HomeMy WebLinkAboutRES 17-125RESOLUTION NO. 17-125 WHEREAS, on December 8, 2015, the City Council of the City of Beaumont, Texas, adopted Resolution No. 15-278 approving the award of a contract to Marsh Waterproofing, Inc., of Vidor, Texas, in the amount of $297,420.00 for the Tyrrell Historical Library Exterior Facade, Masonry, Roof Repairs and Restoration Project; and, WHEREAS, on May 10, 2016, the City Council of the City of Beaumont, Texas, adopted Resolution No. 16-085 approving Change Order No. 1, in the amount of $90,000.00, to perform 100% tuck pointing of the masonry mortar joints in lieu of 5,000 linear feet included in the original contract, thereby increasing the total contract amount to $387,420.00; and, WHEREAS, on November 1, 2016, the City Council of the City of Beaumont, Texas, adopted Resolution No. 16-214 approving Change Order No. 2, in the amount of $15,525.00, is required to make the repairs necessary to replace rotten wood on the large stain glass window frame and casing located on the north side of the building; to remove, re -align and install window stops at three exterior steel framed protective windows; and, to install two additional steel mullions to each window frame to facilitate the installation of odd shaped glass panels, thereby increasing the total contract amount to $402,945.00; and, WHEREAS, on March 10, 2017, the City Manager executed Change Order No. 3 in the amount of ($1,800.00) for the reduction in the scope of work for the copper caps and stain glass repairs, thereby decreasing the total contract amount to $401,145.00; and, WHEREAS, on March 21, 2017, the City Council of the City of Beaumont, Texas, adopted Change Order No. 4, in the amount of $20,245.75, to repair approximately 450 lineal feet of copper flashing and roofing felts located at the valleys on the upper stone locations behind the gable parapet walls to prevent water intrusion on the interior wall surfaces and causing damage to the plaster finishes, thereby increasing the total contract amount to $421,390.75; and, WHEREAS, the project has been inspected by the Facilities Maintenance Department and found to be complete in accordance with the provisions and terms set forth in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the Tyrrell Historical Library Exterior Facade, Masonry, Roof Repairs and Restoration Project be and the same is hereby found to be complete in accordance with the terms of the contract and is accepted; and, BE IT FURTHER RESOLVED THAT the City Manager is hereby authorized to make final payment in the amount of $28,346.58 to Marsh Waterproofing, Inc., of Vidor, Texas. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 11th day of July, 2017. look .., d -",A"- 4/r - ayor Becky Ames -