HomeMy WebLinkAboutRES 19-180RESOLUTION NO. 19-180
WHEREAS, on April 30, 2019, the City Council of the City of Beaumont, Texas
passed Resolution No. 19-088 awarding a contract in the amount of $129,057.00 to
Signature Group, of Port Neches, Texas, for the Beaumont Municipal Airport Box -
Hangar Access Taxiway Project; and,
WHEREAS, Change Order No. 1, in the amount of $7,015.23, is required to
adjust the estimated quantities in the contract to reflect actual quantities used in the
completion of the project, thereby increasing the total contract amount to $136,072.23;
and,
WHEREAS, the project has been inspected by the Engineering Division and
found to be complete in accordance with the provisions and terms set forth in the
contract;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 1, in the amount of $7,015.23, for additional work described above, thereby
increasing the total contract amount to $136,072.23 for the Beaumont Municipal Airport
Box -Hangar Access Taxiway Project; and,
BE IT FURTHER RESOLVED THAT the Beaumont Municipal Airport Box -
Hangar Access Taxiway Project be and the same is hereby accepted; and,
BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make
final payment in the amount of $82,018.76 to Signature Group, of Port Neches, Texas.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 27th day of
August, 2019.
1�Ior Becky
RESOLUTION NO. 19-088
WHEREAS, the City of Beaumont solicited bids for furnishing all labor, materials,
and equipment for the Beaumont Municipal Airport Box -Hangar Access Taxiway
Project; and,
WHEREAS, Signature Group, of Port Neches, Texas, submitted a complete bid
meeting specifications in the amount of $129,057.00; and,
WHEREAS, the City Council is of the opinion that the bid submitted by Signature
Group, of Port Neches, Texas, is the lowest responsible bidder providing the best value
to the City and should be. accepted;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to. this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Council hereby approves the award of a contract to Signature
Group, of Port Neches, Texas, in the amount of $129,057.00, for the Beaumont
Municipal Airport Box -Hangar Access Taxiway Project; and,
BE 1T FURTHER RESOLVED THAT the City Manager be and he is hereby
authorized to execute a contract with Signature Group, of Port, Texas, for the purposes
described herein.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
EXHIBIT "A"
74
0
PASSED BY THE CITY COUNCIL. of the City of Beaumont this the 30th day of
April, 2019.
EWA
l ►�i �4
-.:-
crry OF BEAUMONT
DATA Aop m20.2019 ORIGL\AL CONRtACTTIIHE(DAVS):60
PROJECT• BFAUMONT?RINTCIPALAIRPORT BOX -HANGAR ACCESSTA.VWAY
OWER: CITY OF BEAUMONT ADDITIONAL TUITE REQUESTED. 0
CONTRACTOR: SIGNATURE GROUP
CHANGE ORDER N0.: 01 -FINAL INEW CONTRACT T1A1E 60
THE POLLOWNG CHANGES IN TEE PrJAM AHD/OR SPECIFICATIONSARE HEREBY WADE:
Adjtsl IhC.A®fad 9� b fe1)en tlro amd V®1®d bOd iO tllt COO�GCOO OI111C PNjed
I—Na
Dem C.&
Ddniptrm
UaU
-h-Q-why
Ouzntitj
Um Prim Taal
06
P•156
E—C—III—Sif —
.LF
a0D0
29.00 S 1371s 11134LT7)
12
9999
COOmad Cmsnadmn Famnce(RemmaS replacefe®gl(Plac. bWl—k 6: d.—papw)
LS
L00
0.00 S U576.00 S (I3A7&M)
t2
9999
Comwd Comnmiov Emrvse (fiemmn 3 [rylafe fmdnFl lPlare bdl bck k dni0ape pipet
LS
0po
LOD 'S 219`3.00 S 2L926D0
i
TOTAL PERCENT CHANGE ORDER TO DATES
TOTAL 5 vom
O-CAT.ENDBR DAYS ARE ADDED TO THE COIPPRACT ADD BY THIS CHANGE ORDER
ORIGINAL CONTRACT AMOUNT:
S
129.057.00
NET FROM PREVIOUS CHANGE ORDERS:
S
TOTAL AMOUNT OF THIS CHANGE ORDER:
S
7.01523
PERCENT OF THIS CHANGE ORDER
5.449.
TOTAL PERCENT CHANGE ORDER TO DATES
5.44V.
N W CONTRACT ANIOUNT:
S
136.072.23
ACCEPTED BY:/ .�
PREPARED BY:
X�/ a�
,
a/z '//qSIGNATURE
GR OUP. REPRESENTAT
DATE
PMUNCSON WHITT
DATE
ROADWAY DESIGNER -1
REVIEII -
REVD BY
q
RO OCHET
"DTE
D JO I\LVD
P.
ROADWAY DESIGN
-
/1rUBll 'ORAS DIRE-CibiltJ_
APPROVED BY:
ATTESTED BY:
M'LE HALT—%CITY MANAGER DATE TINA BROUSSARD. CITY CLERK DATE
MV nC MCAI IRAek6IT
CQTMATC- .
PROJECT:
Beaumont Municipal Aiort BoA•Han rAccess TGAway
AWARDED CONTRACT AMOUNT:
$129,057.00-
PERCENTOFTIME USED:
SUBTOTALI
100.00%
CONTRACTOR:
SI 6lure Grou
CONTRACTDATE-.:
June17 2079
AMOUNT DUE THIS ESTIMATE:.
PERCENTOF WORBCOMPLETEDI.
IDSA4%
MONTHLY ESTIMATE 61 034tNAL
CURRENTCONTRACF AMOUNT:
6,072.13
PERIODENDINGI
Au uST1 2019•Au ust3f 2019
CONTRACT CALENDAR DAYS:
60
CHANGE ORDERS 1
01
CALENDAR DAYS USED t
60
ITEM SPEC
NO. NO.
DESCRIPTION
UNIT EST.
MEASURE CITY
PREVIOUS TO DATE
ESTIMATE ESTIMATE
TOTAL ESTIMATE
TO DATE
UNIT
PRICE
TOTAL
AMOUNT
at MDR
MobaWeontNtli-edSRl
IS 1
0.75
0.15
1.00 S
3455.00 S
3.165.00
01 TLMP
Tempo" Musb%UEh0g, Dankades, ATnffk CMtrd lUnit plko ld at no mwelAro$5000.00)
MO 1
130
030
1.00 f
3,717.06 S
r,774.16
07. P152
la glle4 sftwe, a Embankment torch fkal Endow
LS 1
036
.0.74
LOO S
61216.00 $
81716.00
04. PISS
Ilene
TON 20,
19.S1
.0.4
10.00 S
)SOLS! S
5,022:10
6s P733
Unit 51ab9be Subpado In
SY 84
640.00
CLOD
641LW $
1136 $
11,790.40
06 1 P156
IttOlkn Cmbd 54nitt•SM FMII
U 29
29.001
0.00
19.00 I $
1.77 S
'66.73
07 wog
CnnhedAWepleeu.Ceunel6ry
37 840
646.00
Om
840.66 f
26.60 S
10,813.00
08 P-501
PRddaled FCCParemenl
SY 765
0.00
71SA0
763.00 S
_ 64.66 $
S0.756.f0
09 D•705
14' RCP
V ICL
0.00
I6.00
MOD S
45.34 S
726.64
10 T•901
Seedhij
ACRE I
0.00
L00
LOD $
49S4AO S
4,984.00
21 T-903
Mu ftj -
ACRE 1
0.00
Loo
IAD $
2,215.00 S
1.11Sm
12 9999:
C -td Constw111.fth xe[A--6,ept- fendW IN- ba mit 6 dnluale plpe)
LS t
030
030
1,00 $
21,916.00 $
21,926.00
PREPAR
REVIEW
APPROL
l eenw th
been rompfdederde6aerrdN Mdwv�
d
SIGNA REGROUP,RE ESE ATIVEATE
GRAND TOTAL AMOUNT OF WORK DON E:
$
134072.23
LESS S% RETAINAGE:
SUBTOTALI
$
136,072.23
- LESS PREVIOUS PAY ESTIMATE:
'$
5053.47
AMOUNT DUE THIS ESTIMATE:.
$
82,018.76
1of1