Loading...
HomeMy WebLinkAboutRES 16-203RESOLUTION NO. 16-203 WHEREAS, bids were solicited for a contract for the construction of Northwest Parkway Project (from Major Drive to Parkdale Mall Loop); and, WHEREAS, MK Constructors, of Vidor, Texas, submitted the lowest bid in the amount of $12,109,789.38 in the unit amounts shown on Exhibit "A," attached hereto; and, WHEREAS, City Council is of the opinion that the bid submitted by MK Constructors, of Vidor, Texas, should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT- THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the bid submitted by MK Constructors, of Vidor, Texas, in the amount of $12,109,789.38 for a contract for the Northwest Parkway Project (from Major Drive to Parkdale Mall Loop) be accepted by the City of Beaumont; and, BE IT FURTHER RESOLVED THAT the City Manager be and he is hereby authorized to execute a contract with MK Constructors, of Vidor, Texas, for the purposes described herein. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 18th day of October, 2016. -Ilayor Becky AYnes - PROJECT NUMBER: PWO516-13 CITY OF BEAUMONT BID TABULATION CONSTRUCTION OF NORTHWEST PARKWAY (FROM MAJOR DRIVE TO PARKDALE MALL LOOP) PAVEMENT & DRAINAGE ITEMS BIDS RECEIVED: SEPTEMBER 22, 2016 MK CONSTRUCTORS BRYSTAR CONTRACTING, APAC ALLCO L&L GENERAL CONTRACTORS Item No. Item Code Description Estimated uaoti Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price * Total ; 100 2002 PREPARING ROW 103.8 STA S 560.00 S 58 128.00 S 3,000.00 $ 311 400.00 S 4300.00 S 446 340.00 $ 2 150.00 $ 223 170.00 $ 516.59 $ 53 621.55 104 2009 REMOVING CONC PRAP 364 Sy $ 16.00 $ 5,824.00 $ 10.00 $ 3,640.00 $ 8.25 $ 3,003.00 $ 15.00 $ 5,460.00 $ 8.03 $ 2,924.08 104 2015 REMOVING CONC (SIDEWALKS 197 SY $ 14.00 $ 2758.00 $ 7.00 $ 1379.00 $ 7.50 S 1477.50 S 7.00 S 1379.00 $ 8.17 $ 1608.74 104 2022 REMOVING CONC CURB AND GUTTER 329 LF $ 14.00 $ 4,606.00 $ 6.00 $ 1.974.00 $ 12.50 S 4,112.50' $ 18.00 $ 5,922.00 $ 29.26 $ 9,626.54 110 2001 EXCAVATION ROADWAY 47763 CY $ 7.50 S 358 222.50 $ 10.00 $ 477 630.00 $ 10.99 $ 524 915.37 S 15.00 $ 716 445.00 $ 13.99 $ 668 80.79 110 2002 EXCAVATION CHANNEL 20740 CY $ 8.00 $ 165 920.00 $ 10.00 $ 207 400.00 $ 13.00 $ 269 620.00 $ 11.00 $ 228 140.00 $ 20.80 S 431 416.89 132 2002 EMBANKMENT FINAL DENS CON A 7628 CY $ 10.00 $ 76 280.00 $ 19.00 $ 144 932.00 $ 19.00 $ 144 932.00 $ 30.00 $ 228 840.00 $ 12.64 $ 96 379.78 162 2002 IBLOCK SODDING 6396 Sy $ 4.50 $ 28 782.00 $ 3.50 $ 22 386.00 $ 4 10 S 26 223.60 S 6.50 S 41 574.00 $ 5.32 $ 34,02632- 4026.72164 164 1 2003 IBROADCAST SEED (PERM) (RURAL) CLAY 57581 Sy--- $ 0.15 $ 8,637.15 $ 0.10 $ 5,758.10 $ 0.12 $ 6,909.72 $ 0.34 S 19 577.54 $ 0.16 $ 9,189.93 164 1 2009 IBROADCAST SEED (TEMP) ARM 14395 Sy $ 0.15 S 2,159.25 $ 0.10 $ 1,439.50 $ 0.12 $ 1,727.40 $ 0.34 $ 4,894.30 $ 0.16 $ 2,297.44 164 1 2011 IBROADCAST SEED (TEMP) COOL 14395 Sy $ 0.15 $ 2,159.25 $ 0.10 $ 1,439.50 $ 0.12 $ 1,727.40 $ 0.34 S 4,894.30 $ 0.16 S 2,297.44 164 1 2024 ICELL FBR MLCH SEED PERM RURAL CLAY 4 AC $ 1,400.00 $ 5,600.00 $ 1,700.00 $ 6.800.00 $ 1.220.00 $ 4,1380,O0 $ 1,700.00 $ 6,800.00 S 1,596.00 $ 6,384.00 2001 VEGETATIVE WATERING 703 MG $ 11.00 $ 7,733.00 $ 52.00 $ 36 556.00 $ 18.00 $ 1 654.00 $ 66.00 S 46 398.00 $ 46.55 $ 32 724.65 2006 LIME TRT EXSTMATL 6" 70979 Sy $ 3.00 $ 212937.00 $ 3.50 $ 248426.50 S 2.75 S 195192.25 S 6.00 S 425874.00 S 5.59 S 396488.69 2043 LIME HYD COM OR K SLURRY 1149.7 TON $ 194.00 S 223 041.80 S 190.00 $ 218 443.00 S 195.00 $ 224191.50 S 175.00 $ 201 197.50 $ 256.03 S 294 351.94 K276 2170 CEM TRT PLNT MX CLL AGR 2 6" 67595 SY $ 12.00 $ 811 140.00 $ 16.00 $ 1 081 520.00 $ 15.00 $ 1 013 925.00 $ 20.00 $ I 51 900.00 $ 19.66 $ 1 328 741.95 2170 CEM TRT PLNT MX CLL AGR 2 12 502 SY $ 30.00 $ 15060.00 S 35.00 S 17 570.00 $ 40.50 S 20 331.00 S 56.00 $ 28 112.00 $ 73.75 S 37 021.75 2104 D -GR HMA METH TY -D SAC -B PG64-22 3780 TON $ 120.00 S 453600.00 $ 120.00 $ 453600.00 $ 85.00 $ 321300.00 $ 121.00 S 457380.00 $ 146.30 $ 553 014.00 2018 CURB CrYPE 11 36511 LF $ 4.00 S 146,G44.00 $ 3.70 $ 135 090.70 S 10.00 $ 365 110.00 $ 4.00 $ 146 044.00 S 4.63 $ 168 987.51 360 1 2026 CONC PAV JOINT REINF IO" 64587 Sy $ 54.00 $ 3,487,698.00 S 59.00 $ 3,810,633.00 $ 51.50 S 3 326 30.50 $ 56.00 S 3,616,872.00 $ 62.91 S 4,063,103.58 360 •+*• CURB PE B 751 LF $ 6.00 $ 4,506.00 S 8.50 $ 6,383.50 S 22.00 S 16 522.00 $ 1500 $ 11 265.00 $ 33.25 $ 24 970.75 400 2001 STRUCT EXCAV 16271 CY $ 8.00 $ 130 168.00 $ 3.00 $ 48 813.00 $ 5.45 S 88 676.95 S 001 $ 162.71 $ 6.16 S 100195.19 400 2005 CEM STABIL BKFL 7633.4 CY $ 55.00 $ 419 837.00 S 42.00 $ 320 602.80 $ 46.50 $ 354 953.10 $ 57.00 $ 435 103.80 $ 52.67 $ 402 035.91 402 2001 TRENCH EXCAVATION PROTECTION 7024 LF S 1.00 $ 7,024.00 S 3.00 $ 21 072.00 $ 9.10 $ 63 918.40 $ 0.01 $ 70.24 $ 1.33 S 9,341.92 416 2002 DRILL SHAFT 24 IN 424 LF S 166.00 $ 70 84.00 $ 110.00 $ 46 640.00 S 355.00 S 150 520.00 S 255.00 S 108 120.00 S 332.50 $ 140 980.00 416 2032 DRILL SHAFT SIG POLE 36 IN 235 LF $ 211.00 $ 49 585.00 S 560.00 $ 131 600.00 $ 570.00 $ 133 950.00 $ 307.00 $ 72 145.00 S 399.00 S 93 765.00 432 2035 RIPRAP (CONC)(6 IN 416.8 CY $ 421.00 $ 175 472.80 $ 500.00 $ 208 400.00 $ 480.93 $ 200 451.62 $ 360.00 $ 150 048.00 $ 545.30 $ 227 81.04 462 2002 CONC BOX CULV 3 FT X 3 300 LF $ 150.00 $ 45 000.00 $ 180.00 $ 54 000.00 $ 135.00 $ 40 500.00 S 130.00 $ 39 000.00 S 154.71 $ 46 411.68 462 2004 CONC BOX CULV 4 FT X 3 350 LF $ 178.00 $ 62 300.00 $ 210.00 $ 73 500.00 $ 155.00 $ 54 50.00 $ 148.00 $ 51 800.00 $ 177.63 $ 62.17 .1 462 2007 CONC BOX CULV 5 FT X 3 440 LF $ 246.00 S 108,24000 $ 250.00 $ 110 000.00 $ 195.00 $ 85 800.00 S 185.00 S $1,400.00 $ 221.37 S 97 400.69 462 2010 CONC BOX CULV 6 FT X 3 264 LF S 267.00 S 70 488.00 $ 270.00 $ 71 280.00 S 235.00 $ 62 040.00 $ 211.00 $ 55 704.00 $ 271.04 $ 71 554.74 462 2011 CONC BOX CULV (6 FT X 4 288 LF $ 290.00 $ 83 520.00 $ 285.00 $ 82 080.00 S 251.00 $ 72 288.00 $ 227.00 $ 65 376.00 $ 290.07 $ 83 541.02 462 2025 CONC BOX CULV (9 FT X 6 520 LF $ 472.00 S 245 440.00 $ 455.00 $ 236 600.00 S 388.00 $ 201 760.00 $ 331.00 $ 172 120.00 $ 448.69 S 233 318.18 462 2061 CONC BOX CULV 9 FT X 3 FT) 131 LF $ 421.00 $ 55 151.00 $ 395.00 $ 51 745.00 $ 383.00 $ 50 173.00 $ 366.00 $ 47 946.00 $ 442.37 $ 57 950.64 464 2003 RC PIPE CL 111) 18 IN 2322 LF $ 48.00 $ 111 456.00 $ 45.00 $ 104 490.00 $ 42.00 S 97 524.00 $ 51.00 $ 118 422.00 S 48.36 $ 112 89.13 464 2005 RC PIPE CL 111 24 IN 2107 LF $ 51.00 $ 107 457.00 S 48.00 $ 101 136.00 $ 32.00 S 67,424. $ 53.00 S 111 671.00 $ 35.76 $ 75 354.12 464 2006 RC PIPE CL III)(27 IN) 356 LF $ 79.00 S 28 124.00 $ 65.00 $ 23 140,00 S 63.00 $ 22 428.00 $ 60.00 S 21 360.00 $ 72.56 $ 25 833.07 464 2007 RC PIPE CL 111)(30 1N) 1869 LF $ 79.00 $ 147 651.00 $ 65.00 $ 121 485.00 $ 63.50 $ 118 681.50 $ 67.00 $ 125 223.00 $ 72.56 $ 135 623.61 464 2009 RC PIPE CL III 36 IN 1329 LF $ 94.00 S 124 926.00 $ 80.00 $ 106 320.00 $ 79.00 $ 104 991.00 S 78.00 $ 103 662.00 $ 91.21 $ 121 19.95 464 2010 RC PIPE CL III 42 IN 715 LF $ 113.00 $ 80 795.00 S 98.00 $ 70 070.00 S 91.00 $ 65 065.00 $ 92.00 $ 65 780.00 $ 104.91 $ 75 010.94 464 2011 RC PIPE CL BI 48 IN 872 LF $ 140.00 $ 122 080.00 $ 120.00 $ 104 640.00 $ 116.00 $ 101 152.00 $ 107.00 $ 93 304.00 S 133.78 S 116 66026 464 2012 RC PIPE CL 111)(54 IN -.637 LF $ 183.00 $ 116 571.00 $ 150.00 S 95;550.00 S 149.00 $ 94 913.00 $ 134.00 S 85 358100 S, • 171.97 $ 109 544.25 464 2013 RC PIPE CL 111 60 IN 40 LF $ 205.00 $ 8,200.00 $ 200.00 $ 8,000.00 $ 202.00 $ 8,080.00 $ 152.00 $ 6,080.00 _ $ 233.53 $ 9,341.39 465 2001 INLET COMPL C 69 EA $ 4,144.00 $ 285 936.00 $ 3,900.00 $ 269 100.00 $ 6,075.00 $ 419 175.00 $ 4,190.00 $ 289 110.00 $ 7,022.40 $ 484 545.60 465 2002 INLET COMPL)(TY E) 68 EA $ 1,252.00 $ 85 136.00 $ 1,280.00 $ 87 040.00 $ 1,645.00 $ 11 1860.00 $ 1620.00 $ 110 160.00 S 1901.90 $ 129 329.20 465 2006 MANH COMPL)(JUNCT BOX)(TY M 10 EA $ 6 39.00 $ 63 390.00 $ 4,800.00 $ 48 000.00 $ 11 008.00 $ 110 080.00 $ 5,163.00 S 51 630.00 $ 1 728.10 $ 127 81.00 465 2081 INLET COMPL GRATE 1 14 EA $ 3.063.00 S 42 882.00 $ 2,700.00 $ 37 800.00 S 3,165.00 $ 44 310.00 $ 3,000.00 $ 42 000.00 $ 3,657.50 $ 51 05.00 466 2049 WINGWALL PW HW=5 4 EA $ 18 100.00 $ 72 400.00 $ 16 000.00 $ 64 000.00 $ 34 600.00 $ 138 400.00 $ 21 340.00 $ 85 360.00 S 39 900.00 $ 159 600.00 466 2050 WINGWALL PW HW=6 2 EA $ 22 500.00 $ 45 000.00 $ 20 000.00 $ 40 000.00 $ 40 300.00 $ 80 600.00 $ 25 720.00 $ 51 440.00 $ 46 550.00 $ 93 100.00 466 2052 WINGWALL PW HW=8 2 EA S 34 900.00 $ 69 800.00 $ 32 000.00 $ 64 000.00 $ 50 700.00 $ 101400.00 $ 42 372.00 $ 84 744.00 S 58 520,00 $ 117 040.00 466 2129 HEADWALL CH -PW -O DIA= 36 IN) 2 EA $ 14 850.00 1 $ 29 700.00 $ 12 000.00 $ 24 000.00 $ 29 900.00 $ 59 800.00 $ 16 570.00 $ 33 140.00 S 34 580.00 $ 69160.00 466 2133 HEADWALL CH -PW -O (DIA= 60 N I EA $ 24 37.00 1 $ 24 237.00 $ 23 000.00 S 23 000.00 $ 50 700.00 S 50 700.00 $ 28 680.00 $ 28 680.00 S 58 520.00 $ 58 520.00 496 2004 REMOV STR S 1 EA $ 555.00 1 $ 555.00 $ 300.00 S 300.00 $ 400.00 $ 400.00 $ 270.00 $ 270.00 $ 458.85 $ 458.85 4% 2007 REMOV STR PIPE 329 LF$ 25.00 $ 8,225.00 $ 8.00 $ 2,632.00 S 6.50 $ 2,138.50 $ 6.00 $ 1,974.00 $ 7.32 $ 2,406.64 500 2001 MOBILIZATION LS S 298 399.53 IS 798399.53 $ 700 000.00 $ 700 000.00 $ 977,D00.00 $ 977 000.00 $ 893 000.00 1 S 893 000.00 $ 550 000.00 $ 550 000.00 op m x w PROJECT NUMBER: PWO516-13 CITY OF BEAUMONT BID TABULATION CONSTRUCTION OF NORTHWEST PARKWAY (FROM MAJOR DRIVE TO PARKDALE MALL LOOP) PAVEMENT & DRAINAGE ITEMS BIDS RECEIVED: SEPTEMBER 22, 2016 MK CONSTRUCTORS BRYSTAR CONTRACTING, INC APAC ALLCO L&L GENERAL CONTRACTORS Item No. Item Description Code P Estimated O uantitv Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 502 2001 BARRICADES SIGNS AND TRAFFIC HANDLING 18 MO $ 1,204.00 $ 21,672.06' $ 800.00 $ 14 400.00 $ 1,100.00 $ 19 800.00 $ 6,500,00 $ 117 000.00 $ 1,331.77 $ 23 971.84 506 2004 ROCK FILTER DAMS STALL TY 4 85 LF $ 56.00 $ 4,760.00 $ 45.00 $ 3,825.00 $ 51.00 $ 4,335.00 $ 45.00 S 3,825.00 $ 66.50 S 5,652.50 506 2009 ROCK FILTER DAMS REMOVE 85 LF $ 9.00 $ 765.00 S 10.00 $ 850.00 $ 8.15 $ 692.75 $ 10.00 $ 850.00 S 10.64 $ 904.40 506 2024 BACKHOE WORK EROSION & SEDM CON 72 HR $ 65.00 $ 4.680.00 $ 82.00 $ 5,904.00 $ 175.00 $ 12 600.00 IS 90.00 $ 6,480.00 $ 140.75 S 10134.28 506 2034 TEMPORARY SEDIMENT CONTROL FENCE 3500 LF $ 4.00 S 14 000.00 $ 3.00 $ 10 500.00 $ 5.75 $ 20 125.00 $ 5.00 $ 17 500.00 $ 5.32 $ 18 620.00 508 1 2002 lCONSTRUCTING DETOURS 3397 SY $ 50.00 $ 169 850.00 $ 38.00 $ 129 086.00 $ 40.00 $ 135 880.00 $ 55.00 $ 186 835.00 $ 79.21 $ 269 092.68 2016 TURNOUTS CONC 3597 SY S 83.00 S 298 551.00 $ 62.00 $ 223 014.00 $ 80.00 $ 287 760.00 S 70.00 $ 251 790.00 $ 96.65 $ 347 654.01 2005 CURB RAMPS 1 8 EA S 2,000.00 $ 16 000.00 $ 1,400,00 $ 11 200.00 $ 1,525.00 $ 12 200.00 $ 1 200.00 S 9,600.00 $ 1,463.00 $ 11 704.00 2010 CURB RAMPS 7 20 EA $ 2100.00 $ 42 000.00 $ 1,200.00 $ 24 000.00 $ 1,725.00 $ 34 500.00 $ 1 300.00 S 26 000.00 $ 1 463.00 $ 2%260.00 N6,I 2024 CONC SIDEWALK 5" 6324 SY $ 38.00 S 240 312.00 S 41.00 $ 259 284.00 $ 59.00 $ 373 116.00 $ 45.00 $ 284 580.00 $ 50.17 $ 317 59.90 2002 CONC MEDIAN 2887 SY $ 40.00 S 115 480.00 S 33.00 S 95 271.00 $ 75.00 $ 216 525.00 $ 51.00 $ 147 237.00 $ 53.09 $ 153 281.22 2001 WIRE FENCE A 2920 LF $ 7.00 $ 20 440.00 S 6.00 $ 17 520.00 $ 12.10 S 35 332.00 $ 6.00 $ 17 520.00 $ 6.37 $ 18,602.44_ 2005 GATE I 4 EA S 555.00 $ 2.220.00 S 300.00 S 1200.00 $ 1.224.00 S 4,896.00 $ 660.00 $ 2,640.00 $ 1995.00 $ 7,980.00 2018 CONDI PVC) (SCHD 40 2" 20124 LF $ 4.00 $ 80 496.00 1 $ 6.00 S 120 744.00 $ 18.75 $ 377 325.00 S 13.50 $ 271 674.00 $ 17.29 S 347 943.96 618 2022 CONDI PVC) (SCHD 40 3" 610 LF S 7.00 $ 4,270.00 S 12.00 S 7,320.00 $ 22.10 S 13 481.00 $ 18.50 $ 11 285.00 S 23.94 $ 14 603.40 618 2023 CONDI PVC) (SCHD 40 3 BORE 1110 LF $ 22.00 $ 24 420.00 $ 23.00 $ 25 530.00 -i-37 50 S 41 625.00 S 36.00 S 39 960.00 $ 46.55 $ 51 670.50 618 2024 CONDI PVC) (SCHD 40 4") 65 LF $ 33.00 $ 2,145.00 $ 56.00 S 3,640.00 $ 32.50 $ 2,112.50 $ 26.00 $ 1690.00 $ 33.25 S 2,161.25 624 2008 GROUND BOX TY A 122311) W/APRON 47 EA $ 748.00 $ 35 156.00 S 500.00 $ 23 500.00 $ 2,890.00 $ 135 830.00 $ 1,650.00 S 77 550.00 $ 2128.00 $ 100 016.00 624 2012 GROUND BOX TY C 162911) W/APRON 4 EA $ 886.00 $ 3,544.00 $ 550.00 $ 2,200.00 $ 3,935.00 $ 15 740.00 $ 1,850.00 $ 7,400.00 $ 2,394.00 $ 9.576.00 644 2048 INS SM RD SN SUP&AM TY TWT(I) UAP 9 EA $ 338.00 $ 3,042.00 $ 350.00 $ 3.150.00 $ 310.00 $ 2,790.00 $ 320.00 $ 2,880.00 S 405.65 S 3,650.85 662 2067 WK 2N PAV MRK REMOV 4" SLD 4080 LF $ 1.00 $ 080.00 $ 0.90 $ 3,672.00 $ 0.81 $ 3,304.80 $ 0.88 $ 3,590.40 $ 1.17 $ 4,775.23 662 2099 WK 2N PAV MRK REMOV 4" SLD 4080 LF $ 1.00 $ 4.080.00 $ 0.90 $ 3,672.00 $ 0.81 $ 3,304.80 $ 0.88 $ 3,590.40 $ 1.06 $ 4,341.12 666 2003 REFL PAV MRK TY I 4" (BRKX 1 OOMIL 4400 LF $ 1.00 $ 4,400.00 $ 0.90 S 3,960.00 $ 0.46 S 2,024.00 $ 0.49 $ 2,156.00 $ 1.06 $ 4,681.60 666 2006 REFL PAV MRK TY 1 4" DO IOOMIL) 300 LF S 2.00 $ 600.00 $ 1.70 S 510.00 S 1.02 S 306.00 $ 1.10 S 330.00 S 2.00 $ 598.50 666 2012 REFL PAV MRK TY I 4" SLD IOOMIL 3538 LF S 1.00 S 3,538.00 S 1.00 $ 3,538.00 $ 0.51 $ 1,804.38 $ 0.55 $ 1,945.90 $ 1.13 $ 3,999.71 666 2024 REFL PAV MRK TY I 6" SLD (IOOMIL) 4929 LF $ 1.00 $ 4,929.00 $ 1.10 S 5,421.90 S 1.02 $ 5,027.58 $ 1.10 $ 5,421.90 $ 1.46 S 7,211.13 666 2054 REFL, PAV MRK TYI(ARROW) 100MIL) 4 EA $ 139.00 $ 556.00 $ 135.00 $ 540.00 S 127.00 $ 508.00 S 130.00 S 520.00 S 166.25 $ 665.00 666 2111 REFL PAV MRK TY I 4" SLD IOOMIL) 2921 LF $ 1.00 $ 2,921.00 $ 1.00 $ 2,921.00 $ 0.52 $ 1,51&92 $ 0.55 $ 1,606.55 $ 1.25 S 3,651.83 666 2132 REFL PAV MRK TY I 24" SLD IOOMIL) 130 LF $ 7.00 S 910.00 S 7.00 $ 910.00 $ 6.10 $ 793.00 S 7.00 S 910.00 $ 9.98 $ 1,296.75 666 2189 PAVEMENT SEALER 4" 7290 LF $ 0.20 $ 1,458.00 S 0.17 $ 1,239.30 $ 0.16 $ 1,166.40 $ 0.17 $ 1,239.30 S 0.24 $ 1,745.23 666 2190 PAVEMENT SEALER 6" 4843 LF $ 0.40 $ 1937.20 $ 0.33 $ 1,598.19 $ 0.31 S 1501.33 $ 0.33 S 1,598.19 $ 0.44 $ 2125.59 666 2219 PAVEMENT SEALER (ARROW)4 EA $ 28.00 $ 112.00 $ 27.00 $ 108.00 S 25.50 $ 102.00 $ 27.00 $ 108.00 $ 36.58 $ 146.30 668 2105 PREFAB PAV MRK TY C 24" SLD 201 LF S 16.00 S 3,216.00 $ 15,50 S 3,115.50 S 14.25 $ 2,864.25 $ 15.00 $ 3.015.00 $ 21.95 $ 4,410.95 668 2106 PREFAB PAV MRK TY C ARROW 37 EA $ 194.00 $ 7.178.00 $ 190.00 S 7,030.00 $ 178.00 $ 6,586.00 $ 185.00 $ 6,945.00 $ 399.00 $ 14 763.00 668 2116 PREFAB PAV MRK TY C ORD 37 EA $ 255.00 $ 9.435.00 $ 250.00 $ 9,250.00 S 232.00 $ 8,584.00 $ 240.00 $ 8.890.00 $ 498.75 $ 18 453.75 678 2001 PAV SURF PREP FOR MRK 4" 5590 LF $ 0.10 $ 559.00 $ 0.11 $ 614.90 $ 0.10 $ 559.00 $ 0.20 $ 1.118.00 $ 0.15 $ 817.82 678 2002 PAV SURF PREP FOR MRK 6" 4843 LF $ 0.30 $ 1,452.90 $ 0.28 $ 1,356.04 $ 0.26 $ 1,259.18 S 0.30 $ 1,452.90 $ 0.37 $ 1,803.53 678 2006 PAV SURF PREP FOR MRK 24" 201 LF $ 1.00 $ 201.00 $ 0.80 S 160.80 $ 0.76 $ 152.76 S 0.80 S 160.80 $ 1.10 $ 221.88 678 2007 PAV SURF PREP FOR MRK ARROW 36 EA $ 28.00 $ 1,008.00 $ 27.00 $ 972.00 $ 25.10 $ 903.60 $ 27.00 $ 972.00 $ 36.58 $ 1,316.70 678 2018 PAV SURF PREP FOR MRK ORD 35 EA $ 44.00 $ 1,540.00 $ 43.00 $ 1,505.00 $ 40.50 S 1,417.50 $ 44.00 $ 1 540.00 $ 58.52 $ 2,048.20 686 2041 INS TRF SIG PL AM(S)1 ARM 40' LUM 7 EA S 14 600.00 $ 102 200.00 S 9,000.00 S 63 000.00 $ 20 000.00 $ 140 000.00 $ 11 000.00 $ 77 000.00 $ 13 566.00 S 94 962.00 686 2045 INS TRF SIG PL AMS 1 ARM 44' LUM 1 _ EA $ 15 550.00 $ 15 550.00 $ 9.20000 S 9 200.00 $ 21 500.00 $ 21,500.00 $ 12 000.00 $ 12 000.00 $ 14 696.50 $` 14b96.50 5049 2001 BIODGRD EROSION CONTROL LOGS 8" DIA 680 LF $ 11.00 $ 71480.00 $ 10.00 $ 6,800.W $ 10.10 $ 6,868.00 $ 9.00 $ 6 120.00 $ 6.65 $ 4,522.00 • 9999 • DUAL WALL POLYPROPYLENE (PP) PIPE 18 IN 120 LF S 39.00 $ 4,690.00 $ 35.00 $ 4,200.00 $ 44.50 $ 5,340.00 $ 44.00 $ 5 280.00 $ 42.68 S 5,121.56 9999 •••• DUAL WALL POLYPROPYLENE (PP) PIPE (24 IN) 120 LF S 44.00 S 5,280.00 S 42.00 S 5,040.00 $ 52.50 $ 6,300.00 $ 50.00 $ 6000.00 $ 51.83 S 6,219.61 PAVING AND DRAINAGE GRAND TOTAL S 10,769,470.38 $ 11,867,909.23 S 13,237,088.56 S 13,091,198.73 S 14,415,264.67 " * The values In the Total column do not reflect the calculated total when multiplying the Estimated Quantity times the Unit Price. CITY OF BEAUMONT BID TABULATION CONSTRUCTION OF NORTHWEST PARKWAY (FROM MAJOR DRIVE TO PARKDALE MALL LOOP) PROJECT NUMBER: PW0516-13 PAVEMENT & DRAINAGE ITEMS BIDS RECEIVED: SEPTEMBER 22, 2016 MK CONSTRUCTORS BRYSTAR CONTRACTING, APAC ALLCO L&L GENERAL Total Unit Price CONTRACTORS Item Item Description No. Code Estimated oanti Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price '! Total 360 1 2003 CONC PVMT (CONT REINF-CACP) (10") 1 64587 SY $ 63.00 1 $ 4,068,981.00 $ 74.00 1 $ 4,779,438.00 $ 59.00 $ 3,810,633.00 S 69.00 $ 4,456,503.00 $ 66.02 $ 4,264,111.24 DUAL WALL POLYPROPYLENE PP PIPE 18 IN CRCP ALTERNATE BID ITEM TOTAL $ 4,068,981.00 $ 4,779,438.00 $ 3,810,633.00 S 4,456,503.00 S 4,264,111.24 " Item No. Item CodeDescription Estimated n , Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price * Total 9999 '••• DUAL WALL POLYPROPYLENE PP PIPE 18 IN 2322 LF $ 41.00 S 95 202.00 $ 40.00 $ 92,880.00 $ 38.00 $ 88 36.00 $ 50.57 $ 117 423.54 $ 52.57 $ 122 078.92 9999 •••• DUAL WALL POLYPROPYLENE PP PIPE 24 IN 2107 LF $ 50.00 $ 105 50.00 $ 44.00 $ 9 708.00 $ 45.00 $ 94 815.00 $ 57.64 $ 121 447.48 $ 41.34 S 87 095.79 9999 •••+ DUAL WALL POLYPROPYLENE PP PIPE 27 IN 356 LF $ 72.00 $ 25 632.00 $ 57.00 $ 20 292.00 $ 58.00 $ 20 648.00 $ 68.61 $ 24,425.16 $ 71.73 $ 25 534.78 9999 ••+• DUAL WALL POLYPROPYLENE PP PIPE 30 IN) 1869 LF $ 72.00 S 134 568.00 $ 57.00 S 106 533.00 $ 58.00 $ 108 402.00 $ 70.41 $ 131 596.29 $ 84.27 $ 157 498.39 9999 •• DUAL WALL POLYPROPYLENE PP PIPE 36 IN) 1329 LF $ 75.00 $ 99 675.00 $ 66.00 $ 87 714.00 $ 85.00 $ 112 965.00 $ 74.29 S 98 731.41 S 87.58 $ 116 394.48 9999 +••• DUAL WALL POLYPROPYLENE PP PIPE 42 IN) 715 LF S 89.00 $ 63 635.00 $ 82.00 $ 58 630.00 $ 117.00 S 83,655.00 $ 87.13 $ 62 297.95 $ 110.79 S 79 214.14 9999 •••• DUAL WALL POLYPROPYLENE (PP) PIPE 48 IN) 872 LF S 115.00 $ 100 280.00 S 104.00 $ 90 688.00 $ 131.00 S 114,232.00 $ 102.98 $ 89,798.56 $ 130.21 $1 ]3 540.50 9999 • DUAL WALL POLYPROPYLENE PP PIPE 54 M) 637 LF $ 155.00 $ 98 735.00 $ 134.00 $ 85 358.00 1 $ 209.00 1 $ 133 133.00 1 $ 135.19 IS 86,116.03 1 $ 173.63 1 $ 110 603.27 9999 1 ••.. IDUAL WALL POLYPROPYLENE (PP) PIPE 60 IN) 40 LF IS 166.00 $ 6,640.00 IS 165.00 1 $ 6,600.00 1 $ 391.00 1 $ 15,640.00 $ 139.15 1 $ 5,566.00 $ 224.29 1 $ 8,971.65 DUAL WALL POLYPROPYLENE PIPE ALTERNATE BID ITEM TOTAL $ 729,717.00 S 641,403.00 $ 771,726.00 $ 7379402.42 $ 820,931.91 * The values in the Total column do not reflect the calculated total when multiplying the Estimated quantity times the Unit Price. CITY OF BEAUMONT BID TABULATION CONSTRUCTION OF NORTHWEST PARKWAY (FROM MAJOR DRIVE TO PARKDALE MALL LOOP) PROJECT NUMBER: PW0516-13 SANITARY SEWER & WATER ITEMS BIDS RECEIVED: SEPTEMBER 22, 2016 MK CONSTRUCTORS BRYSTAR CONTRACTING, INC. APAC ALLCO L&L GENERAL CONTRACTORS Ifem Dexri fioa Estimated No. P O'satity Unit Unit Prim Total Unit Price Total Unit Prim Total Unit Price Total Unit prim* Total SANITARY SEWER ITEMS I 6 -INCH SDR -26 PVC SANITARY SEWER 1379 LF $ 61.00 $ 84119.00 $ 65.00 $ 89 635.00 $ 79.00 S 108 941.00 $ 72.38 $ 99 812.02 S 91.30 $ 125 908.91 2 12 -INCH SDR -26 PVC SANITARY SEWER 3718 LF $ 36.00 $ 133 848.00 $ 50.00 $ 185 900.00 $ 61.00 $ 226 798.00 $ 75.83 S 281 935.94 $ 70.00 $ 260 252.19 3 15 -INCH SDR -26 PVC SANITARY SEWER 5242 LF $ 58.00 $ 304 036.00 $ 85.00 $ 445 570.00 $ 78.00 $ 408 876.00 $ 83.20 S 436 134.40 $ 90.13 $ 472 482.95 4 REMOVE & REPLACE 4' FIBERGLASS MH > IT 2 EA $ 17 900.00 $ 35 800.00 S 15,000.00 $ 30 000.00 S 13 300.00 $ 26,600-00 S 14 605.00 $ 29 10.00 S 15,329.21 $ 30 658.42 5 FURNISH & INSTALL 4' FIBERGLASS MH < 12' 20 EA S 4,700.00 S 94 000.00 S 4,000.00 S 80 000.00 $ 5,000.00 $ 100 000.00 $ 2,920.00 $ 58 400.00 S 5,775.54 S 115 510.77 6 FURNISH & INSTALL 4' FIBERGLASS MH > 12' 7 EA S 10 400.00 $ 72 800.00 $ 8,700.00 S 60 900.00 S 5,500.00 S 38 500.00 $ 4 112.00 S 28 784.00 S 6,286.80 S 44 007.63 7 TRENCH SAFETY PLAN 1 LS S 2,500.00 $ 2,500.00 S 1,500.00 S 1,500.00 $ 1,900.00 $ 1,900.00 $ 750.00 S 750.00 S 2,194.50 $ 2,194.50 8 TRENCH SAFETY SYSTEM 1 LS S 4,800.00 1 $ 4.800.00 $ 5.000.00 1 $ 5 000.00 S 23 500.00 $ 23 500.00 S 2.500.00 $ 2 500.00 $ 26 600.00 IS 26 600.00 DANA I AKY JL'WLK l I LMS FUFAL S 731,903.00 $ 89$,505.00 $ 935,115.00 $ 937,526.36 S 1,077,615.37 WATERLINE ITEMS 1 6 -INCH CLASS 150 C-900 PVC 104 LF Is 26.00 $ 2,704.00 S 36.00 $ 3,744.00 S 10.50 $ 1 092.00 S 35.00 $ 3,640.00 $ 11.72 $ 1,218.60 2 8 -INCH CLASS 150 C-900 PVC 335 LF $ 23.00 $ 7,705.00 S 24.00 $ 8,040.00 S 10.90 $ 3,651.50 $ 37.19 $ 12 458.65 S 12.38 S 4,148.07 3 10 -INCH CLASS 150 C-900 PVC 1496 LF $ 40.00 $ 59 840.00 S 37.00 $ 55 352.00 $ 15.00 $ 22 440.00 $ 39.08 S 58 463.68 $ 16.36 $ 24 473.06 4 12 -INCH CLASS 150 C-900 PVC 9200 LF $ 24.00 $ 220 800.00 $ 28.00 $ 257 600.00 $ 21.00 S 193 00.00 $ 41.81 S 384 652.00 $ 23.55 $ 216 699.56 5 FURNISH & INSTALL FIRE HYDRANT ASSEMBLY 38 EA $ 4,350.00 $ 165,30&00 $ 4 00.00 $ 163 400.00 $ 4,400.00 $ 167 00.00 $ 3,770.00 S 143 260.00 $ 4,975.77 $ 189 079.24 6 FURNISH & INSTALL 12" MJ TEE 2 EA $ 545.00 $ 1,090.00 $ 1,100.00 $ 2,200.00 S 890.00 $ 1780.00 S 475.00 $ 950.00 $ 1,027.92 $ 2,055.83 7 FURNISH & INSTALL 10"X 6" MJ REDUCER 12 EA $ 291.00 $ 3,492.00 S 420.00 $ 5,040.00 $ 325.00 S 3,900.00 S 175.00 S 2,100.00 $ 371.27 $ 4,455.23 8 FURNISH & INSTALL 12" X 8" MJ REDUCER 1 EA $ 532.00 1 S 532.00 S 480.00 S 480.00 $ 390.00 $ 390.00 $ 200.00 $ 200.00 S 449.58 S 449.58 9 IFURNISH & INSTALL 10" MJ 45 DEGREE BEND 20 EA $ 471.00 S 9,420.00 S 600.00 $ 12 000.00 $ 471.00 $ 9.420.00 $ 265.00 $ 5,300.00 S 543.65 S 10 873.02 10 FURNISH & INSTALL 12" MJ 45 DEGREE BEND 28 EA S 511.00 $ 14 08.00 S 700.00 $ 19 600.00 $ 565.00 $ 15,820.00 $ 300.00 S 8,400.00 S 651.91 S 18 53.56 11 FURNISH & INSTALL 12" MJ CROSS 1 EA $ 859.00 $ 859.00 $ 1,800.00 S 1,800.00 $ 1,260.00 $ U60.00 S 650.00 S 650.00 $ 1,445.16 S 1445.16 12 FURNISH & INSTALL 12"X 10" MJ REDUCER 12 EA S 337.00 S 4,044.00 $ 1,780.00 S 21 60.00 S 470.00 $ 5,640.00 S 300.00 $ 3,600.00 S 542.92 $ 6515.03 13 FURNISH &INSTALL TEMP. 2" FLUSH OUT 1 EA $ U47.00 $ 1,247.00 S 1,700.00 $ 1,700.00 S 748.00 $ 748.00 S 800.00 $ 800.00 $ 862.11 $ 862.11 14 FURNISH & INSTALL 6" GATE VALVE & BOX 12 EA $ 808.00 $ 9,696.00 $ 800.00 $ 9,600.00 S 793.00 S 9,516.00 S 790.00 $ 9,480.00 S 917.06 S 11,004.74 IS FURNISH & INSTALL 10" GATE VALVE & BOX 24 EA $ 1 676.00 S 40 24.00 S 1 850.00 S 44 400.00 S 1,580.00 S 37 920.00 S 1,535.00 $ 36 840.00 $ 1,822.09 $ 43 730.08 16 FURNISH & INSTALL 12" GATE VALVE & BOX 33 EA $ 2,035.00 S 67 155.00 $ 2 200.00 $72 600.00 S 1940.00 $ 64 020.00 S 1 920.00 S 63 360.00 S 2 240.84 S 73 947.63 a a /09,1J .JJ $ 609,210.50 * SANITARY SEWER& WATERLINE ITEMS GRAND TOTAL $ 1,340,319.00 $ 1,577,421.00 $ 1,473,112.50 ** $ 1,671,680.69 $ 1,686,825.87 PAVING & DRAINAGE ITEMS GRAND TOTAL $ 10,769,470.38 $ 11,867,909.23 $ 13,237,088.56 $ 13,091,198.73 $ 14,415,264.67 TOTAL BASE CONTRACT PRICE $ 12,109,789.38 $ 13,445,330.23 S 14,709,201.06 ** $ 149762,879.42 $ 16,102,090.54 Acknowledge Addenda 1 YES YES YES YES YES Acknowledge Addenda 2 YES YES YES YES YES Acknowledge Addenda 3 YES YES YES YES YES Bid Summary YES YES YES YES YES Bid Bond YES YES YES YES YES Corporate Resolution YES YES YES YES YES Information Required of Bidder YES YES YES YES YES Statement of City Charter Provision on Conflict of Interest YES YES YES YES YES Conflict of Interest Questionnaire YES YES YES YES YES Schedule C (MBE Participation) YES YES YES YES YES Insurance Verification Affidavit YES YES YES NO YES Electronic Copy of Bid Schedule Enclosed with Bid YES YES YES YES NO * The values in the Total column do not reflect the calculated total when multiplying the Estimated quantity times the Unit Price. * *The Sanitary Sewer & Waterline Items Grand Total does not match the amount Indicated In Section 0220 Bid Summary of the Contract. The Total Base Contract Price shown In this Bid Tabulation reflects the actual dollar amount written In Section 0220 of the Contract.