Loading...
HomeMy WebLinkAboutRES 17-124RESOLUTION NO. 17- 124 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute Amendment No. 2 to the Local Transportation Project Advanced Funding Agreement with the Texas Department of Transportation (TxDOT) for the Dowlen Road Extension Project, which defines the scope of work, constructing a roadway overlay and sidewalks at various locations on Dowlen Road from US 69 south to 1,300 feet north of US 90; and, the construction of and extension of several left and right turn lanes on Dowlen Road within these limits. The amendment is substantially in the form attached hereto as Exhibit "A" and made a part hereof for all purposes. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 20th day of June, 2017. STATE OF TEXAS § COUNTY OF TRAVIS § CSJ # 0920-38-189 District # 20 - BMT Code Chart 64 # 03200 Project: Dowlen Road Extension Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.: 20.205 Not Research and Development ADVANCE FUNDING AGREEMENT AMENDMENT #2 THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of Transportation, called the State, and the City of Beaumont, acting by and through duly authorized officials, called the Local Government. WITNESSETH WHEREAS, the State and the Local Government executed a contract on the 14th of June 2007 to effectuate their agreement to construct a new location roadway; and, WHEREAS, the State and the Local Government executed Amendment No. 1 on the 8th day of March 2017 to amend the project's scope of work; and WHEREAS, it has become necessary to amend that contract; NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties, the State and the Local Government do agree as follows: AGREEMENT 1. Description of Amended Items With this amendment, the scope and budget for the project is changed. Attachment B-1 Project Location Map, is deleted in its entirety and is replaced with Attachment B-2 Project Location Map, which is attached to and made part of this amendment. The limits for the project have been changed to those shown on the location map. Attachment C-1 Project Budget Estimate and Source of Funds, is deleted in its entirety and is replaced with Attachment C-2 Project Budget Estimate and Source of Funds, which is attached to and made part of this amendment. The budget is increased from $3,616,904 to $3,626,917 as a result of changes in the scope. Article 4 of Amendment #1 to the original agreement is deleted in its entirety and is replaced with the following: EXHIBIT "A" AFA= CSJ # 0920-38-189 District # 20 - BMT Code Chart 64 # 03200 Project: Dowlen Road Extension Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.: 20.205 Not Research and Development 4. Scope of Work The scope of work for this LPAFA is described as the construction of a roadway overlay and sidewalks at various locations on Dowlen Road from US 69 south to 1,300 feet north of US 90. The project will also include the construction of and extension of several left and right turn lanes on Dowlen Road within these limits. The overall project limits are shown on Attachment B-2. All other provisions of the original contract are unchanged and remain in full force and effect. 2. Signatory Warranty Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity represented. THIS AGREEMENT IS EXECUTED by the State and the Local Government in duplicate. THE LOCAL GOVERNMENT Signature Typed or Printed Name Title Date THE STATE OF TEXAS Kenneth Stewart Director of Contract Services Texas Department of Transportation Date AFA AFA Amend Page 2 of 2 Revised 03/23/16 CSJ # 0920-38-189 District # 20 - BMT Code Chart 64 # 03200 Project: Dowlen Road Extension Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.: 20.205 Not Research and Development ATTACHMENT B-2 PROJECT LOCATION MAP '✓' 4• t .r y � »..� ` / 9 G�... ,..,. 1.35' }1,+�',+ t' 42 Begin P "ect w f F Odom H CON fir J� 14 41'- - r— Y 4i sl 3 f i fi° c , t U' P gtc'` p k {a f✓Y �' �_J_»� I j GS{ 36 jo pra —W MOM J, 'Welling— ;t Ug: s'l.1,Cne; Gh �. _ � : i➢�i��aZ sit i.---} � .. ,..---.d-1�----.`�..��rV I_tr61i- l.a' t''.'-"Gz Phelan PlkO s v, fl. .�/h�� 3: f 7"'an , ii.�iv +n'�-5 s ti �.''`'� j - y—# Y�+3t p 4 t ii - , r�-6t�. i �Si S.t7�,aErYrtz �„}j`-'f' ((4fjfj1'i 81. L?,,.dnyL,,n '®ef'3 iv IL, ft!" IF-[ remll ice[ f es"E'd _.._y. k. 1.. t1-Nvatr :g a Projectpam a 3 } f`re lxl€tt a AFA—AFA Amend Page 1 of 1 Revised 03/23/16 CSJ # 0920-38-189 District # 20 - BMT Code Chart 64 # 03200 Project: Dowlen Road Extension Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.: 20.205 Not Research and Development ATTACHMENT C-2 PROJECT BUDGET ESTIMATE AND SOURCE OF FUNDS Costs will be allocated based on 80% Federal funding and 20% Local Government funding until the federal funding reaches the maximum obligated amount. The Local Government will then be responsible for 100% of the costs. Description Total Estimated Cost Federal Participation tate Participation Local Participation % Cost % Cost %. Cost,, Engineering (by Local Government) $270,000 80% $216,000 0% $0 20% $54,000 Construction (by Local Government) 3,146,098 80% $2,516,878 0% $0 20% $629,220 Subtotal $3,416,098 1 1$2,7132,878 0 $083,220 Environmental Direct State Costs $2,500 80% $2,000 0% $0 0% $500 Right of Way Direct State Costs 10 0% $0 0% $0 100% $10 Engineering Direct State Costs $12,500 80% $10,000 0% $0 20% $2,500 Utility Direct State Costs 10 0% $0 0% $0 100% $10 Construction Direct State Costs (0.95%) $30,000 80% $24,000 0% $0 20% $6,000 Indirect State Costs (5.27%) 165,799 0% $0 100% $165,799 0% 0 TOTAL $3,626,917 $2,768,878 $165,799 $692,240 Initial payment by the Local Government to the State: $57,020 ($3,020 + $54,0001 Payment by the Local Government to the State before construction: $6,000 Estimated total payment by the Local Government to the State: $63,020. This is an estimate. The final amount of Local Government participation will be based on actual costs. $54,000 has already been paid by the Local Government to the State under the original agreement as part of the local share when the Engineering was the State's responsibility. AFA—AFA Amend Page 1 of 1 Revised 03/23/16