Loading...
HomeMy WebLinkAboutRES 75 240R E S O L U T I O N WHEREAS, the City of Beaumont and D & D Construction Company entered into a certain agreement to furnish all labor, superintendence, material and equipment to perform all work necessary to the construction of Phase I for improvements at the Beaumont Municipal Airport, the same being Project No. ADAP 7-48-0240-01; and, WHEREAS, Change Order No. l to said contract has been proposed, under which said change order, the following changes will be made: and, 1. Substitution of 100 feet of 24" pipe, Item 701-2, for 100 feet of bitch "M". The pipe would make it possible to salvage two airplane stalls. FAA runway and taxiway clearance requirements will be met. 2. Substitute lime rock base material for shell base material. The proposed lime rock will meet FAA Spec. P-211. Engineers feel lime rock will provide a better base material. 3. Deletion of 178 C.Y. of unclassified excavation. Will be replaced by 100 feet of pipe in Part A. WHEREAS, due to credit for substitutions, the total contract cost in regard to this change order will not be affected and the original contract sum of $510,868.00 will not be changed; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby, authorized to execute on behalf of the City of Beaumont the above described change order to, the original contract, and that the City Clerk is hereby authorized to at- test to same and to affix the Seal of the City of Beaumont thereto. PASSED BY THE CITY COUNCIL of the City of Beaumont this the day of 1975. Imo' ''���-