Loading...
HomeMy WebLinkAbout892-OBDATE: March 18, 2019 TO: Planning Commission and City Council FROM: Chris Boone, Director of Planning and Community Development SUBJECT: Consider a request for sidewalk waiver. FILE: 892 -OB STAFF REPORT Soutex Surveyors & Engineers is requesting a waiver to the sidewalk requirement for property located across from 8015 Old Voth Road. The applicant states that sidewalks would create an economic hardship, impacting the developer's ability to move forward with the project, as the ditch would need to be filled with reinforced concrete pipe and inlets. This item has been reviewed by Engineering, and they have no objection to the request. The request is unique in that the property is quite narrow and has a long right-of-way frontage. The sidewalk could potentially be used by school children, as development increases along RFD Road, for access Roy Guess Elementary. However, pedestrians would first need to walk down RFD Road's narrow right-of-way (bordered by deep ditches). Next they would need to cross Old Voth Road to access the sidewalk, and cross Old Voth Road a second time to reach the school. Conversely, the property to the north installed all required sidewalks. Exhibits are attached. TBPE Firm No. F-5755 T13PLS Firm No. 10123800 LA EF.0005711 ors Drive TE Port Arthur, Texas 77642 SURVEYORS&ENOINEUS Office (409) 983.2004 February 7,J01S Chris Boone Planning /& Community Development Director City ofBeaumont P.0.Box 3827 8U1Main, Suite 210 Beaumont, TX777Ol Re: Old VothRoad Sidewalk Wavier Request My client is requesting sidewalk wavier along Old Voth Road. The subject property ioaslender triangle shaped property between the feeder road and Old Voth Road (Across from Stones Crying Out Ministry — 8001 Old Voth Road). Old VothRoad isopen ditch. There isnot enough physical room toplace" askdexva|kvvithopen ditches. Our opinion of probable, cost to fill in the ditch with reinforced concrete pipe and property spaced inlets is $40,000,00. This would create an economic hardship, impacting the Developer's ability tomove forward with the project, For the Firm, m hell, PE, RPLS