HomeMy WebLinkAboutRES 19-152RESOLUTION NO. 19-152
WHEREAS, on June 4, 2019, the City Council of the City of Beaumont, Texas
passed Resolution No. 19-110 accepting the final report of the Beaumont Municipal
Airport Development Plan; and,
WHEREAS, THE Texas Department of Transportation (TxDOT) Aviation Division
wishes to use accrued Non -Primary Entitlement (NPE) funds in the amount of
$600,000.00 for Capital Improvements at the Beaumont Municipal,Airport; and,
WHEREAS, City Council is of the opinion that it is in the best interest of the
citizens of the City of Beaumont for the City to enter into a Letter of Intent and an Airport
Project Participation Application with the Texas Department of Transportation (TxDOT)
Aviation Division for improvements at the Beaumont Municipal Airport;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute a Letter of
Intent and an Airport Project Participation Application between the City of Beaumont
and the Texas Department of Transportation (TxDOT) Aviation Division for
improvements at the Beaumont Municipal Airport. The Letter of Intent is substantially in
the form attached hereto as Exhibit "A" and made a part hereof for all purposes. .
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 23rd day of
July, 2019.
11111
:-
jjjo
July 23, 2019
Mr. Greg Miller, Director of Planning and Programming
Aviation Division
Texas Department of Transportation
125 E. 11th Sheet
Austin, TX 78701-2483
Dear Mr. Miller:
The City of Beaumont, by this letter indicates its intent to
Department of Transportation for the following improvers
outlined in the attached Table 5C Intermediate and LQrig '
3B Rehabilitate Runway & Con
4B Rehabilitate North Apron &
The cost of these improvements is presently
understands that financial assistance mayle
share of eligible costs and any ineligible bd14
City of Beaumont further understands that -i1
Transportation written request, or within 30
Participation Agreement
For your review, see atii}'
project which was preps
Development Plan which
Please
Sincerely,
Kyle Hayes
City Manager
H.W.
ie"financial assistance from the Texas
:o theBeaumont Municipal Airport as
Capital Improyement Plan Summary:
(Asphalt)
estimated to 6-360;4°;000.00. The City ofBgnumont
Available for 900ercent of the eligible costs. The remaining
rs' slall;;be the resporisbJlity of the City of Beaumont. The
full share;shalI be du hii acash upon Texas Department of
days of compl4ete,execud&. of the Airport Project
J i,.^
inion iif.Pr.,o>iable Constr zction Cost for each proposed
x,Inc.,'` d also prepared the City of Beaumont's Airport
Cc: Dr. Joe Majdalani, P.E., Public Works Director
Todd Simoneaux, Chief Financial Officer
Dara Woodruff, Capital Projects Administrator
Kaity Cromwell, TxDOT Aviation Division
behalf at 409-880-3725 or by email at
Attachments: Table 5C: Intermediate and Long -Term Capital Improvement Plan Summary
Engineer's Opinion of Probable Construction Cost
Site Drawing Map
EXHIBIT "A"
to total approximately $2.1 million. The federal and/or state share of capital improvements costs total
nearly $1.7 million; although the maximum available AIP entitlement funds during the period is expected
to be $600,000 to $750,000. The city's share of capital improvements during the same period totals almost
$440,000.
Recommended capital improvements for the long-range planning period are expected to include runway
reconstruction; apron and taxiway pavement rehabilitation; lighting system upgrades; and significant
hangar development totaling approximately $10.9 million. The federal share of capital improvements
costs total nearly $7.4 million; although the maximum available AIP entitlement funds during the period
is expected to be $600,000 to $750,000. The city's share of capital improvements during the same period
totals nearly $3.5 million.
Similar to the 6-10 year planning period, local share of improvement costs are increased due to clear span
and FBO hangar construction. The city, tenant, and/or third -party investors will fund 100 percent of this
development.
Table SC: Intermediate and
1 B
Acquire Land (7 acres) - Runway 13 RPZ
Costs are Not Available for Land Acquisition
2B
Acquire Land (10 acres) - Runway 31 RPZ
Absent an Appraised Value
Construct Self -Serve AVGAS and Jet A Fuel Dispenser
3B
Rehabilitate Runway & Connecting Taxiway (Asphalt)
$333,000
$37,000
$370,000
4B
Rehabilitate North Apron &'Taxiway (Asphalt)
$211,000
$23,000
$234,000
5B
Upgrade AWOS-IIIP/T
$203,000
$22,000
$225,000
6B
Construct 6 -Unit T -Hangar and Taxilanes
$540,000
$60,000
$600,000
7B
Construct Clear Span Hangar (1) (5,000 sq. ft./hangar)
$0.00
$250,000
$250,000
8B
Install REILs - Runway 31
$23,000
$2,000
$25,000
9B
Construct Self -Serve AVGAS and Jet A Fuel Dispenser
$379,000
$42,000
$421,000
at West Side of Terminal Parking Apron
Total Phase II Project Costs
$1,689,000
$436,000
$2,125,000
Long -Term
1C
Reconstruct Runway 13-31 (4,000'x 75')
$4,050,000
$450,000
$4,500,000
2C
Rehabilitate/Reconstruct South Apron (PCC)
$675,000
$75,000
$750,000
3C
Rehabilitate Taxiway System
$450,000
$50,000
$500,000
4C
Upgrade Runway Lighting (MIRL)
$675,000
$75,000
$750,000
5C
Upgrade Taxiway Lighting (MITE)
$450,000
$50,000
$500,000
6C
Construct 12 -Unit T -Hangar and Taxilanes
$1,080,000
$120,000
$1,200,000
7C
Construct Clear Span Hangar (3) (5,000 sq. ft./hangar)
$0.00
$1,500,000
$1,500,000
8C
Construct FBO Hangar (12,000 sq. ft.)
$0.00
$1,200,000
$1,200,000
9C
Expand Auto Parking Area (1,200 sq. ft.)
$23,000
$2,000
$25,000
Total Phase III Project Costs
$7,403,000
$3,522,000
$10,925,000
Note: All costs are rounded to the nearest thousand for planning purposes
and are
based on current
dollar value:
Source: Lochner.
Beaumont, Tvai
Development Plan Update
Final Report
Page 5.5
BEAUMONT MUNICIPAL AIRPORT
CITY OF BEAUMONT
TxDOT CSJ NO.
BASE BID
Rehabilitate and Mark Runway 13-31, Connecting Taxiways, Taxiway, and Apron'
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
May 13, 2019
Base Bid - Subtotal $ 524,910.00
Estimated Contingency (15%) $ 78,736.50
Base Bid w/ Contingencies $ 603,646.50
DEDUCTIVE ALTERNATE 1
Rehabilitate and Mark Taxiway, and Apron
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
May 13, 2019
Bid Schedule: l
ITEM
ITEM
SPEC.
UNIT
UNIT
NO.
NO.
NO.
ITEM DESCRIPTION
QUANTITY
UNIT
COST
TOTAL
1
C-105-1
Mobilization
1
L.S.
$ 45,000.00
$ 45,000.00
2
SS -02-1
Barricades
1
L.S.
$ 10,000.00
$ 10,000.00
3
P-101-5.1
Full Depth Pavement Repair
1,000
S.Y.
$ 90.00
$ 90,000.00
4
P-605-5.1
Clean and Seal Joints and Cracks < 1"
36,000
L.F.
$ 1.75
$ 63,000.00
5
P-605-5.2
Clean and Seal Joints and Cracks > 1"
3,000
L.F.
$ 8.00
$ 24,000.00
6
P -620-5.1a
Surface Preparation
1
L.S.
$ 40,400.00
$ 40,400.00
7
P -620-5.2b
Reflectorized Pavement Marking
34,700
S.F.
$ 1.50
$ 52,050.00
8
P520 -5.2c
Non-Reflectorized Pavement Marking
900
S.F.
$ 1.40
$ 1,260.00
9
P -020-5.3c
Taxiway Centerline Green Reflective Marker
100
E.A.
$ 15.00
$ 1,500.00
10
P-629-8.1 a
Thermoplastic Coal Tar Emulsion Sand Slurry Seal
65,900
S.Y.
$ 3.00
$ 197,700.00
Base Bid - Subtotal $ 524,910.00
Estimated Contingency (15%) $ 78,736.50
Base Bid w/ Contingencies $ 603,646.50
DEDUCTIVE ALTERNATE 1
Rehabilitate and Mark Taxiway, and Apron
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
May 13, 2019
Alternate -Subtotal $ (203,775.00
Estimated Contingency (15%) $ (30,566.25
Deductive Alternate 1 w/ Contingencies $ (234,341.25
Total Base Bid: Rehabilitate and Mark Runway 1331, Connecting Taxiways, Taxiway, and Apron w/ Contingencies $ 603,646.50
Total Base Bid: Rehabilitate & Mark Runway and Connecting Taxiways w/ Contingencies $ 369,305.25
Bid Schedule: D1
ITEM
SPEC.
UNIT
NO.
NO.
ITEM DESCRIPTION
QUANTITY
UNIT
COST
TOTAL
DA -1
C-105-1
Mobllization
0
L.S.
$ 45,000.00
$
DA -2,
SS -02-1
Barricades
0
L.S.
$ 10,000.00
$ -
DA -3
P-101-5.1
Full Depth Pavement Repair
(1,000)
S.Y.
$ 90.00
$ (90,000.00
DA -4
P-605-5.1
Clean and Seal Joints and Cracks < 1"
(13,300)
L.F.
$ 1.75
$ (23,275.00
DA -5
P-6055.2
Clean and Seal Joints and Cracks > 1"
(1,200)
L.F.
$ 8.00
$ (9,600.00
DA -6
P -620-5.1a
Surface Preparation
(1)
L.S.
$ 4,000.00
$ (4,000,00
DA -7
P -620-5.2b
Reflectorized Pavement Marking
(1,900)
S.F.
$ 1.50
$ (2,850.00
DA -8
P -620-5.2c
Non-Reflectorized Pavement Marking
(500)
S.F.
$ 1.40
$ (700.00
DA -9
P -620-5.3c
Taxiway Centerline Green Reflective Marker
(30)
E.A.
$ 15.00
$ (450.00
DA -10
P-629-8.1 a
Thermoplastic Coal Tar Emulsion Sand Slurry Seal
(24,300)
S.Y.
$ 3.00
$ (72,900.00
Alternate -Subtotal $ (203,775.00
Estimated Contingency (15%) $ (30,566.25
Deductive Alternate 1 w/ Contingencies $ (234,341.25
Total Base Bid: Rehabilitate and Mark Runway 1331, Connecting Taxiways, Taxiway, and Apron w/ Contingencies $ 603,646.50
Total Base Bid: Rehabilitate & Mark Runway and Connecting Taxiways w/ Contingencies $ 369,305.25
'o¢. J,yc,,-l�� .. _� �` - �. � r _ �i\'. F' ,�. CAf t,l'ji5.._.•1 f S,ti, .
f.,m„P��,."'��---..:,.r--..v,.+•�rzac�V�s4•r'nr"R'.y`^�.a-�...,,f.•1�'.--rc"n'�FeS�'�-,+,+,++—.�,..�r+=r�r-+:e,.,--'L••'°L_ :... .r^-:.� ' ,�.+'7_.�'i,.�•�r. ,..� �
• � r
r-: It
L'
Rehabilitateand
Remark
4 tr,ty, 01Rehabilitateand L , Apron • i
+ -•
AlternateAlternate 1)
^` 1�
/.` 'R'•� � ' r '1� ,r, /til '1 �'Q��i;l]
Rehabilitate and Remari
Connecting Taxiway
(Base Bid)IIty, r' � • ,
� f • v � '� -=•,off .S ,t1 , ,
4 I � a) `-•�•. .�' 'j-.--'r'�'`` ;, X11,. r
'RehabilitateandRemark
(Base
Bid) I t a
• .1� B •
n n
n
�:�--•�-ms=s--- - ; s�' .. , .i�'•1 __ _ . '=:><
P ,li� ( �� � ,- • Jr