Loading...
HomeMy WebLinkAboutRES 25 FFFKEWJr/gh/4/10/7-.,- �45_ FFF A RE S O LUT I O N WHEREAS, on April 3, 1973, the City received bids for cleaning and painting the exterior of the elevated water storage tanks located at 1155 Glendale and 1550 Pine Streets; and, WHEREAS, McCrea Water Tower Maintenance and Repair submitted a bid in the -sum of $4,900.00 with 60 days to com- plete the work for cleaning and painting the exterior of the elevated water storage tanks located at 1155 Glendale and 1550 Pine Streets; and, WHEREAS, the City Council is of the opinion that the bid submitted by McCrea Water Tower Maintenance and Repair is the lowest and best bid and should be accepted and contract entered into with McCrea Water Tower Maintenance and Repair for said cleaning and painting of the exterior of the elevated water storage tanks.located at 1155 Glendale and 1550 Pine Streets; NOW, THEREFORE, BE IT RESOLVED BY THE -"CITY COUNCIL OF THE CITY OF BEAUMONT: That the bid of McCrea Water Tower Maintenance and Repair be accepted and the City Manager be, and he is hereby, authorized to execute on behalf of The City of Beaumont the contract with McCrea Water Tower Maintenance and Repair for cleaning and painting the exterior of the. -elevated water storage tanks located at 1155 Glendale and.1550 Pine Streets, in accordance with the specifications submitted to bidders for the sum of $4,900.00 with 60 days to complete the work; and the City Clerk is hereby authorized to attest to said contract and to affix rt 0 rt �31 Hw En rt �31 (D 0 I -h