Loading...
HomeMy WebLinkAboutRES 76 273l R- ? � - ar73 R E S O L U T -I O N WHEREAS, a contract was awarded to C & S Truck Line, Inc. and E. R. Dupuis Concrete Ccopany, Inc., a joint venture, for the construction of Lavaca. Street CIP Project 11 -ST -121; and, WHEREAS, construction on this project has been completed with the exception of a 100 foot long section of pavement that cannot be completed until Southern Pacific installs a wooden plank crossing at that location; MR WHEREAS, the delay in the completion of this project has not been caused by the contractor and Forty -Seven Thousand Six Hundred Forty -Five and 56/100 ($47;645.56) Dollars is presently due and payable to the con- tractor for the completed portion of Lavaca Street that has been in- spected by the Engineering Division and found to be constructed in accor- dance with the plans and specifications; t NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the appropriate City official be, and he is hereby, authorized to pay to C & S Truck Line, Inc. and E. R. Dupuis Concrete Company, Inc., a joint venture, the amount of $47,645.56 for the completed portion of Lavaca. Street CIP Project 11 -ST -121. j PASSED BY THE CITY COUNCIL of the City of Beaumont this the day of 1976. - Mayor - fJ�