HomeMy WebLinkAboutRES 20-180RESOLUTION NO. 20-180 WHEREAS, on June 4, 2019, the City Council of the City of Beaumont, Texas, passed Resolution No. 19-112 awarding a contract in the amount of $1,589,808.00 to T Construction, LLC, of Houston, Texas, for the Helbig Road Pipe Bursting Contract Project; and, WHEREAS, a contingency allowance in the amount of $100,000.00 was included in the above noted contract; and, WHEREAS, on October 1, 2019, the City Manager executed Work Directive No. 1, in the amount of $68,210.00, to furnish labor and equipment to install approximately 1,660 linear feet of 32" SDR 18.5 high -density polyethylene pipe via horizontal directional drilling, thereby decreasing the contingency allowance to $31,790.00 and having no affect on the total contract amount of $1,589,808.00; and, WHEREAS, on April 20, 2020, the City Manager executed Work Directive No. 2, in the amount of $2,800.00, to furnish labor, material and equipment to make a connection of a new 12" sanitary sewer force main line into existing manhole 127 and properly sealing the annular space inside and outside of the manhole, thereby decreasing the contingency allowance to $28,990.00 and having no affect on the total contract amount of $1,589,808.00; and, WHEREAS, Change Order No. 1, in the amount of $39,720.00, is required to make changes to the original contract bid items due to site conditions discovered once construction began by increasing the quantity of flexible pavement structure repairs at 2" thickness rather than 4" thickness and to install two (2) additional manholes for better maintenance of the City sewer system, thereby decreasing the contingency allowance of $28,990.00 to $0.00 and increasing the total contract amount by the amount of $10,730.00 for a new total contract amount of $1,600,538.00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 1 for additional work described above, thereby decreasing the contingency allowance of $28,990.00 to $0.00 and increasing the total contract amount by the amount of $10,730.00 for a new total contract amount of $1,600,538.00 for the Helbig Road Pipe Bursting Contract Project; and, The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 8th day of September, 2020.