Loading...
HomeMy WebLinkAboutHCD-1.21P-1 DATE: July 8, 2002 TO: Historic Landmark Commission FROM: Stephen C. Richardson, Planning Manager SUBJECT: Request for approval of a historic preservation loan for 2394 Calder FILE: HCD-1.21 STAFF REPORT The Planning Manager recommends approval of this request for a historic preservation loan. Dr. Jerry Johnson, the property owner, wishes to renovate the house at 2394 Calder so that he can rent it out for a psychologist office. The dollar amount of the request is for $31, 879.00. The work to be done to the house includes leveling the foundation, some exterior asbestos abatement and re -roofing. The house is one of three properties on the north side of Calder that are included in the Oaks Historic District. This property is not listed in SPARE. Dr. Johnson states that the house was built in 1915. The monthly payments will be $442.76 per month for 72 months. Exhibits are attached. ENVIRONMENTAL GROUP P.O. Box 357 Groves, Texas 77619 Office: 409-962-8655 Fax: 409.962-4027 Ms. Colleen Christie 2685 Harrison Beaumont, Texas 77702 SUBJECT: Budget estimate for 2394 Calder asbestos abatement Dear Ms. Christie, As per our conversation and reviewing the asbestos contents of the area, it is our estimate that these materials can be removed and disposed of for a combined sum of $10,000.00. The removal portion at approximately $7000.00 and the consulting portion design- ated to the remaining $3,000.00 represent a break down of this figure. Please contact our office if you have any further questions. Sincerely, President GFI Environmental Professional Iridustrial Hygiene Services RockSofid Foundation Systems 1 Over fourteen years experience of quality service working for you! It is agreed between Rock Solid Foundation Systems and Owner(s) that in the event there is any disagreement or dispute arising out of an aspect of this Proposal and Contract, the parties shall attempt to resolve any dispute through a non -binding, mediation. If non -binding mediation is not sucoessful, the parties agree that any and all disputes, claims or causes of action shall be submitted to binding arbitration before the American Association, In accordance with the rules and regulations therein. I Total Cost of Proposed Work ��g� /U s f -••'� 7 1r { . yz 5. 10r Payable as: Scheduling Deposit 3 OOW, r_ Contractor's Draw (Around % Completion) -Y 3, aod, Upon Completion - Z, y'Z S r The final payment made to Robert Berry, ]r. or Rock Solid Foundation Systems will signify that the Owner(s) of the property or the financially responsible party are of total satisfaction with all work performed and are in full acceptance of this contract If final payment is not received on the date of completion, an eighteen percent (18%) interest charge per day shall apply to the unpaid balance until paid in fell. Acceptance I/We herein acknowledge that Rock Solid Foundation Systems has been retained by my/our signature(s) below to perform the services herein described according to the terms and conditions thereof. Rock Solid Foundation Systems has no additional obligations other than those found in writing in this contract. I/We hereby authorize Rock Solid Foundation Systems to furnish all material and labor required to complete the aforementioned work in the above agreement for which I/we agree to pay the amount stated in said proposal according to the terms thereof. Owner/ Responsible Party Rock Solid Foundation Systems ` Owner/ Responsible Party,. Date i 2899 N. Twin City Highway, Nederland, Texas 77627 Beaumont' Mid County Toll Free Fax (409) 832-8833 (409) 722-3200 (877) 811-9759 (409) 729-5932 THREE STAR SIDING & ROOFING Three Generations of Experience 1798 Calder @ 2nd Street t } Beaumont, Texas 77701 Office 409/833-3353� fax 409/ - 0? Z -t'� � � 1-800-546-8878 November 7,2001 Colleen Christie 2685 Harrison Beaumont, TX 77702 832-3012 Architect: Jason McKnight Engineer: Aran Engineering Sales Rep: Dan Weiman CONTRACT NEW ARCHITECHURAL ROOF: • Remove woodshakes on roof and side domers on the house. • Deck with 1/2 inch plywood. • install new 30 lb felt underlayment throughout roof area. • Replace bad wood on facia boards. • Install Premium 25 year Architectural Roof, in customer's choice of color. • Install new lead jacks and flashing. • Install new drip edge. • Magnetize yard upon completion. • One million dollar insurance policy to protect the homeowner. • All applications up to code with city and windstorm regulations. • State windstorm certificate issued upon completion where applicable. **CLEAN UP AND HAUL OFF ALL SCRAP MATERIALS. **BONDED AND INSURED. **THREE STAR QUALITY INSPECTION THROUGHOUT. **TURN -KEY JOB. **PERMIT ISSUED ON JOB SITE. Total Job Price..................................................$12,954.00 Throe•Star Stdingand Roofing ' .HOMEOWNER ' ; . Jasotr McKnight; dwnerloperator guarantee of satisfaction — three generations strong "QUALITY ISN'T EXPENSIVE.....IT'S PRICELESS" i