241.95
$31,752.50
$31,752.50
$23,200.00
$23,200.00
$42,646.09
$42,646.09
reconstructing the Interior slope In compacted lifts, and hydro -mulch seed the reconstructed levee slope, all In
accordance with the plans andspecifications for
Interior Slope Mitigation 3B - reconstruct the Interior levee slope including removing existing crushed limestone and
13A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$23,1B4.05
$23,184.05
$38,475.50
$38,475.50
$28.100.00
$28,100.00
$43,699.00
$43,699.00
reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the reconstructed levee slope, all in
accordance w th the plans andspecifications for
Interior Slope Mitigation 3C - reconstruct the Interior levee slope Including removing existing crushed limestone and
14A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$39,394.00
$39,394.00
$75,155.00
$75.155.00
$55,200.00
$55,200.00
$56.507.06
$56,507.06
reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the reconstructed levee slope, all In
accordance with the plans andspecifications for
Interior Slope Mitigation 3D - reconstruct the Interior levee slope including removing existing crushed limestone and
15A
1
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$17,758.05
$17,758.05
$27,972.50
$27,972.50
$20,500.00
$20,500.00
$42,250.69
$42,250.69
reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the reconstructed levee slope, all in
accordance with the plans andspecifications for
dt ld Opening Documents Pre thru AwardBid Tabulation
1/14/2021 4:40 PM Page 3 of 5
BID TABULATION
CITY OF BEAUMONT, TEXAS
CATTAIL MARSH WETLAND REPAIR
BID No. PW1121-06/ FEMA PROJECT No. 13339 & No. 39195
ow urorv,rvu
un, c: ,
Solid Bridge Construction LLC
McInnis Construction, Inc.
Brystar Contracting, Inc.
ALLCO, LLC
1204 Sam Houston Ave, Suite 1
675 S. 4th Street
83BS Chemical Rd.
6720 College Street
Item
Oty
Unit
Description
P
Huntsville, TX 77340
Silsbee, TX 77656
Beaumont, TX 77705
Beaumont, Texas 77707
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Interior Slope Mitigation 3E - reconstruct the Interior levee slope including removing existing crushed limestone and
LS
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$g 356.85
$9,356.85
$13,662.50
$13,662.50
$10,000.00
$10,000.00
$36,529.57
$36,529.57
16A
1
reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the reconstructed levee slope, all in
accordance with the plans andspecifications for
Interior Slope Mitigation 3F - reconstruct the Interior levee slope Including removing existing crushed limestone and
stockpile on -site, remove and dispose existing geotextiie fabric, stripping the vegetation, removing a 2' layer of clay fill,
$8 203.60
$8,203.60
$11,840.00
$11,840.00
$8.500.00
$8,500.00
$36,807.39
$36.807.39
17A
1
LS
reconstructing the Interior slope in compacted lifts, and hydro -mulch seed the reconstructed levee slope, all In
accordance with the plane andspecifications for
Interior Slope Mitigation 48 - reconstruct the interior levee slope including removing existing crushed limestone and
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a T layer of clay fill,
$10,852.25
$10.852.25
$16,002.50
$16,002.50
$11.500.00
$11,500.00
$37,434.50
$37.434.50
18A
1
LS
reconstructing the interior slope in compacted lifts, and hydro -mulch seed the reconstructed levee slope, all in
accordance with the plans andspecifications for
Interior Slope Mitigation 4D - reconstruct the Interior levee slope including removing existing crushed limestone and
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a T layer of clay fill,
$43,076.00
$43,076.00
$77,517.50
$77,517.50
$57,000.00
$57,000.00
$57,216.79
$57,216.79
19A
1
LS
reconstructing the Interior slope In compacted lifts, and hydro -mulch seed the reconstructed levee slope, all In
accordance with the plans ands ecifications for
Interior Slope Mitigation 4E - reconstruct the Interior levee slope Including removing existing crushed limestone and
stockpile on -site, remove and dispose existing geotextile fabric, stripping the vegetation, removing a 2' layer of clay fill,
$33,619.85
$33,619.85
$58,842.50
$58,842.50
$43,000.00
$43,000.00
$55,206.20
$55,206.20
20A
1
LS
reconstructing the interior slope in compacted lifts, and hydro -mulch seed the reconstructed levee slope, all in
accordance with the plans andspecifications for
Interior Slope Mitigation 1D - reconstruct the Interior levee slope including including steel sheet pile coffer dam,
LS
removing existing crushed limestone and stockpile on -site, remove and dispose existing geotextiie fabric, stripping the
$203,967.00
$203,967.00
$155,330.00
$155,330.00
$510,000.00
$510,000.00
$293,819.83
$293,819.83
21A
1
vegetation, removing a 2' layer of clay fill, reconstructing the interior slope In compacted lifts, and hydromuich seed the
reconstructed levee sloe all in accordance with the plans ands ecifications for
Interior Slope Mitigation 1 E - reconstruct the Interior levee slope Including Including steel sheet pile coffer dam,
removing existing crushed limestone and stockpile on -site, remove and dispose existing geotextile fabric, stripping the
=$67,019.35$67,019.35
$50,237.50
$50,237.50
$225,000.00
$225,000.00
$193,861.65
$193,861.65
22A
1
LS
vegetation, removing a 2' layer of clay fill, reconstructing the interior slope in compacted lifts, and hydromuich seed the
reconstructed levee sloe all in accordance with the plans ands ecifications for
D
V I
ITE
Interior Slope Protection - furnish and Install ROCK RIP -RAP, Including filter fabric, in accordance with the plans and
$116.00
$896.100.00
$51.88
$400,773.00
$103.00
$795,675.00
$96.41
$744.767.25
27.
7,725
TON
s ecifications for
Outfall Channel Protection - furnish and Install ROCK RIP -RAP, w0hout filter fabric, in accordance with the plans and
$116.00
$104,400.00
$131.63
$118.467.00
$118.00
$106,200.00
$122.12
$109,908.00
28.
900
TON
specifications o
BASE BID TOTAL (ITEMS 1.26)
$460,573.00
$902,254.10
$1.211.640.00
$1,322,124.60
ALTERNATE BID TOTAL (ITEMS 1 +23.26+2A.22A)
$953,415.45
$1,322,691.60
$1.669,340.00
$1,744,257.21
ADDITIVE BID ITEM TOTAL (ITEMS 27-28)
$1,000,500.00
$519,240.00
$901,875.00
$854,675.25
df:Bld Opening Documents Pre thru AwardBld Tabulation
1/14/2021 4:40 PM Page 4 of 5
BID TABULATION
CITY OF BEAUMONT, TEXAS
CATTAIL MARSH WETLAND REPAIR
BID No. PW1121-061 FEMA PROJECT No. 13339 & No. 39196
Item
Qty
Unit
Description
Solid Bridge Construction LLC
1204 Sam Houston Ave, Suite 1
Huntsville, TX 77340
McInnis Construction, Inc.
675 S. 4th Street
Silsbee, TX 77656
Brystar Contracting, Inc.
8385 Chemical Rd.
Beaumont, TX 77705.
ALLCO, LLC
6720 College Street
Beaumont, Texas 77707
Unit Price Item Total
Unit Price Item Total
Unit Pd. Item Total
Unit Price Item Total
AknoMed aAddendumNo.1
Y
y
y
y
Aknowled e.Addendum No. 2
Y
y
y
y
AknoMed aAddendumNo.3
y
Y
Y
y
Required Forms Checkllst
Y
y
y
y
Bid
y
y
y
y
Bid Schedule
y
y
y
y
Bid Summary
y
y
y
y
Corporate Resolution
y
y
y
y
Bid Bond
y
y
y
y
Information Required of Bidder
y
y
y
y
Conflict of Interest Questionnaire
y
y
y
y
Statement of City Charter Provision of Conflict of Interest
y
y
y
y
Insurance Requirement Affidavit
y
y
y
y
MBE Schedule C
Y
y
y
y
House Bill 89
y
y
y
y
Non -Collusion Form
y
y
y
y
The Bid Proposals submitted have been reviewed, and to the best of my knowledge this is an accurate tabulation of the Bids received.
Revised 1114121 to correct the ADDITIVE BID ITEM TOTAL (ITEMS 27-28)
6° * �°
JEFFREY G. BEAVER
�P •a . 60676
df:Bld Opening Documents Pre lhru AwardBid Tabulation
1/142021 4:40 PM Page 5 of 5