HomeMy WebLinkAboutRES 20-073RESOLUTION NO. 20-073 WHEREAS, on April 25, 2017, the City Council of the City of Beaumont, Texas, passed Resolution No. 17-083 awarding a contract in the amount of $15,984,397.88 to. Allco, L.L.C., of Beaumont, Texas, for the Washington Boulevard Pavement Widening Phase II (Corporate Drive to Amarillo Street) Project; and, WHEREAS, on August 3, 2017, the City Manager executed Change Order No. 1, in the amount of $9,920.00, to adjust the estimated quantities to reflect the actual quantities used in the completion of the project, thereby increasing the contract amount to $15,994,317.88; and, WHEREAS, on February 6, 2018, the City Council of the City of Beaumont, Texas, passed Resolution No. 18-032 authorizing the City Manager to execute Change Order No. 2, in the amount of $103,893.00, to accommodate design changes necessary to address unforeseen conflicts with the underground utilities and additional curb and driveway improvements required on Executive Boulevard and Corporate Drive, thereby increasing the contract amount to $16,098,210.88; and, WHEREAS, on May 14, 2018, the City Manager executed Change Order No. 3, in the amount of $7,714.55, to adjust the estimated quantities to reflect the actual quantities used in the completion of the project, thereby increasing the contract amount to $16,105,925.43; and, WHEREAS, on June 5, 2018, the City Council of the City of Beaumont, Texas, passed Resolution No. 18-123 authorizing the City Manager to execute Change Order No. 4, in the amount of $16,032.91, to adjust the pipe quantity and size which was not allotted for in the original design and the addition of fourteen (14) calendar days, thereby increasing the contract amount to $16,121,958.34; and, WHEREAS, on July 17, 2018 the City Council of the City of Beaumont, Texas, passed Resolution No. 18-157 authorizing the City Manager to execute Change Order No. 5, in the amount of $33,303.00, to adjust bid items and quantities in the contract to accommodate revisions to the storm sewer system; relocate a 16" waterline; and, twenty-two (22) calendar days will be added to the contract for the work, thereby increasing the contract amount to $16,155,261.34; and, WHEREAS, on October 16, 2018 the City Council of the City of Beaumont, Texas, passed Resolution No. 18-255 authorizing the City Manager to execute Change Order No. 6, in the amount of $215,144.90, to adjust the bid items and quantities in the contract to accommodate for additional sewer work; ground boxes for fiber optics and traffic signals; and, sixty (60) calendar days will be added to the contract for the work, thereby increasing the contract amount to $16,370,406.24; and, WHEREAS, on April 9, 2019 the City Council of the City of Beaumont, Texas, passed Resolution No. 19-084, in the amount of $128,658.75, to adjust the bid items and quantities in the contract for additional waterline, surface inlets for storm sewer, and foundations for traffic ground cabinets; traffic signal poles that meet the height requirements needed to fit in the field; and, ten (10) calendar days will be added to the contract for the work, thereby increasing the contract amount to $16,499,064.99; WHEREAS, on September 3, 2019 the City Manager executed Change Order No. 8, in the amount of $6,400.00, to adjust the estimated quantities to reflect the actual quantities used in the completion of the project relating to .exploratory digging of a 20" water line, thereby increasing the contract amount to $16,505,464.99; and, WHEREAS, Change Order No. 9, in the amount of $28,474.00, is necessary for the addition of a conflict junction box to account for flow line design issues with one sewer, one water and two storm lines; and, ten (10) calendar days will be added to the contract for the work, thereby increasing the contract amount to $16,533,938.99; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 9 for additional work described above, thereby increasing the contract amount by $28,474.00 for a total contract amount of $16,533,938.99 for the Washington Boulevard Pavement Widening Phase II (Corporate Drive to Amarillo Street) Project., with sixty calendar days added to the contract for the work. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 7th day of April, 2020. RESOLUTION NO. 19-084 WHEREAS, on April 25, 2017, the City Council of the City of Beaumont, Texas, passed Resolution No. 17-083 awarding a contract in the amount of $15,984,397.88 to Allco, L.L.C., of Beaumont, Texas, for the Washington Boulevard Pavement Widening Phase 11 (Corporate Drive to Amarillo Street) Project; and, WHEREAS, on August 3, 2017, the City Manager executed Change Order No. 1, in the amount of $9,920.00, to. adjust the estimated quantities to reflect the actual quantities used in the completion of the project, thereby increasing the contract amount to $15,994,317.88; and, WHEREAS, on February 6, 2018, the City Council of the City of Beaumont, Texas, passed Resolution No. 18-032 authorizing the City Manager to execute Change Order No. 2, in the amount of $103,893.00, to accommodate design changes necessary to address unforeseen conflicts with the underground utilities and additional curb and driveway improvements required on Executive Boulevard and Corporate Drive, thereby increasing the contract amount to $16,098,210.88; and, WHEREAS, on May 14, 2018, the City Manager executed Change Order No. 3, in the amount of $7,714.55, to adjust the estimated quantities to reflect the actual .quantities used in the completion of the project, thereby increasing the contract amount to $16,105,925.43; and, WHEREAS, on June 5, 2018, the City Council of the City of Beaumont, Texas, passed Resolution No. 18-123 authorizing the City Manager to execute Change Order No. 4, in the amount of $16,032.91 to adjust the pipe quantity and size which was not EXHIBIT 1 allotted for in the original design and the addition of fourteen (14) calendar days, thereby increasing the contract amount to $16,121,958.34; and, WHEREAS, on July 17, 2018 the City Council of the City of Beaumont, Texas, passed Resolution No. 18-157 authorizing the City Manager to execute Change Order No. 5, in the amount of $33,303.00, to adjust bid items and quantities in the contract to accommodate revisions to the storm sewer system; relocate a 16" waterline; and, twenty-two (22) calendar days will be added to the contract for the work, thereby increasing the contract amount to $16,155,261.34; and, WHEREAS, on October 16, 2018 the City Council of the City of Beaumont, Texas, passed Resolution No. 18-255 authorizing the City Manager to execute Change Order No. 6, in the amount of $215,144.90, to adjust the bid items and quantities in the contract to accommodate for additional sewer work; ground boxes for fiber optics and traffic signals; and, sixty (60) calendar days will be added to the contract for the work, thereby increasing the contract amount to $16,370,406.24; and, WHEREAS, Change Order No. 7, in the amount of $128,658.75, is necessary to adjust the bid items and quantities in the contract for additional waterline, surface inlets for storm sewer, and foundations for traffic ground cabinets; traffic signal poles that meet the height requirements needed to fit in the field; and, ten (10) calendar days will be added to the contract for the work, thereby increasing the contract amount to $16,499,064.99; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 7 for additional work described above, thereby increasing the contract amount by $128,658.75 for a total contract amount of $16,499,064.99 for the Washington Boulevard Pavement Widening Phase 11 (Corporate Drive to Amarillo Street) Project., with sixty calendar days added to the contract for the work. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 9th day of April, 2019. z; CITY OF BEAUMONT DATE: February 26, 2020 ORIGINAL CONTRACT TIME (DAYS): 1192 PROJECT: Washington Blvd -Phase 11 OWNER: CITY OFBEAUMONT ADDITIONAL TIME REQUESTED: 10 CONTRACTOR: ALLCO CHANGE ORDER NO.: 9 INEW CONTRACT TIME: 1202 'THE'-FOLL0L4 G OHANGES IN THE PLANS -AND/OR SPECIFICATIONS ARE HEREBY MADE:- ' Adjust the esthnated quantities to reflect the actual quantities used in die completion of the project A total of two (2) sheets ]cave been added to the plan set They are sheet 183 and sheet 194. Item No. Item Code Description Unit Original Quantity New Quanti Unit Price Total 465 010 DEEJUNCTION BOX (CONFLICT BOX) (5' WIDE) (8' LONG) (10'6- P] EA 0 2 S 14,237.00 S 28,474.00 TOTAL: S 28,474.00 10-CALENDER'DAYS ARE ADDED TO THE CONTRACT TIME BY THIS CHANGE ORDER ORIGINAL CONTRACT AMOUNT: $ 15,984,397.88 NET FROM PREVIOUS CHANGE ORDERS: $ 16,505,464.99 TOTAL AMOUNT OF THIS CHANGE ORDER:. $ 28,474.00 PERCENT OF THIS CHANGE ORDER: 0.17% TOTAL PERCENT CHANGE ORDER TO DATE: 3.44% NEW CONTRACT AMOUNT: $ 16,533,938.99 Znz L 3 z�, ALLCO CONIVACTING, INC., DATE REPRESENTATIVE REVIEWED BY: AMALIA VILLARREAL DATE INTERIM CITY ENGINEER APPROVED BY: KYLE HAYES, CITY MANAGER DATE PREPARED BY: �IZZ� 3-23-2d DAVID TINGLE DATE PROJECT MANAGER REV W B BA T BARTK IAK DATE DIRECTOR OF PUBLIC WORKS AND TECHNOLOGY SERVICES ATTESTED BY: TINA BROUSSARD, CITY CLERK DATE S FT rATERLINE i 20' WATERLINE U FT PAVESINNT a MANHOLE I i PAVEMENT � I OF'FSFT HFi•RING AND,J�` � I • I COVER AS SHOWN I' I I 1. THIS DETAIL IS FOR CLARIFYING THE I — — — LAYOUT OF THE CONFLICT XMLTION ROX ONLY. W 2. TRW CUNFUCT JUNCTION BOX AS SHOWN WILL FOLLOW THE DnMMONS, REINFORCET M BEDDING AND BACRFILL DETAUB CALLED OUT FOR A TYPE A JUNCTION BOX WM MANHOLE ACCESS IN THE PLAN SET. •) 20' 3 FT GIFFORD-HILL WATERLINE �I �1 8 FT 18" I HDPE PIPE � uAtmaTa I HDPE PIPE PAVEMENT Nom, 1. THIS DETAM IS FOR C[ARIVMG THE LAYOUT OF THE CONMCT JUNCTION BOX ONLY. 2. THIS CONFUCT JUNCTION BOX AS SHOWN WILL FOUOW THE DD@NSIONS, REINFORCEMENT, BEDDING AND BACRFH,L DETAUS CAVED OUT FOR A TYPE A 7UNUnON BOX WITH NANHOIX ACCESS IN THE PLAN SET. 8 FT OFFSET MH RING AND��— •I ICOVER AS SHORN I. I• .I I LOP 8 FT ELOPE PIPE -I ENCASE HDPE PIPE STARTING 1 FT OUTSIDE OF M AND E RUNNING THROUGH PAVEMENT DATE: August30,2019 PROJECT: Washington Blvd -Phase II OWNER-. CITY OF BEAUMONT CONTRACTOR: ALLCO CHANGE ORDER NO.: 8 CITY OF BEAUMONT ORIGINAL CONTRACT TIME (DAYS): 1192 ADDITIONAL TllVIE REQUESTED: 90 NEW CONTRAC ' TIME: 1282 THE FOLLOWING OHANGES IN THE'PL'AN1§''A1VD/OR SPECIFIOATIONS'ARE'HEREBY MADE;• • . Adjust We estimated quantities to reflect die actual quantifies used in the completion ofthe project Item No. I Item Code I Description 9999 008 18MORATORY OtcrMr-vnawea -I Unit Original Quantity New Quantit} Unit Price Total EA 0 8 S 800.00 S 6,4 TOTAL: S 6.40 90=CALENDER DAYS --ARE, ADDED• To;THE..CONTRACT;TIIVIE BY;TM$,.,CHAN,GE ORDER. ORIGINAL CONTRACT AMOUNT: $ 15,984,397.88 NET FROM PREVIOUS CHANGE ORDERS: $ 16,499,064.99 TOTAL AMOUNT OF THIS CHANGE ORDER: $ 6,400.00 PERCENT OF THIS CHANGE ORDER: 0.04% TOTAL PERCENT CHANGE ORDER TO DATE: 3.26 NEW CONTRACT AMOUNT: $ 16,505,464.99 ACC' D BY: 4RIE17RED BY: ALLCO CONT CTING, INC, DATE 2 TIN 7 r DATE REPRESENTATIVE PROJECT MANAGER REVI W D B REVIEWED BY: E. CROCHET ATE R: J EPH MAJ,DA e ANT, P.E. DATE ROADWAY DESIGN I P IC WORICS D ECTOR APPROVED BY: L I L =C1, BY: KYLE HAYES, CITY MANAGER DATE TINA BROUSSARD, CITY CLERIC DATE CITY OF BEAUMONT DATE: April 2, 2019 ORIGINAL CONTRACT TIME (DAYS): 1I82 PROJECT: Washington Blvd -Phase IT OWNER: CITY OF BEAUMONT ADDITIONAL TIME REQUESTED: 1.0 CONTRACTOR: ALLCO CHANGE ORDER NO.: 7 NEW CONTRACT TIME: 1192 dc3�dlt€p r�Jt�° 7� v3TPEBf91 a �i?oll.E Adjust the cstunated quanddes to reflect the actual quantities used in the completion of the project Item No. Item Code Description Unit Original Quantity New Quanti Unit Price Total 104 001 REMOVINGCONCRETE (PAV)(4"-12") SY 56,084 56,131 Is 12.50 S 587.50 360 OD2 CONCPAV (10") (CLP) SY 51,300 51,363 IS 64.00 S 4,032.00 465 007 SURFACE INLET (COMPL) (GRATE HEAVY DUTY) EA 2 5 S 3,040.00 S 91120.00 465 009 JUNCTION BOX (COMPL) (5'-0"(TY B) EA 4 5 S 5,975.00 S 5,975.00 686 001 TRAF SIG POLE ASSEM 1 ARM (STEEL) (281 FA 2 3 S 8,296.75 S 9.296.75 686 002 TRAF SIG POLE ASSEM I ARM (STEEL) (32� EA 2 4 S 9,628.75 S 19,257.50 686 003 TRAF SIG POLEASSEM I ARM (STEEL) (50) EA 4 5 S 17,000.00 S 17,000.00 686 004 TRAF SIG POLE ASSEM I ARM (STEEL)(40D EA 1 2 S 16,000.00 S 16,000.00 686 005 TRAF SIG POLE ASSEM I ARM (STEEL) (44) EA 3 4 IS 15,400.00 S 15,400.00 690 001 INSTALL -OF END FOR GROUND MNTCABINETS EA 0 3 S 3,048.00 S 9,144.OD 8DI 006 FURNISH & INSTALL 8" MI ADAPTER, COMPLETE IN PLACE EA 8 10 S 225.00 S 450.00 80I 012 FURNISH & INSTALL 8" MJ WITH 45 DEGREE BEND, COMPI EA 40 42 S 225.00 S 450.00 801 013 FURNISH & INSTALL B" MJ WITH 22.5 DEGREE BEND, COM EA 2 4 S 225.00 S 450.00 810 004 FURNISH & INSTALL 8" VC CLASS 150-G900 PVCWATERI LF 8,362 8,562 S 89.83 S 17,966.00 2534 003 IREPLACEMENT OF 6" SHORT SIDE SERVICE CONNECTION EA 0 2 S 1,056.00 S 2,112.0.0 2534 004 IREPLACEMENT OF 6" LONG SIDE SERVICE CONNECTION EA 0 1 S 2,418.00 S 2,418.00 TOTAL: S 128,658.75 onLIvR<as • zl�n 11raiiA T ars�?crFi , HE ''y��r•G�yIr.;..no Fi U; T: mewiti,r�AWllll ^17Ws 3J9�t911.�tJr �a�iiWtl'un:¢y[ti��'� �,�� yri ��� ��;, V '7{y� �4i ,q��y �I �,+t�;.1,pI�Ij , �', i��13k -!3s"' .; ."- loim JS�y 5u1. 'ZGWS l ,BW: lam 1113V!!9�' �` i��$u: ,V�Ly a d 1�Pij g '! i i. v"41tlLt �Ilr• dWi; fl'G: I.yli: 7�v�g. ••ol . `-.LIT ORIGINAL CONTRACT AMOUNT: NET FROM PREVIOUS CHANGE ORDERS: TOTAL AMOUNT OF THIS CHANGE ORDER: PERCENT OF THIS CHANGE ORDER: TOTAL PERCENT CHANGE ORDER TO DATE: NEW CONTRACT AMOUNT: S 15,984,397.88 S 16,370,40624 $ 128,658.75 0.79% 3.22% $ 16,499,064.99 ACCE BY: PREPA ED BY: qL3 by ALLC CONTRACT G, INC. , DATE Ptft TINGLEt DATE REPRESENTATIVE PROJECT MANAG REVIEWED REVIEWED BY: y3/9 1 4 t' v(J /, HAROLD E. CROCHET DATE JOS MAJD ANI, X. D*E ROADWAY DESI -III PUBLI WORKSD R APPROVED BY: A TED BY: CITY OF DATE: October 9, 2018 I ORIGINAL CONTRACT TIME (DAYS): 1122 PROJECT: Washington Blvd-Phasell 1 OWNER: CITY OFBEAUMONT jAbDMqNAL TOM, REQUESTED: 60 CONTRACTOR ALLCO CHANGE ORDER NO- 6 INEW CONTRACT TIME: 1152 "It�i #:; .a AtUast the rstmated quatnitics to mOca the actual gaanthics used in the completlan of to project Item Ne. Item Code Description Unit O ",;inal Quantity, en, Quantity Utdt Price Total 340 002 DENSE GRADED HOT MCC ASPHALT P6 64-n (TYPE D) (2-) SY 2358 0 S 30.00 S (70,740.00) 400 002 CEM STABIL BKFL(IS SK/CY SAND) CY 17,102 17.039 S 58.00 S (3,654.00) 400 003 CEM STABIL➢KFL (2-0 SKlCY SAND) CY 0 --II S 66.00 S 706.20 416 001 FOUNDATION FOR TRAFFIC SIGNAL(36 INCH DRILL SHAF LF 110 112 S 230.00 S 460.00 464 002 RCP 18, LF 527 COS S 31.00 S 2.418.00 464 003 RCP 24" LF 3.549 3,509 S 3S.00 S (1,400.00) 464 005 RCP 36" LF 1,331 1,753 S 140.00 S (10,92D.00) 40 009 JUNCTION BOX (COMPL) (5'-0'(7Y B) EA 1 2 S 5,975.00 S 5,975.00 502 001 BARRICADES, SIGNS, AND TRAFFIC HANDLINGS MO 37 39 S 7,100.00 S 14,200.00 506 003 TEMP SEDUAENI' CONTROL PENCE (INSTALL) LF 17,000 5,000 S 2.50 S (30.000.00) $42 001 REMOVE M(tv=AL BEAM GUARD FENCE) LF 180 250 S 7.30 S 511.00 618 001 2" PVC SCHD 40 CONDUCT (FIBER OPTICS) LF 7.973 8,412 S 16.00 S 7.024.00 619 002 6" STEEL CASING (BORED) (FIBER OPTICS) LF 135 I58 S 65.00 S 1,495.00 618 004 4" PVC SCHD 40 CONDUCT (INCL CEM STAB SAND BKFL) (FIBER OPTI LF ISO 0 S 42.00 S (6300.n0 ) 6A 002 GROUND BOX (TYPE A) (FIBER OPTICS) nA IS SO S 1,050.00 S 36,750.00 656 001 FDNS FORTRAFFIC SIGNAL DEVICES (24 INCH DRILL SEW LF 6 I8 1 $ 1,050.00 S 12,60040 687 001 PEDESTALPOLEASSEMBLY EA 1 0 S 6300.00 S (6,300.00) 688 001 PE•DDETECT(PUSHBTM EA 24 0 S 910.00 S (21,840.00) 708 001 MANHOLES - REMOVE & REPLACE EXITING SANITARY SE EA 11 33 S 2,61OAD S 5,220.00 810 002 FURNISH & INSTALL 2" VC CLASS 150-G900 PVC WATERIJ IF 1� i 20 g00 S 15.00 S 11,700.00 4020 008 10" HOPE SDR-17 PIPE BURST SANITARY SEWER MAINS COMPLETE IN PLACE, INCLUDING ALL KCAVAT70N, LF 1•734 136 S 5237 S (81.068.76) 4020 010 FURNISH&INSTALL 10" SANITARY SEWER LINES, UTILIZING IO-INCHPVC SDR26 OR OPEN TRENCH) OR LF p 52 S 15L74 S 7,942.48 4020 Oil FURNISH & INSTALL 15" SANITARY SEWER LINES, UTILIZING 15-INCHPVC SDR 26(FOROPEN 1TU.7JCH) OR 15-INCHSOLIDWALLPOLYEIHYLENEPIPE(HDPE),PE 3408, ASTMF714(FORPIPE• BURSTJNG/CRUSHING) MPLIt- IN PT -ACE. LF 0 1926 S 15734 S 303.036.84 6035- 001 LED LIGHTED STREET SIGNS EA 12 0 S 2,310.OD S (33,720.pO) 9999 003 INLET DECK COVERS, INCLUDING EXCAVATION AROUND EA 0 3 S 1,000.00 S 3,000.00 9999 004 JOINT REPAIR (PIPE) 8"-48"RCP EA 0 12 $ 600.00 S 7.200.00 9999 OD5 PIPE BORE, INCLUDES 24" BARE STEEL CASING, CASING S LS 0 1 S 57.140.00 S SR140.00 9999 006 1OMANDIOX6FITTINGS(PONo.006998) IS 1 0 1 S 1.559.14 S 1,559;14 9999 007 LOWERING MANHOLE RING (48"FIBERGLASS) LS I 0 1 S 2.150.00 S 2,150.00 I TOTAL•. S 215,144.90 -{��er 6U, CALL' SAD, yFRtDA0""'kE§I�T'r', 0,�R�"{'^ f"1�".� i'S7t!NC Cvl3 GLgORyDER —yn •y 3..'u -..p- L•.l„ ..,A �c;(, x a3J .:s(� .tag :J.�F ORIGINAL CONTRACT AMOUNT: S 15,994,397.89 c NET FROM PREVIOUS CHANGE ORDERS: $ 6,155,26134 TOTAL AMOUNT OF THIS CHANGE ORDER: $ 1 215,144.90 PERCENT OF THIS CHANGE ORDER 11.33% TOTAL PERCENT CHANGE ORDERTO DATE: Ale/ NEW CONTRACT AMOUNT: $ 16.370.40624 PTED B f P D :,_ / r ALLCO CONTRACT _ 1)VG, INC., DATE TINGLE DATE REPRESENTATIVE IR OADWAY DESIG ER -I REVIEW m BY; REVIEWED BY: Ur �a LD CROCHET D E JOS H P.E. DATE ROADWAY DESIGNER- ?—PBL /j CITY OF BEAUMONT DATE: July 5, 2078 PROJECT: Washing -ton Blvd -Phase H OWNER: CITY OF BEAUMONT CONTRACTOR- ALLCO CHANGE ORDER NO.: n :F�LL�rQ�NG� Gam, Ip�Y ,r� EL�A`�13'�r0 Adjust the estimated quantities to reflect the actual quantities used in the completion'of the project ORIGINAL CONTRACT TIME (DAYS): 1100 ADDITIONAL TIME REQUESTED: 22 NEW cONTRACTTIME: 1122 Item No. item Code Description Unit Original Now Quantity Unit Price Total 400 002 CEM STABILBKFL (1.5 SKICY SAND) CY 16,991 17,102 S 58.00 S 6.438.00 464 004 RCP 30" LF 820 713 S 131.00 $ (14,017.00) 464. 005 RCP 36" LF 1 1,799 1.831 S 140.00 S 4,480.00 464 006 RCP 42" LF 1,144 1499 S 148.00 S. (6,660.00) 464 007 RCP 48" (DD6 Stub Out on Sth Street) LF 1,540 1,642 S 162.00 S 16,524.00 464 00$ RCP 54" LF 1,372 IMS S 190.00 S (15,960.00) 464 009 RCP 60" (DI)6 Stub Out on Sth Sheet) LF 297 309 S 210.00 S 2i520.0 46S 001 MANHOLES (COMPLETE) (TV A) FA 39 41 S 7,810.00 S 15620.00 465 003 CURB INLET TY A (COMPL) (S'-0") EA 26 24 S 3,975.00 S (7,950.00) 496 001 REMOVE STR(PIPE) 8"-48" LF 11,110 11,025 S 7.00 $ (595.00) 496 003 REMOVE STR(CURB INLET) LF 64 63 S 360.00 S (7-70.00) 502 001 BARRICADFS, SIGNS, AND'TRAFFIC HANDLINGS RAN FRDFR N .D2 MO 36 37 S 7,100.00 $ 7,100.00 719 001 FURNISIT AND INSTALL AIR RELASE VALVE AND PIPE CONNECTION TO EXISTING MAW & METER BOX, WTTH ALL FITI'WGS, VALVE EXCAVATION BACKFILL, TESTING AND STERILIZATION, SURFACE RESTORATION ALL IN STRICT ACCORDANCE WITH PLANS AND SPECIFICATIONS COMPLETE W PLACE, EA 0 1 S 2,919.00 S 2,918.00 0999 002 16" WATERLINE RELOCATION LS 1 0 1 S23,605.00 .S 1i,605.00 TOTAL: $ 3303.00 CATrEND"EI�DAY5AitEAADET� TO TEICOftT�2A�Tr�a7 "�s'irD�) �p h w i. ItF ks i s 1' -t i a { c am$ GE Os J �d d' r 45 ix 1 I j �I Via: a i w 9r aI sit 3 i s u 5 r -A d., w,: _.' F.� w i :. L: i N�,F(f .. .'�-_.e. r�sl ,`., � d.:,� �tzl..vn �L (i {�,p r, ...u:..1� i=k ORIGINAL CONTRACT AMOUNT: S 15,984,397.88 NET FROM PREVIOUS CHANGE ORDERS: S 16,121,958.34. TOTAL AMOUNT OF THIS CHANGE ORDER: $ 33,303.00 PERCENT OF THIS CHANGE ORDER: 0.21o/, TOTAL PERCENT CHANGE ORDER TO DATE: 1.07%. NEW CONTRACT AMOUNT; $ 16,155,261.34 ACCEPTED BY: PREPARED BY: ALLCO CONTRACTING, Ek., DAVID TINGLE REPRESENTATIVE ROADWAY DESIGNER -I REVIE D B REVIEWED BY.- -,0ftAkOL-D I . CROCHE D JOSI+ H MAJD P.E. ROADWAY DESIG UBLXe WORKS R n CITY OF BEAUMONT DATE: May 2S, 2018 JORIGIN CONTRACT TIME (DAYS): ION PROJECT: Washington Blvd-Phase11 OWNER: CITY OF BEAUMONT JADDITIONAL TIME REQUESTED: 14 CONTRACTOR: ALLCO. CHANGE ORDER NO.: 4 INEW CONTRACT TIME: 1100 .1� '� m5 B ITO LO fi C r + i'!P-D%oR%�sl?E'�Dait a eiA R a�Fi E t.` 1;1'M lu''1• PrN`" �P� "y IoM9i dQV"t �j-Ih� "Yl "Ili' l5 I p, b9 o' ,v:4 •• ��'it '.,. iY^ .`j17..R.r..TOL. r ` I �7r.+ `•is I°'" 9e`! rj"�". �t,+, I,'Fi Iwo lF 4�+m ���T �1: Adjust the estimafcd yunnlitles to mnect the actual quantities used in the coa:plctipn oldie pmjcet Item No. Item Code Description Unit O*Iginol Qusntlty Nesv Quantity Unit Price Total 12" HOPE SDR- 17 PIPE BURST SANITARY SEWER MAINS (12.75° OD.), COMPLETE IN PLACE, INCLUDING ALL 4020 002 EXCAVATION, DACKPILLBEDDING,COMPACTION, TESTING, SURFACEIZE$TORATION, AND BYPASS LF 407 O $ 5332 $ (21,701.24) PUMPING ALL IN STRICT ACCORDANCE WITH PLANS AND SPECIFICATIONS.. 18° HOPE SDR-17 PIPE BURST SANITARY SEWER MAINS (18.00- O.D.), COMPLETE IN PLACE, INCLUDING ALL 4020 003 ixCAVATION,BACRILLBEDDING. COMPACTION, TESTING. SURF ACE RESTORATION, AND BYPASS LF 1,163 400 S 6632 S (50,607-16) PUMPING ALI:1N STRICT ACCORDANCEWiTA PLANS AND SPECIFICATIONS. 20- HDPB SDR- 17 PIPEBURST SANITARY SEWER MAINS - (20.0V O.D.), COMPLETE IN PLACE, INCLUDING ALL 4020 004 E•XCAVATION;BACICFILLBEDDING,COMPACTION, TESTING, SURFACE RESTORATION, AND BYPASS LF 406 0 S 7432 S (30,173.92) PUMPING ALL IN STRICT ACCORDANCE WITH PLANS , AND SPECIFICATIONS. ' UTILIZING 6-INCH PVC SDR-26(FOR OPEN TRENCH) OR 6- 4020 006 INCH SOLID WALLPOLYMIMENE PIPE (HDPE); PE 3408, ASTM F714 (FDA PIPE BURSTINGICRUSHING) COMPLETE LF 430 0 S 85.07 S (40,833.60) 811 HDPE SDR-17 PIPE BURST SANITARY SEWER MAINS COMPLETE IN PLACE, INCLUDING ALL EXCAVATION, 4020 007 BACKFILL BEDDING, COMPACTION,TESTING, LF 0 619 S 42.75 S 26,462.25 SURFACE RESTORATION, AND BYPASS PUMPING ALL IN STRICT ACCORDANCE WrTn PLANS AND' 10" HDPE SDR-47 PIPE BURST SANITARY SEWER MAINS COMPLETE IN PLACE, INCLUDING ALL 4020 008 EXCAVATION, BACKFILLBEDDING, COMPACTION, LF 0 1,134 5 5237 S 90,80988 TESTING, SURFACE RESTORATION, AND BYPASS PUMPING ALL IN STRICT ACCORDANCE WITH PLANS FUNISH & INSTALL 811 SANITARY SEVER LINES, UTILEUNG 8-INCH PVC SDR-26(FOR OPEN TRENCH) OR 4020 009 S-INCH SOLI) WALL POLYETHYLENE PIPE (HDPE), -PE LF 0 480 5 87.65 S 42,072.00 3408,,ASTM F714 (FOR PIPE BURSTING/CRUSHING) COMPLETE IN PLACE. TOTAL: S 16,03291 -R is D�' `s•_ pL4 •� 4 EN17ER-iDA�Y— DED OiTHE CO i rl a1v t �uI IgtI�� i r w a T� �T 4aGE oI �°I �I p f a°ar I�{�t 9b ,C. h F9 q JJ >rJ i T � P i I<• I . '4 f if F' p' i �G t• Ter k . :�E-�..,: �, k ..I ORIGINAL CONTRACCAMOUNT: $ .1.5,984,397.88 NET FROM PREVIOUS CHANGE ORDERS: S 16,105,935.43 TOTAL AMOUNT OF THIS CHANGE ORDER: $ I6,032.91 PERCENT Or THIS CHANGE ORDER: 0.1601. TOTAL PERCENT CHANGE ORDER TO DATE: 0.86% NEW CONTRACT AMOUNT: S 16,121,958.34 ACCEPTED` P PARED B ---• a + �r�sQ ALLCO CONTRACTING, INC.-, AVID TINE REPRESENTATIVE ROADWAY DESIGNER I DESIGNER-11 REVIEWED BY: s i C f t D .JOSEPH' AJDALANI,P.E. UBLiC RKS DIRECTOR CITY OF BEAUMIONT DATE: May 14, 2018 ORIGINAL CONTRACT TIME (DAYS): 1083 PROJECT: Washington Blvd -Phase H OWNER: CITY OF BEAUMONT , ADDTrIONAL TIME REQUESTED: 3 CONTRACTOR: ALLCO CHANGE ORDER NO.: 3 INEw CONTRACT TIME: 1086 .f r��`JJ,,1�y,.������i � •r �� y'�r�� . ,�% � � f'r ,,�,, SrYt`:_ . ��,, � i �.''+' r Y/ �` Adjust the estimated quantities to reflect the actual quantities used in the completion of the project Item No. It.. Code DescriptionUnit Original Quantity New Quantity Unit Pritt Total 9999 001 Traffic Control (See Crab Tree Quote) LS 0 1 S 7r48.00 S 7,248.00 666 019 REFL PAV MRK TY I (Rj 8°(SLD)(100MIL) LF 0 2t7 $ 1.85 S 401.45 08 008 PAV SURF PREP FOR MRK (81� LF 0 217 S 030 S 65.10 TOTAL: i S _7,714.55 ORIGINAL CONTRACT AMOUNT: $ 15,984,397.88 NET FROM PREVIOUS CHANGE ORDERS: $ 16,098,2I0.88 TOTAL AMOUNT OF THIS CHANGE ORDER: $ 7,714.55 PERCENT OF THIS CHANGE ORDER: 0.05% TOTAL PERCENT CHANGE ORDER TO DATE: 0.76% NEW CONTRACT AMOUNT: $ 16,105,925.43 ACCEPTED pREp g t� II ALLCO ONTRACTING, INC., EWOLD E. CROCHE , REPRESENTATIVE ROADWAY DESI H REVIEWED BY: REVIEWED BY: DAVID TINGLE D JOSE MAJDALANI, P. . ROADWAY DESIGNER -I UBLI ORKS DERECTObf APPROVED BY: A STED BY: KYLE HAYES, CITY MANAGER G T BROUSSARD, CLERK CITY OF BE.A.ITMONT . DATE: February 6, 2018 ORIGINAL CONTRACT TIME (DAYS): 1009 PROJECT: Washington Blvd -Phase 11 OWNER: CITY OF BEAUMONT JADDMONAL TIME REQUESTED: 74 CONTRACTOR: ALLCO CHANGE ORDER NO.: 2 NEW CONTRACT TIME: 1083 n_n?a. J x ?L ,r•,eA n a.v, p.} F� a �� �. 4�.Y>�w. Adjust the estimated quantities to reflect the actual quantities used in the completion oftbe project Item No. Item Code Description Unit Q a� Quantity Unit Price Total 104 002 REMOVING CONCRETE (DRWY) (4" - 6') SY 4,096 4,729 $ 16.00 S 10,128.00 132 001 EMBANKMENT (TYB) (FINAL) (ORD. COMP) CY 2549 2,579 S 31.00 S 930.00 247 003 FLEXBASE (TY A) (GR 2 (12') (DC) (COMP. IN PLACE) BASE COURSE SY 68,428 68,393 $ 25.00 $ (575.00) 360 001 CONC PAV (8-) (CL P) SY 11,949 11,914 $ 63.00 S (2,205.00) 465 003 CURB INLET TY A (COMPL) (Y-n EA 24 26 $ 3,975.00 S 7,950.00 467 6389 SET (TY II) (18 IN) (RCP) (3: 1) (PRECAST) (San Jacinto) SY 0 4 S 2,000.00 S 8,000.00 496 003 REMOV STR (CURB INLET) EA 62 64 $ 360.00 S 720.00 496 004 REMOV (Mfi) (JBOX) EA I4 IS $ 720.00 S 720.00 496 005 • REMOV STR (CURB & GUTTER COMBINED) LF 1,380 1,600 S 8.00 S 1,760.00 502 001 BARRICADES, SIGNS, AND TRAFFIC HANDLINGS MO 33 36 S 7,100.00 S 21,300.00 519 001 CONC CURB (TY II) (MONO) (CL A) (6'7 LF 23,231 23,451 $ 4.30 S 946.00 530 002 DRIVEWAYS (CONC) (6'D SY 4,075 4,708 $ 68.00 S 43,044.00 801 008 FURNISH & INSTALL 8" HYMAX ADAPTER, COMPLETE RA PLACE INCLUDING LABOR, ASSOCIATED MATERLSLS AND FITTINGS, MERGALUG RESTRAINING FLANGES, EXCAVATION, BACIGUL, TESTING, AND TIMUST BLOCKING, ALL IN STRICT ACCORDANCE WITH PLANS AND SPECIFICATIONS. EA 3 12 S 1,275.00 S 11,475.00 TOTAL: $ 103,893A0 ORIGINAL CONTRACT, AMOUNT: $ 15,984,397.88 NET FROM PREVIOUS CHANGE ORDERS: $ 15,994,317.88 TOTAL AMOUNT OF THIS CHANGE ORDER: $ . 103,893.00 PERCENT OF THIS CHANGE ORDER: 0.65% TOTAL PERCENT CHANGE ORDER TO DATE: 0.71 % NEW CONTRACT AMOUNT: $ 16,098,210.88 ACCEPTED BY: PREP , Y. ALL'-0 CONTRACTING, INC., HAS : CRO CHET REPRESENTATIVE ROADWAYDESIG REVIEWED BY: REVIEWED BY: ZHENG TAN, P.R., D OSE MA JDALANI, CITY ENGINEER LIC ORKS DIRECT; APPROVED BY: i ) I ATTESTED BY: /) DATE: August 3, 2017 PROJECT: Washington Blvd -Phase 11 OWNER: CITY OF BEAUMONT CONTRACTOR: ALLCO CHANGE ORDER NO.:1 CITY OF BEAUMONT ORIGINAL CONTRACT TIME (DAYS): 1005 ADDITIONAL TIME REQUESTED: 4 NEW CONTRACT TIME: lOD9 Adjust the estimated quantities to reflect the actual quantities used in the completion of the project Item No. Item Code Description Unit Original Quantity New Quantity Unit Price Total 465 003 CURB INLETTY A (COMPL) (5'-0') Fa, 17 24- S 3.975.00 S 27,825.00 465 008 INLET (CO)aL) (TOP) EA 7 0 S 2,095.00 S (14,665.00) 496 002 REMOV STR (CURB INLET) EA 55 62 S 360.00 S 2,520.00 506 003 TEMP SEDIMENT CONTROL FENCE (INSTALL) EA 1 18920 17000 S 2.50 S (4,800.00) 506 004 TEMP SEDIMENT CONTROL FENCE (REMOVE) EA 18920 17000 $ 0.50 $ (960.00) TOTAL: S 9,920.00 ORIGINAL CONTRACT AMOUNT:. NET FROM PREVIOUS CHANGE ORDERS: TOTAL AMOUNT OF THIS CHANGE ORDER: PERCENT OF THIS CHANGE ORDER: TOTAL PERCENT CHANGE ORDER TO DATE: NEW CONTRACT AMOUNT: ACC ALLCO ONTRACT G, INC., REPRESENTATIVE REVW X: ZHEN _ TAN, P. . ITY ENGINEER APPROVED BY: KYLE HARES, CITY MANAGER $ 15,984,397.88 $ 9,920.00 0.06% 0,06% $ 15,994,317.88 REVIEWED BY: DR OSEP ALANI, P. IA � STED BX: q, TINA BROUSSARD, CITY CLERK CITY OF BEAUMONT DATE: Febm2ry26,2020 JORIGINALCONTRACTTIME(DAYS): 1 1192 PROJECT: Wubington Bt+d-Phase 11 OWNER: CITY OF BEAUMONT jADDrrlONAL TIME REQUESTED: 10 CONTRACTOR: ALLCO CHANGE ORDER NO.: 9 ICEW CONTRACT TIME: 1202 THE'-FOLI;0'0iNG CHANdZS m THE PLANS'ATSD(OR SPEOIF2CA.TIONB ARE HEREBY MADB. ' Mjm the estfimed gontities to reflect the wnW quamides usi in 0e compledon of the pivjed A tops ortno (2) sheets have been added to the plan uL Thcy me she4t 1E3 tnd st= I S4. Item No. Item Cade Desc,iption Unit Original Quant) New Quandp UnitPrice Total 465 Ott) JUNCTION NCTION BOX (CONFLICT B030 (5' WIDE) (S'LONG) (IC'6'FA 0 2 S 14,237.00 S 28,474,00 TOTAL: S 28,474.00 10-CALENDER DAYS ARE ADDED TO THE CONTRACT TIME BY THIS CHANGE ORDER ORIGINAL CONTRACT AMOUNT: S 15984,397.88 NET FROM PREVIOUS CHANGE ORDERS: s 16,505,464.99 TOTALAhdOUNT OF THIS CHANGE ORDER S 28,474.00 PERCENT OF THIS CHANGE ORDER 0.17% TOTAL PERCENT CHANGE ORDER TO DATE: 3.44% NEW CONTRACT AMOUNT: S 16,533,938.99 AC JrD B " 3 z3 zo ALLCO coNVAcnNr,. INC., DATE REPRESENTATIVE REVIEWED BY: AMALIA IRLLARREAL DATE INTERIM CITY ENGINEER PREPARED BY: ng 3 --23 - 20 DAVID TINGLE DATE PROJECT MANAGER R )i II �- BA BARTK IAK DATE DIRECTOR OF PUBLIC WORKS AND TECHNOLOGY SERVICES APPROVED BY: A TED BY: /iblc�oa� � • S•aa KYLE HAYES, CITY MANAGER DATE T17A BROUSSARD, CITY CLERK DATE ' =�r.•: r�: .�rr. ,./.'l�":- Nam'+.<:..ST,;IS•�,�-,;-Yri?��i'^-,�:--.^—'c':.,�•'_-r,-.-;•. — ...,`"�.'i'.�--' _ .:.�5:1„•.:sri'�i't .`lfi Y..F,"t F•. '+;. .t �.. ,r�'+.'•c .:J'.;�,.4-��'`":,�[•, ll�rf•x'17:. !l: "SYi <2{�;�:4Fi;::. '� _;v� a,'•.t;.�. �.,Y..� ,L ,,.. is'r_.rl..r..�...rsn..•c,..;::v�,::$.Ys.. .:.. _..,..