Loading...
HomeMy WebLinkAboutPreliminary Plat - Sienna Trails Addition DATE: November 20, 2006 TO: Planning Commission FROM: Stephen C. Richardson, Planning Manager SUBJECT: Consider a request for preliminary plat approval of Sienna Trails Addition FILE: Preliminary Plat - Sienna Trails Addition STAFF REPORT The Planning Manager recommends approval subject to the following conditions:  Provide proof of payment for ten street lights. (Transportation)  Tie Sienna Trails with the existing pavement in Concord with 30' radii and 12" of cement stabilized base and 2" of asphalt. (Engineering)  Label the storm sewers in Block 3 as private. (Engineering)  Dedicate a 25' wide drainage easement for the 42" storm sewer on the east side of the property that empties into the existing ditch operated and maintained by DD#6. (Engineering)  Re-align the sanitary sewer on Timber Creek Loop. It cannot cross private property. (Water Utilities)  Re-align the storm sewer or the water line on Timber Creek Loop. The storm sewer cannot be on top of water line. (Water Utilities)  Show where the sanitary sewer main on Sienna Trails ends for this Section. (Water Utilities)  Show where the water main on Sienna Trails ends for this Section. (Water Utilities)  Show where the water main on Sienna Trails ties in on Concord Road. (Water Utilities)  Delete the 10' water line easements in Block 3. These easements will be reviewed when the construction plans for the apartment complex are submitted through Building Codes. (Water Utilities) Fittz & Shipman, Inc. has applied for preliminary plat approval of Sienna Trails Addition, a 24.24 acre residential subdivision. The property is located on the north side of Concord Road near Judy Lane. The proposed subdivision and the 38 acres to the north will be developed with detached single family residential, medium density townhouses and medium density apartments. The subdivision will be accessed off of Concord by Sienna Trails, a collector street. Concord is to be widened from E. Lucas to Highway 105. As part of the widening, this portion of Concord will also be re-aligned to eliminate the curve in the road. Possible re-alignments are currently under study. Engineering conditioned approval of this plat subject to tying Sienna STAFF REPORT continued Trails with the existing roadway. Engineering states that this portion of Concord Road will not be reconstructed until 2011. This preliminary plat was sent to all interested parties. Exhibits are attached. GENERAL INFORMATION/PUBLIC UTILITIES APPLICANT: Fittz & Shipman, Inc. PROPERTY OWNER: M Group LOCATION: North side of Concord near Judy Lane EXISTING ZONING: RS (Residential Single Family Dwelling) District PROPERTY SIZE: 24.24 acres, more or less EXISTING LAND USES: Vacant FLOOD HAZARD ZONE: A X @ - Areas determined to be outside 500-year floodplain SURROUNDING LAND USES: SURROUNDING ZONING: NORTH: Vacant RS (Residential Single Family Dwelling) District EAST: Residential RS SOUTH: Vacant GC-MD (General Commercial-Multiple Family Dwelling) District WEST: Vacant RS COMPREHENSIVE PLAN: Stable Area OTHER PHYSICAL FEATURES: None STREETS: Sienna Trails - Collector street with a 60' wide right-of-way and a 38' pavement width; Timber Creek Loop - Local street with a 50' wide right-of-way and a 28' pavement width DRAINAGE: Curb and gutter WATER: Proposed 6" water line SANITARY SEWER SERVICE: Proposed 8" sanitary sewer line