HomeMy WebLinkAboutRES 19-197RESOLUTION NO. 19-197
WHEREAS, on September 18, 2018, the City Council of the City of Beaumont,
Texas passed Resolution No. 18-229 awarding a contract in the amount of $1,099,759.98
to Excavation & Construction, LLC, of Port Arthur, Texas, for the Chlorination Contact
Chamber Rehabilitation Project; and,
WHEREAS, on April 16, 2019, the City Manager executed Change Order No. 1, in
the amount of $3,000.00, for the installation of higher strength Class A concrete and the
reduction in quantities of concrete used for the project, thereby increasing the total
contract amount to $1,102,759.98; and,
WHEREAS, on August 6, 2019, the City Manager executed Change Order No. 2,
in the amount of $19,862.00.00, was required to order and replace four (4) gates due to
their unrepairable condition per the manufacturer and to sod the surrounding area of the
Chlorination Contact Chamber to establish vegetation, thereby increasing the total
contract amount to $1,122,621.98; and,
WHEREAS, Change Order No. 3, in the amount of $18,000.00, is required to
perform necessary repairs to two (2) abandoned 42-inch stormwater lines that are
undermining the existing slope walls and discharging water into the Chlorination Contact
Chamber, thereby increasing the total contract amount to $1,140,621.98;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
0
THAT the City Manager be and he is hereby authorized to execute Change Order
No. 3, in the amount of $18,000.00 for additional work described above, thereby
increasing the total contract amount to $1,140,621.98 for the Chlorination Contact
Chamber Rehabilitation Project; and,
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 17th day of
September, 2019. 1; diwmco
r Becky Ames,-
RESOLUTION NO. 19-160
WHEREAS, on September 18, 2018, the City Council of the City of Beaumont,
Texas passed Resolution No. 18-229 awarding a contract in the amount of
$1,099,759.98 to Excavation & Construction, LLC, of Port Arthur, Texas, for the
Chlorination Contact Chamber Rehabilitation Project; and,
WHEREAS, on April 16, 2019, the City Manager executed Change Order No. 1,
in the amount of $3,000.00, for the installation of higher strength Class A concrete and
the reduction in quantities of concrete used for the project, thereby increasing the total
contract amount to $1',102,759.98; and,
WHEREAS, Change Order No. 2, in the amount of $19,862.00.00, is required to
order and replace four (4) gates due to their unrepairable condition per the
manufacturer and to sod the surrounding area of the Chlorination Contact Chamber to
establish vegetation, thereby increasing the total contract amount to $1,122,621.98;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 2, in the amount of $19,81 2.00 for additional work described above, thereby
increasing the total contract amount to $1,122,621.98 for the Chlorination Contact
Chamber Rehabilitation Project; and,
EXHIBIT "A"
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of 'the City of Beaumont this the 6th day of
August, 2019.
J
CITY OF BEAUMONT
Date:
September 3, 2019
Project:
Chlorination Contact Chamber
County:
Jefferson
District:
Beaumont
Contract Number:
WU0218-15Contact Chamber
Owner:
City of Beaumont
Contractor:
Excavation & Construction, LLC.
C.O. No.:
3
THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE:
Quantities added to adjust for a change in work regarding Gates.
Item No.
Item Code
Description
Unit
Original
Quantity
New
uantit
Unit Price
Total
Demo two (2) 42-inch R.C.P to outside limits of Chlorine Chamber (Approx.
999
005
120-LF each). Install concrete plugs (Not to exceed 24-inches in depth) in each
0
1.00
S 18,000.00
S 18,000.00
pipe. Backfill with C.S.S (2 sac) to reestablish slopes for chamber. Supply all
labor, equipment and materials to complete item.
TOTAL: S18,000.00
14 WORKING DAYS WILL BE ADDED TO THIS CHANGE ORDER
ORIGINAL CONTRACT AMOUNT:
NET FROM PREVIOUS CHANGE ORDERS:
TOTAL AMOUNT OF THIS CHANGE ORDER:
PERCENT OF THIS CHANGE ORDER:
TOTAL PERCENT CHANGE ORDER TO DATE:
NEW CONTRACT AMOUNT:
ACCEPTED BY:
EXCAVATION & UCTION,LLC-REP. 71AT19
PRE & REVIEW r
A OLD E CROCHE ADWAY DESIGNER IllDATE
APPROVED BY:
S1,099.759.98
$1,122.621.98
$18,000.00
1.64%
3.72%
S 1,140,621.98
REVIEWED BY:
--7r-.�C,aeA Ane / f, /,(,j 1/1 111-q
D JOSEF AJDALANI DATE
ATTESTED BY:
KYLE HAVES, CITY MANAGER DATE TINA BROUSSARD, CITY CLERK DATE
e
CITY OF BEAUMONT
Dolt:
July22,2019
Project:
Chlorination Contact Chamber
county:
Jeaemon
District:
Denumant
Contract Numhen
IVUOIIB-15 Conlact Cltnmbcr
'0mar:
CityefIleauntont .
Contractor;
Excavation & Construction, LLC.
C.O. No.%
2
b�.Ntl!�}.yi. .,.,..�,�ry,.,.•�.�d�.�sP1"f
�!'.f•.,a.¢�......ttR ...,.��34tr!.i!�;�t!'i.., 2Ef'�. ,.�T,.,..,..,....�'... _.� ..�.. ._.FiFt;it".,.Pr.......v....l .�f•�r,��... .�k i.l.� ).,ta � .?t
Quantities added to adjust for a change in %vosi: regarding Oates.
item No
lima Code
Dgeriplioa
Uall
Orlglnal
Newmmtil astti
unit Price
Total
7
XXXX
Weir Onto ScalRe lacoments
EA
4
0:00
S 1,200.0 1
$ 4800.00
999
XXXX
Unrorseen Work as Directed by the Owner ALLOWANCE
EA
1
0.00
$ 50 000.00
50 000.00
999
002
Remove aid Replace Exhft Gales
EA
0
4.00
S 2 .00
S 10 000.00
999
003
Foutaino A aonox Water Control Gates All Labor 3 t and Mree ais
EA
0
4.00
$ 15 228.00
S 60 912.00
999
004
Va atalive Establishment Sod and Watering)
SY
0
750.00
S 5.00
$ 3,750.00
rwaw a'Av.0abUv
�. w •lt �.l" t tp tr _.gyp. n.i,� .,..r,.. y++ ..-r.-•i.fin.'����• �tt�;r��vfi� •fi%}�[v:'J &� �5n
lit:�:i.StS:?.t^.F�i�:'•li.�:��i��:i�.i�7;� i�rLri�cf.�tG[L�s��.�yi�:Q:Y�1'„Ci;Ii/�1t$1�4��A}'t'�i ��Da�.l'l�i�T,ail�s:�a�i��i�.�..�.13�•:si11i1��.0.iA'•;kd-.iii;i-lx Ys�.ii;L'1i�L :'Y�u��i`;�P�sJi��
ORIGINAL CONTRACT AMOUNT:
$1,099,759.98
NET FROM rREVIOUS CHANGE ORDERS:
$1,102,759.99
TOTALAMOUNT OFTIM CHANGE ORDER;
S19,862.00
PERCENT OF THIS CHANGE ORDERS
1.80%
TOTAL PERCENT CHANGE ORDER TO DATE;
7-09%
NEW CONTRACT AMOUNT:
S1.142.621.98
ACCEPTED BY:
EXCAVATI CONSTRUMON,LLC-REP.
DATE
PREPft/-/
REVIEWED BYs
I DATA
0 L !
D1 EPH JDAL
AARbrit E. CROCHET, RO A ESIGNER
APPROVED BY:
ATT D DY: N
ICYLE HAYES, CITY MANAGER
DATE
ROVSSARD,
APPROVAL 011 CONTRACT CHANGE
CHANGE ORDERNo. Ono (1)
April 16, 2019
I1 Page 1 of 1
PROJECT: City of Beaumont, Texas
Chlorination Contact Chamber Rehabilitation
OWNER: City of Beaumont, Texas
801 Main Street
13eaumont,'1am 17104
CONTRACTOR: Excavation & Construction, LLC
6601 Proctor Street
Port Arthur, TX 77642
TO THE OWNER: Approval of the following contract change is requested.
Reason for Change: The Contract initially called for Class B conetete for the 61' rip rap replacement. Excavation and removal of
the existing concrete slopes revealed field conditions that require a higher strength design mix for the rip rap. Item 10 will allow for
Chas A concrete (higher strength) to be installed.
ORIGINAL CONTRACT AMOUNT:
THIS CHANGE ORDER
Description;
ADD
Item 10 G" Concrete Rip Rap Rcplacement, Class A Concrete
A.UJUS'f
Item 2 Reduce the quantities from 800 CYto 200 CY
$ 1.099,75998
Unit Price Wanth Net Change
S89o.38/CY
TOTAL AMOUNT OF THIS CHANGE ORDER:
TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDM.-
CONTRACT TIME
Original Contract Time: 150 Calendar Days
Additional Time Requested: 0 Calendar Days
kevised Contract Time per this Change Order. ISO Calendar Days
600.00 S 534,228A0
S (531,229.00)
S 3,000mu
S 1® 102,759.98_
CONDITION OF CHANGE:
"Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order
represents hill compensation for all increased and deoteasm in the cost of, and the time required to perform the entire work under
the Contract arising directly or indirectly from this Change Orden' and ell prelvions Change Orders, Acceptance of this waiver
constitutes an agreement between Owner and Contractor that the Change Order reprd5cnls an all inclusive, mutually agreed upon
adjustment to the Contract, and that Contractor wffi waive all rights to ille a claim on this Change Order after it is properly
executed."
Recommended by
O ., t
ty of eavmont
Public orks Ditcctor
Date: Lth0q'
Approved b
City ofBeaumont
Owner
Date: 2-6-11
Accepted by:
Excavation & Construction, LLC
Contractor
Date:... _� (oP! 0