Loading...
HomeMy WebLinkAboutORD 35-CC:fj 5 e _ VIM s- AN ORDINANCE PROVIDING FOR THE INSTALLATION, CONSTRUCTION, EXISTENCE, USE, OPERATION, AND MAINTENANCE OF -HIGHWAY TRAFFIC SIGNALS) AT THE INTERSECTIONS) SHOWN ON EXHIBIT NO. 1, ATTACHED HERETO AND MADE A PART -HEREOF, IN THE CITY OF nt .......... .... ............. TEXAS, AND AUTHORIZING THE MAYOR OF THE CITY TO EXECUTE, AND THE CITY SECRETARY TO AFFIX THE CORPORATE SEAL AND ATTEST THE SAME, A CERTAIN CONTRACT BETWEEN THE CITY AND THE STATE OF TEXAS PROVIDING FOR: THE INSTALLATION, CONSTRUCTION, EXISTENCE, USE, OPERATION, AND MAINTENANCE OF SAID HIGHWAY TRAFFIC SIGNAL(S); PAYMENT, BY THE STATE OF TEXAS, OF THE INSTALLATION AND CONSTRUCTION COSTS; PAYMENT BY THE CITY OF THE COST OF OPERATING AND MAINTAINING THE HIGHWAY TRAFFIC SIGNAL(S) AND ALL THE POWER COST FOR OPERATING SAID HIGHWAY TRAFFIC SIGNAL(S); CHANGES IN THE DESIGN OF OPERATION AND TIMING OF THE HIGHWAY TRAFFIC SIGNALS) AND REMOVING ANY PART OF THE HIGHWAY TRAFFIC SIGNAL(S); RETURN TO THE STATE OF ANY AND ALL PARTS OF SAID TRAFFIC SIGNAL INSTALLATIONS) REMOVED BY THE CITY; POLICE ENFORCE- MENT BY THE CITY REQUIRED FOR SECURING OBEDIENCE TO THE HIGHWAY TRAFFIC SIGNAL(S); PROTECTIONrOF°TIE<=BTI�fi::0 t?...TEXA �AGAti�xNS' ATE`.:+I)ANIAGES> AND °PENSES`k-INCb1V1VECTOV'•H Al Y' ChA-IM •OR' SUIT `THEREFOR.;.' A_N1D `D ChARING AN EMERGENCY' AND PROVIDING THAT THIS ORDINANCE SHALL BE EFFECTIVE FROM AND AFTER ITS PASSAGE. WHEREAS, the public convenience, safety, and necessity require that the highway traffic signal(s) be installed at the intersection(s) shown on Exhibit No. 1, attached hereto sinc� the unprotected intersection(s) would constitute a potential danger and a serious inconvenience to the public which are urgently required to be remedied and that the only practical remedy is that of installing the highway traffic signal(s) as herein provided; and WHEREAS, the State of Texas has made it known to the City that it will: (1) furnish the necessary funds for the actual construction, (2) prepare plans and Ordinance (Traffic Signal'- Expressway Type E-1) -l- Form D-18-3 11-28-56 specifications, (3) install said highway traffic signal(s), and (4) supervise con- struction, provided the City will: (1) approve the plans, specifications, and location of said highway traffic signal(s), (2) operate and maintain the signal(s), (3) pay all power costs for operating the signal(s), (4) obtain written approval of the State Highway Engineer before making any changes in the design of operation and timing of the signal(s) or before removing any part of the installation(s), (5) return any and all parts of said highway traffic signal installation(s) to the State of Texas should they be removed by the City for any reason other than for installation on a State or Federal numbered highway route at a location approved by the State of Texas, and (6) be responsible for the police enforcement required for securing obedience to the highway traffic signal(s). x1 csz awe ocoa'3�z NOWYTHEREFORE, BE IT ORDAINED BY TEE CITY COUNCIL: Section 1. That since the public convenience, safety, and necessity require it, highway traffic signal(s) be constructed and provided at the intersec- tion(s) shown on Exhibit No. 1, attached hereto, in the City of .... .}� a ............. ............................ Texas. Section 2. That the State of Texas be and is hereby authorized to con- struct said highway traffic signal(s) at the location(s) and in the manner shown Ordinance (Traffic Signal - Expressway Type E-1) -2- Form D-18-3 11-28-56 on the plans and described in the specifications attached hereto, marked "Exhibit A," and made a part hereof in all respects, Brie - lA.'.xU''kl�.a"TY`+.r.'il�`rc`L7.il.'"J:'�.'il.'.+v7�'���.::LS(:�.5:)`Y.M-ctiH--17.LL�S-l"�`i_7.'P.i�",11CLe���.�i��+Gd1LL:'�.5�� lr i�l.✓x�,.s-l'l��l! �Sj�ii'.Ztl".Ll mfoanWvmh»d nmag,=, damna=1i� =55-I ia" 2 h �"e�s e�"��"ta-==s Xg=i C—ff `d ettol'; ya"coneiat ee o sad�fi%gira�y:'afina=(J &rgg°ees'o a ss�%me eceens�'e g 1� va-spar"• �c'y"�`t�ier��o�<�'or� at�ie=Bpii�:po'�e�yaiid:��s�3all=�i�fg requesteel min :-wr-��i:iig��'e=��-�a-t�' �o�' Texa=s�``so��o�'�`oy�io'I��y�re'I'"i��re�=��ie-'-��ate=Hof-�"�Z'•e�cas"�r-om'``=�d.�f�i�"cT�a�g°�fr"h'��s'ame ah�ere�`y _;+, •• •4°l i°4t+�a!'e�•'•ner're 1'F r^pt-ottpv r. It r+,r :•, oath e» we -w r. r, r. �>v7"n.-w+^r•-.-..�.vtse ye .+w w.rYi t _..c .}rv.'t "1:`:a.� sC F- e: 4 -RT4RNTZIK7Ze Ordinance (Traffic Signal - Expressway Type E-1) -3- Form B-18-3 11-28-56 64 signal(s). Section 2. That the City will operate and maintain the signal(s). ho Section A. That the City will pay all power costs for operating the Section R. That the City will obtain written approval of the State Highway Engineer before making any changes in the design of operation and timing of the signal(s) or before removing any part of the highway traffic signal installation(s). 6 �. Section 9. That the City will return any and all parts of said highway traffic signal installation(s) to the State of Texas should they be removed by the City for any reason other than for installation on a State or Federal numbered highway route at a location approved by the State of Texas. T Section Ij. That the City will be responsible for the police enforcement required for securing obedience to the highway traffic signal(s). as Section -W. That the Mayor be and is hereby authorized to execute for and on behalf of the City an Agreement and Contract with the State of Texas in accordance with and for the purpose of darrying out the terms and provisions of this Ordinance, in the form attached hereto, made a part hereof, and marked Clefk "Exhibit B." The City Spy is hereby directed to attest the Agreement and Contract and to affix the proper seal of the City thereto. Seciion 1'l�:�PMaor'the�'19 ir ng"�rgite'di'rr +��,P. M,?-r. •*+r�a;�p.r�a i'�-dR1,1' e"'' �ro..a.. ...• .v ��e.. fipv.-•wo2', ' +.y'.x, y"Lw.," ^4.T."�' +r ".T`.rP'S: +"SC°T q"57".n ����a3��eu'�i-13c'�nee�s-say>Ha'`�"-�he �wor� -� er-ein prov�de�d -c-aiie'`d �..�....-,r.. Rr. � v-tr-a �r+� �t-v'u'�r �-s:,r° .. ,. ...s�T• ; • .. ^�°'%'x"�r.'S",°`�'�,� .r.•�yi "®,"' r,,�. �s"r�.z" e'r�^�; out�prc� l�a�w2�h �xp�di�b-n; a�'�''��i��t•@crri ra;ct ai'�red �s1�3�be�'i�e�`2�a.�te-i Ordinance (Traffic Signal - Expressway Type E-1) -4- Form D-18-3 11-28-56 • , 5-1 �- f s-1 1.9590 •+��t��s�iis.r�+•gip t I40yor i Ordinance (Traffic Signal - Expressway Type E-1) -5- Form D-18-3 11-28-56 35 0 EXHIBIT NO.'l LOCATION OF INTERSECTION(S) CC 0 0 SIGNALS SIGNALS —TO HOUSTON COLLEGE ST' 0 \IJ 0 0 X W < z 0 i-I 0 0: Lintercection 1011. 10 1'arot and 1,70.,310 Froat-agm VznaOo with U.Se 90 (Colleco �,;t-) Ordinance (Traffic Signal Expressway Type E-1) -7- Form D-18-3 11-28-56 STATE OF TEXAS COUNTY OF TRAVIS This AGREEMENT, made this .... day of...t:7 ::..... , 19. by and between the State of Texas, hereinafter called the "State," Party of the ^. 3J7. �. ; 3f3 fi ;uc).1 First Part; and the City of ,,.,.,•• County, Texas, acting by and through its duly authorized officers under an Ordinance passed J. the .... I R ..... day of .... ,.�........ , 19.-X.. , hereinafter called the "City," Party of the Second Part: W I T N E S S E T H: WHEREAS, the City has authorized the installation of highway traffic t 1.a signal(s) by Ordinance passed on the ....13.. day of ,:,. Y- at the intersection(s) shown on Exhibit No. 21 attached hereto and made a part hereof, in the City; and WHEREAS, the State has made it known to the City that it will: (1) furnish the necessary funds for the actual construction,(2) prepare plans and specifications, (3) install said highway traffic signal(s), and (4) supervise construction, provided the City will: (1) approve the plans, specifications, and location of said highway traffic signal(s), (2) operate and maintain the signal(s), (3) pay all power costs for operating the signal(s), (4) obtain written approval of the State.Highway Engineer before making any changes in the design of operation and timing of the signal(s) or before removing any part of the insta.11ation(s), (5) return any and all parts of said highway traffic signal installation(s) to the State should they be removed by the City for any reason Agreement (Traffic Signal - Expressway Type E-1) Form D-18-4 11-28-56 M other than for installation on a State or Federal numbered highway route at a location approved by the State, (6) be responsible for the police enforcement required for securing obedience to the highway traffic signal(s), a.1 riablic�a3�s;;.c amagese��e71;?�� A G R E E M E N T: NOW, therefore, in consideration of the premises and of the mutual covenants and agreements of the parties hereto to be by them respectively kept and performed, as hereinafter set forth,.it is agreed as follows: is'b..�":��'�LsY'�ti1^.'hiL ��'4iU�'�ftl;i�i�1r41,kNi�i�'�la�••�^i%�i1itNl��^111��FL•/:i+�til.�1-''�s+��rV't7F121i'll`lTvs•�i ilt''�'�e�fY�'"1�3����� �e �:�:".:"�'`Z;�;r�l'i� .:d�te ��$!��'��1��'d'�'��L�,`�a fd��.]%5`�]' `C.}�'�,�E.'�5; �1:�.?1.�•'��'����1"6i5-�f$I�y.�Kd��i.3�C'�&'`�,�S�y d , 8 narnmann2aemn g L4-S:L�x`s.i4-7.1�'.I�s��i�de.'i3; �Zi l:�?a•L'1L'�-+��LidJ.e a�e`g�Al�^.LLtl.•m'G�.�e:.S.,�,Sa�`�i��h-s'SIl"Y.-�.�Fs lm�i�'15��.�i���#ai'�'���P coa�'c�.s`��on��'�` ��`ee� a�a�'T��xpens�-s�zi�•an��'i��.srf"'�=�u"�,,��.an��9== ,IOzs'=s�sa3�ugr�;aeeaystKi'etara'ar�e i�'�s.�'a�.�i�"'�r�xi���de������������e� f��i��y�oper•azt'5on;.�a�i��d��"h'�f"-���I The State will furnish the necessary funds for the actual construction, Agreement (Traffic Signal -'Expressway Type E-1) -2- Form D-18-4 11-28-56 s cc prepare plans and specifications, install said highway traffic signal(s), and super- vise construction. 2. % The City will operate and maintain the highway traffic signal(s) upon completion of the installation(s) by the State. 4. The City will pay all power costs for operating the signal(s). 4. 5�. The City will obtain written approval of the State Highway Engineer before making any changes in the design of operation and timing of the signal(s) or before removing any part of the installation(s). 5.6 :9. The City will return any and all parts of said highway traffic signal installation(s) to the State should they be removed by the City for any reason other than for installation on a State or Federal numbered highway route at a location approved by the State. 6. �. The City will be responsible for the police enforcement required for securing obedience to the highway traffic signal(s). $. It is understood -and agreed by and between the parties hereto that the City recognizes that the public convenience, safety, and necessity require the construction of the highway traffic signal(s) as herein provided and has consented to the construction of the highway traffic signal(s) hereinabove named by the approval of the location and manner of construction as shown on plans and described in specifications attached hereto, marked "Exhibit A," and made a part hereof, L!. 9. In the event the terms of this Agreement are in conflict with the provisions of any other existing Agreements and/or Contracts between the City and Agreement (Traffic Signal - Expressway Type E-1) -3- Form D-18-4 11-28-56 the State, this Agreement shall take precedence over the other Agreements and/or Contracts. All other provisions of said existing Agreements and/or Contracts not in conflict with this Agreement shall remain in full force and effect. Agreement (Traffic Signal - Expressway Type E-1) -4- Form D-18-4 11-28-56 3s cC IN TESTIMONY WHEREOF, the parties.hereto have caused these presents to be executed in triplicate on the day above stated. ATTEST: x�t rye. Y. City Ci rk& - - - APPROVED AS TO FORM: Assistant Attorney General By Mayor THE STATE OF TEXAS �4�' Certified as being executed for the purpose and'effect of activating and/or carrying out the orders, established policies, or work pro- grams heretofore approved and authorized by the State Highway Commission: By / 61 )d4) a�' Chief Engineer of Maintenance (V/ Operations RECOMMENDED FOR APPROVAL: Revised 9-13-57 Agreement (Traffic Signal - Expressway Type E-1) -5- District Engineer Engineer of Traffic Form D-18-4 11-28-56 �M 135 OIL 5'- J,- I qS--C[ EXHIBIT NO. 2 LOCATION OF INTERSECTION(S) K SIGNALS SIGNALS COLLEGE ST TO HOUSTON 0 0 0 z 0 ir U- 0 W ir U- cl) W Cn W W1 hitersect-4on 10110 10 Rozads leith V,0030 90 kN1011OF"p St,) in B.--a-un-ont Agreement (Traffic Signal - Expressway Type E-1) -6- Form D-18-4 11-28-56 Cad-, 3!�C-c . e�3—a- ,2--O Sq C O M M I S S I O N H E RE R T C. P E•T R Y, J R., CHAIRMAN C. F.. HAWN TEXAS HIGHWAY DEPARTMENT / HAL WOODWARD 1 / Beaumont, Texas March 23, 1960 Control 28-7&1.3 I.H.. 10 (N-S Expressway) East and West Frontage Roads with College Street (U.S. 90)in Beaumont Jefferson County District 20 Mr. James T. Garrard City Manager City of Beaumont Beaumont, Texas Dear Mr. Garrard: STATE HIGHWAY ENGINEER D. C. GREER IN REPLY REFER TO FILE NO. Attached hereto please find the City's copy of fully executed traffic signal ordinance and agreement covering the above subject installation. We will send .you a copy of the final plans for this project when construction is complete. JH : errij cc: Traffic D-18 0 Very truly ours, f W. W. E. Simmons District Engineer l ,55CC INTER -OFFICE MEMORANDUM CITY OF BEAUMONT, TEXAS Date: May 111 1959 To: Mrs. Willie J. Brockman, City Manager From: George E. Murphy, City Attorney Subject: COMMENT Attached is ordinance authorizing execution of contract between the Highway Department and the City cover- ing signal and maintenance agreement for signals at Street and I.H. 10 Frontage Roads. I have approved the ordinance and the contract as to form and have dated the ordinance for passage tomorrow. One copy of the agreement is being retained in my files, the other two are to be returned to the Stateafter execution. Mr. Simmons' letter of May 8th addressed to you is being returned herewith. GEM: h encl. Je rg E. Murp C'ty Attorney Vic(, �scc C O M M I S S I O N HERBERT C. PET R Y, J R., CHAIRMAN C. F . HAWN HAL W O O D W A R D TEXAS HIGHWAY DEPARTMENT Beaumont, Texas May 81 1959 Mrs. Willie Je Brockman City Manager City of Beaumont City Hall Beaumont, Texas Subject: Proposed Signal Installation at College Street and I.H. 10 Frontage Roads Dear Mrs. Brockman: STATE HIGHWAY ENGINEER D. C. GREER IN REPLY REFER TO FILE NO. The plans tracings for the above subject project have been approved by our Austin Office and returned to us for review and signing by the Mayor and City Engineer of Beaumont. These plans tracings are being submitted to Mr. Chriswell for his review in behalf of the City of Beaumont. It will be necessary for the City and State to enter into a standard signal and maintenance agreement (three copies attached) for this installation, similar to the agreement now in force for .maintenance of the signals at llth Street and I.He 10 Frontage Roads. If the City of Beaumont approves the plans as submitted, it is requested that the plans and maintenance agreement be submitted to the City Council for action at their next regular meeting on Tuesday, May 12, 1959. Your attention is again called to the necessity for removal of the City Uater line under the east approach to the intersection, in order to allow placement of all detectors on that approach. Yours very truly, W. E. Simmons District Engineer J10:gd cc: Traffic cc: C. A. Chriswell (Plans Tracings Attached) cc: E.,R. Young Enclosure: 3 Copies Traffic Signal Ordinance and.Agreement D May 3.5, 1959 - Mr. W. E. Simmors .. District Exgineer . State,, kghway Department P.C. Box 3190 Beaumont, Texas . Dear Sir; Eno iosead herewith are three certified copied of .a' Ordinance adopted, by the City Cauncil of the City of Desunont. in ,regular' session on 14ay .12, - ? 959, . authorizing execution -of an- egreement 'between the City of Beaumont, and the State of ' Texds for installation of traffic. sjg?aals `at the iirtersection of, Interstate Higheray ?G on eat ark rest 'r©ntage roods with . U..S. 90.:... Also' enclose -I ALS cate copies of the agreement, all exeeute'd loy the proper city -Officials.. These domments are 'being.x:larsinitted -to you for further handli;.' Lrvi,-,S 'Wiry tr-a }i, i Jas. T..Garrard . . City clerk JTG: em Enclosures "� 1