Loading...
HomeMy WebLinkAboutRES 19-113RESOLUTION NO. 19-113 WHEREAS, bids were solicited for a four (4) month contract, with the option of two (2) renewals of four (4) month terms at the same pricing as the awarded contract, to provide sewer point repair services for use by the Water Utilities Department; and, WHEREAS, MK Constructors, of Vidor, Texas, submitted a bid in the amount of $250,000.00 in each four (4) month term for a total cost of $750,000.00 in the unit amounts shown on Exhibit "A," attached hereto; and, WHEREAS, City Council is of the opinion that the bid submitted by MK Constructors, of Vidor, Texas, is the lowest responsible bidder providing the best value to the City and should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the bid submitted by MK Constructors, of Vidor, Texas, for a four (4) month contract, with two (2) four (4) month renewal options at the same pricing as the awarded contract, to provide sewer point repair services in the amount of $250,000.00 in each four (4) month term for a total cost of $750,000.00 pursuant to the unit amounts shown in Exhibit "A," attached hereto, be accepted by the City of Beaumont; and, BE IT FURTHER RESOLVED THAT the City Manager be and he is hereby authorized to execute a contract with MK Constructors, of Vidor, Texas, for the purposes described herein. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 4th day of June, 2019. et'nar BEAUM©NT TEXAS CITY OF BEAUMONT PURCHASING DIVISION Terry Welch, Senior Buyer. 409-880-3107 terry.welch@beaumonttexas.gov BID TABULATION: Four (4) Month Contract For Sewer Point Repair Bid No:TF0419-28 OPENING DATE: May 23, 2019 ` PRICING FOR MK CQNSTRUCTORS "'J" Item No: .Spec Ref s ' Description Unit. IIriit Price UnrtPrice Ml I / x ; ;factor.of 1.0000 . - 1 2558 Cleaning 6"-12".Sewer, All Depths LF $2.10 $2.10 2 2558 Cleaning 15"-24" Sewer, All Depths LF $3.20 $3.20 3 2558 TV Inspection 6"-12" Sewer, All Depths LF $1.60 $1.60 4 2558 TV Inspection 15"-24", All Depths LF $2.20 $2.20 5 2553 Point Repair 6"-12", Up to 10' Depth DAY $3,500.00 $3,500.00 6 2553 Point Repair 6"-12", 10'-15' Depth DAY $3,800.00 $3,800.00 7 2553 Point Repair 6"-12", Over 15' Depth DAY $ 4,800.00 $4,800.00 8 2553 Point Repair 15"-24", Up to 10' Depth DAY $ 4,000.00 $4,000.00 9 2553 Point Repair 15"-24", 10'-15' Depth DAY $4,800.00 $4,800.00 10 2553 Point Repair 15"-24", Over 15' Depth DAY $5,000.00 $5,000.00 11 2553 Extra Length Point Repair, When Approved by Engineer LF $100.00 $100.00 12 Spoil Haul Off for Point Repair HR $75.00 $75.00 13 2821 Chain Link and Wooden Fences and Gates (Non- Commercial LF $25.00 $25.00 14 2821 Chain Link Fences and Gates with Barbed Wire (Commercial) LF $45.00 $45.00 15 361 Full Depth Repair of Concrete Side Walk (4") SY $80.00 $80.00 16 361 Full Depth Repair of Concrete Driveway (6") SY $95.00 $95.00 17 361 Full Depth Repair of Concrete Roadway (8") SY $145.00 $145.00 18 361 Repair of Concrete Pavement (8"-10"), 5000 PSI SY $300.00 $300.00 19 529 Repair of Curb and Gutter LF $29.00 $29.00 20 361 Repair of Wheelchair Ramps SF $60.00 $60.00 21 351 Flexible Pavement Structure Repair (2") SY $65.00 $65.00 22 351 Semi -Rigid Base Repair SY $27.00 $27.00 Bid Table Continued EXHIBIT "A" Page 2 Bid No:TF0419-28 23 351 Asphalt Overlay SY $50.00 $50.00 24 2221 Sawcut Pavement L.F. $ 8.00 $8.00 Remove and Replace or Install New Std. Manhole, 25 3 301 Up to 8' Depth, with All Joints & Connections (Pre- EACH $4,500.00 $4,500.00 Cast Concrete or Fiberglass) Install Shallow Manhole, Less than 5' Depth, With 26 3 301 All Joints & Connections (Pre -Cast Concrete or EACH $3,500.00 $3,500.00 Fiberglass) Extra Depth for New or Replacement Std. Manhole, 27 Over 8 Feet Depth (Pre -Cast Concrete or V.F. $250.00 $250.00 33001 Fiberglass) 28 2555 Adjust/Reset Manhole with Existing Frame and EACH $500.00 $500.00 Cover Up to One Foot 29 2555 Adjust/Reset Manhole with New Frame and Cover EACH $700.00 $700.00 Up to One Foot (Detail H-11 and H-60) 30 2555 Adjust/Reset Manhole in Excess of One Foot V.F. $500.00 $500.00 (Detail H-57 and H-58) Reconnect Service Connection by Excavation 31 2534 Including Cleanouts to Liner, Complete, All Sizes, EACH $600.00 $600.00 All Depths 32 502 Minor Traffic Control (Signs, Barricades, etc.), EACH $250.00 $250.00 When Approved by Engineer 33 502 Major Traffic Control (Signs, Barricades, etc.), EACH $ 2,000.00 $2,000.00 When Approved by Engineer 34 502 Flagmen (Uniformed Officer), When Approved by HR $55.00 $55.00 gineer 35 502 Certified Flagmen, When Approved by Engineer HR $33.00 $33.00 36 402 Trench Excavation Protection (Up to 15' Depth) L.F. $5.00 $5.00 37 402 Trench Excavation Protection (Over 15' Depth) L.F. $300.00 $300.00 38 1540 6"x6" Pump Installation Operation, and HR $55.00 $55.00 Maintenance 350' Maximum (Min. 3 hours) 39 1578 Well Point Dewatering Setup When Approved by EACH $7,000.00 $7,000.00 Engineer 40 1578 Well Point Dewatering Operation When Approved L.F. $35.00 $35.00 by Engineer 41 817 Cement Stabilized Sand, 1.64 TONS/CY TON $38.00 $38.00 42 2221 Removal of Cement Stabilized Sand CY $135.00 $135.00 43 Extra Concrete, 5000 PSI NR CY $500.00 $500.00 44 - Weekend Premium CREW $600.00 $600.00 Bid Table Continued Page 3 Bid No:TF0419-28 B. MOBILIZATION AND ALLOWANCE m Spec' ' beseriphon . , iTnit - Umt Price No Factor m"Total Ref ^ . ; Included 1 - Unforeseen Work as Directed by Owner ALLOW $10,000.00 $10,000.00 Mobilization, including Payment Bond, 2 - Performance Bond, Insurance, and Moving LS $12,500.00 $12,500.00 Equipment to Project Sites TOTAL FOR ABOVE FOR MK CONSTRUCTORS: $71,069.10 Bid Table Continued Page 4 Bid No:TF0419-28 PRICING FORT CONSTRUCTION LLC Item No: Spec��', Ref . ` ' . .Description 'Unit , . iln t Price UnitPrice Mult/ z factor of -L20' 1 2558 Cleaning 6"-12" Sewer, All Depths LF $2.10 $2.52 2 2558 Cleaning 15"-24" Sewer, All Depths LF $3.20 $3.84 3 2558 TV Inspection 6"-12" Sewer, All Depths LF $1.60 $1.92 4 2558 TV Inspection 15"-24", All Depths LF $2.20 $2.64 5 2553 Point Repair 6"-12", Up to 10' Depth DAY $3,500.00 $4,200.00 6 2553 Point Repair 6"-12", 10'-15' Depth DAY $3,800.00 $4,560.00 7 2553 Point Repair 6"-12", Over 15' Depth DAY $ 4,800.00 $5,760.00 8 2553 Point Repair 15"-24", Up to 10' Depth DAY $ 4,000.00 $4,800.00 9 2553 Point Repair 15"-24", 10'-15' Depth DAY $4,800.00 $5,760.00 10 2553 Point Repair 15"-24", Over 15' Depth DAY $5,000.00 $6,000.00 11 2553 Extra Length Point Repair, When Approved by Engineer LF $100.00 $120.00 12 Spoil Haul Off for Point Repair HR $75.00 $90.00 13 2821 Chain Link and Wooden Fences and Gates (Non- Commercial LF $25:00 $30.00 14 2821 Chain Link Fences and Gates with Barbed Wire (Commercial) LF $45.00 $54.00 15 361 Full Depth Repair of Concrete Side Walk (4") SY $80.00 $96.00 16 361 Full Depth Repair of Concrete Driveway (6") SY $95.00 $114.00 17 361 Full Depth Repair of Concrete Roadway (8") SY $145.00 $174.00 18 361 Repair of Concrete Pavement (8"-10"), 5000 PSI SY $300.00 $360.00 19 529 Repair of Curb and Gutter LF $29.00 $34.80 20 361 Repair of Wheelchair Ramps SF $60.00 $72.00 21 351 Flexible Pavement Structure Repair (2") SY $65.00 $78.00 22 351 Semi -Rigid Base Repair SY $27.00 $32.40 Bid Table Continued Page 5 Bid No:TF0419-28 23 351 Asphalt Overlay SY $50.00 $60.00 24 2221 Sawcut Pavement L.F. $ 8.00 $9.60 Remove and Replace or Install New Std. Manhole, 25 3 301 Up to 8' Depth, with All Joints & Connections (Pre- EACH $4,500.00 $5,400.00 Cast Concrete or Fiberglass) Install Shallow Manhole, Less than 5' Depth, With 26 3 °01 All Joints & Connections (Pre -Cast Concrete or EACH $3,500.00 $4,200.00 Fiberglass Extra Depth for New or Replacement Std. Manhole, 27 Over 8 Feet Depth (Pre -Cast Concrete or V.F. $250.00 $300.00 33001 Fiberglass) 28 2555 Adjust/Reset Manhole with Existing Frame and EACH $500.00 $600.00 Cover Up to One Foot 29 2555 Adjust/Reset Manhole with New Frame and Cover EACH $700.00 $840.00 Up to One Foot (Detail H-11 and H-60) 30 2555 Adjust/Reset Manhole in Excess of One Foot V.F. $500.00 $600.00 (Detail H-57 and H-58) Reconnect Service Connection by Excavation 31 2534 Including Cleanouts to Liner, Complete, All Sizes, EACH $600.00 $720.00 All Depths 32 502 Minor Traffic Control (Signs, Barricades, etc.), EACH $250.00 $300.00 When Approved by Engineer 33 502 Major Traffic Control (Signs, Barricades, etc.), EACH $ 2,000.00 $2,400.00 When Approved by Engineer 34 502 Flagmen (Uniformed Officer), When Approved by HR $55.00 $66.00 Engineer 35 502 Certified Flagmen, When Approved by Engineer HR $33.00 $39.60 36 402 Trench Excavation Protection (Up to 15' Depth) L.F. $5.00 $6.00 37 402 Trench Excavation Protection (Over 15' Depth) L.F. $300.00 $360.00 38 1540 6"x6" Pump Installation, Operation, and HR $55.00 $66.00 Maintenance 350' Maximum (Min. 3 hours) 39 1578 Well Point Dewatering Setup When Approved by EACH $7,000.00 $8,400.00 Engineer 40 1578 Well Point Dewatering Operation When Approved L.F. $35.00 $42.00 by Engineer 41 817 Cement Stabilized Sand, 1.64 TONS/CY TON $38.00 $45.60 42 2221 Removal of Cement Stabilized Sand CY $135.00 $162.00 43 Extra Concrete, 5000 PSI NR CY $500.00 $600.00 44 - Weekend Premium CREW $600.00 $720.00 Bid Table Continued Page 6 Bid No:TF0419-28 B. MOBILIZATION AND ALLOWANCE M Spec Description, Unit ;Unit Price Nd Factor in Total No Ref Included.' 1 - Unforeseen Work as Directed by Owner ALLOW $10,000.00 $10,000.00 Mobilization, including Payment Bond, 2 - Performance Bond, Insurance, and Moving LS $12,500.00 $12,500.00 Equipment to Project Sites TOTAL FOR ABOVE FOR T -CONSTRUCTION LLC: $80,782.92