HomeMy WebLinkAboutRES 16-161RESOLUTION NO. 16-161 WHEREAS, on October 6, 2015, the City Council of the City of Beaumont, Texas, adopted Resolution No. 15-217 approving the award of a contract to Placo, LTD, of Lumberton, Texas, in the amount of $3,298,432.31 for the Sewer Plant -Clarifiers Rehabilitation Project; and, WHEREAS, on June 7, 2016, the City Council of the City of Beaumont, Texas, adopted Resolution No. 16-098 approving Change Order No. 1, in the amount of $48,612.20, to furnish and install new scum baffles for two (2) primary clarifier units and delete the coating of the existing scum baffles for two (2) primary clarifier units, thereby increasing the total contract amount to $3,347,044.51; and, WHEREAS, Change Order No. 2, in the amount of ($92,201.17), is necessary to revise the scope of the project to delete the lining of the 36 -inch influent piping; provide grout sealing of Primary Clarifier No. 2 Effluent Trough; allow for the removal and replacement of influent piping to two (2) Sludge Thickener Units; and, extend the contract time by thirty (30) calendar days, thereby decreasing the total contract amount to $3,254,843.34; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 2 for the additional work described above, thereby decreasing the contract amount by ($92,201.17) for a total contract amount of $3,254,843.34 for the Sewer Plant -Clarifiers Rehabilitation Project. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 6th day of September, 2016. AT;t - Mayor Pro Tem Robin Mouton - APPROVAL OF CONTRACT CHANGE CHANGE ORDER No. Two 2 DATE: August 8, 2016 PROJECT: City of Beaumont, Texas Wastewater Treatment Plant- Clarifier Rehabilitation Project OWNER: City ofBeaumont. Texas 801 Main Street Beaumont, Texas 77704 CONTRACTOR Placo, LTD 11939 Leatherw•ood Dr Lumberton. Texas 77657 TO THE OWNER: Approval of the following contract change is requested. Reason for Change: Revise scope of project to delete lining of 36" Influent Piping, Provide Grout Sealing of Clarifier Trough, and Replace adjacent Thictmener Influent Pipes ORIGINAL CONTRACT AMOUNT: $ 3.298.432.31 CHANGE ORDER No. 1 S 48612,20 TH1S CHANCE ORDER Description: Delete Bid Item 4 to rehabilitate 36" Concrete Pipe, 600 LF by CIPP methods Delete Bid Item 5 to provide Pre Construction Cleaning and Televising 600 LF of 36" Pipes, Delete Bid Item 7 to provide Post Construction Cleaning and Televising 600 LF of 36" Pipes, Famish and Install chemical grout sealing of 275 LF of Primary Clarifier No. 2 Effluent Trough, Remove and Replace influent piping to two (2) Sludge Thickener Units, including all piping, pipe supports, painting, labor and matierals TOTAL AMOUNT OF THIS CHANGE ORDER: TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: CONTRACT TIME Original Contract Time: 360 Change Order No. 1 60 This Change Order Request: Rain Days for January 2016 thur July 2016 above contract allowance 26 This Change Order Request: Regeust for additional work for Thickener and Primary Clarifier No. 2 30 Revised Contract Time per this Change Order 476 Net Change S (130,800.00) $ (14,400.00) S (10,200.00) S 34,140.63 S 29,058.20 S (92,201.17) S 3,254,943.34 CONDITION OF CHANGE: "Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order represents full compensation for all increases and decreases in the cost of, and the time required to perform the entire work under the Contract arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive, mutually agreed upon adjustment to the Contract, and that Contractor will waive all rights to file a claim on this Change Order after it is properly executed." Recommended by: Approved by: Accept bv: p` Schaumburg & Polk, Inc. City of Beaumont Placo, D Engineer Owner f Contr tot, Date: A t Ld Date: � .1 = f Date: r 1