Loading...
HomeMy WebLinkAboutSOG 600.01 NEW 3-2012_FH Work Orders600.01 — Creating & Processing Work Orders & Test Records Effective: 3/5/2012 Revised: Replaces: I. Guiding Philosophy Properly managing assets is vital to any organization. It is critical that each and every member foster principles of good stewardship, including effective management of resources. To this end we strive to efficiently and accurately document the purchase, distribution, care, maintenance, testing and disposal of department assets. II. Purpose The purpose of this policy is to define the process and responsibilities for creating maintenance and test records in Firehouse software that document asset receipt, distribution, checks, maintenance, testing and disposal. III. Goals The goals of this policy are to: A. Identify members responsible for creating, monitoring, and completing inventory maintenance/test records. B. Describe the information to be documented in maintenance/test records. C. Detail responsibilities for monitoring records and processing incomplete (scheduled) records. D. Describe actions to be taken if an asset record has not been created in Firehouse. IV. Definitions A. Generic Inventory — A general inventory record that is NOT specific to a single item. Examples include small hand tools, supplies, and replacement parts. B. Non -Generic Inventory — A specific inventory record that refers to a single item. Usually these items have models and serial numbers and should be tested, certified, calibrated, or maintained periodically. Examples include apparatus, ladders, PPE, fire hose, SCBA, appliances, office equipment, and communication equipment. C. Inventory Type — A general group that describes an inventory item. Inventory types are Apparatus, Consumable, Hose, Ladder, PPE, Pump, SCBA, and Other. This field is NOT customizable. D. Inventory Class — A defined group of inventory items. This field is customizable. E. Maintenance/Test Record — A set of data that describes actions that were taken or need to be taken with an inventory item. Maintenance/Test Records are linked to inventory items. F. Job Code — A code that describes the type of work that was done, or needs to be done on an inventory item. G. Work Order — A maintenance/test record for an inventory item that is usually not complete. An auto -generated number can be used for tracking or reference purposes. H. Notes — Firehouse memo field that is used to document the pertinent facts of an event, action, or need in narrative format. V. Processina and Retrievina Work Orders and Test Records A. Maintenance/test records should be entered by: 1. Staff members who discover a repair or maintenance need. 2. Staff members who test or certify inventory items. 3. Staff members who process inventory maintenance/test details from vendors. 4. Staff members responsible for scheduling equipment maintenance, testing or certification. B. Staff members responsible for entering maintenance/test records should: 1. Report the maintenance/test need to a supervisor immediately if the maintenance need is a safety issue or is a critical piece of inventory that is out of service. 2. Enter records into Firehouse within 24 hours of discovering a maintenance/test need for an inventory item. 3. Enter the appropriate date, start time, shift, station, job code, and priority code for the work done or to be done on the inventory item. 4. Enter the Staff ID for the person who is requesting work to be done and/or who completed the work. 5. Enter all appropriate information in the Details tab of the record. 6. Enter a sufficient narrative in the Notes tab to explain needs to be done or what was done to the inventory item. C. Inventory maintenance/test records should be regularly monitored by supervisory personnel responsible for managing programs that pertain to assets. The purpose of monitoring shall include, but is not limited to: 1. Insuring that repairs are completed in a satisfactory and timely manner. 2. Insuring that equipment test and certifications are in compliance with national and state standards. 3. Insuring that perishable assets are not out of date. 4. Insuring that inventory that has a life cycle established by the manufacturer, recognized standards, or state law, is not out of life cycle date. 5. Identifying inventory items to be scheduled for maintenance, testing, or calibration. D. In most cases, inventory maintenance/test records will be closed out (completed) by the Staff member who actually completed the maintenance, test or check of the inventory item. E. Program Managers, Branch Directors and Section Chiefs will complete (or insure proper completion/close out) of records for the following: 1. The Logistics Section Chief or desi ee for inspections and/or repairs completed internally by the Support Branch or by external providers (including, but not limited to, advanced PPE inspections, SOG 600.01 — Creating & Processing Work Orders & Test Records Page 2 of 3 tools/equipment repairs, facilities repairs by contractors or Building Services personnel.) 2. The PPE Program Manager or desi Yee for routine inspections and cleaning of personal protective equipment. 3. The Services Branch Director or desi nee for communications equipment such as radios, mobile data computers, and Knox key secure equipment. 4. The Fire Administrator or designee for office equipment, including office computers, fax machines, computer monitors, and printers. 5. The Fire Fleet Manager or designee for apparatus, fire pumps, and ladders. Program Managers in these areas share responsibility for proper completion/close out of records.) 6. The Medical Response Program Manager or designee for medical equipment. 7. The Hazmat Response Program Manager or designee for hazmat tools and equipment. 8. The Water Response Program Manager or designee for water response tools and equipment (shares responsibility with SCBA Program Manager for SCUBA equipment.) 9. The Technical Rescue Program Manager or designee for rescue tools and equipment. 10. The SCBA Maintenance & Testing Program Manager or designee for SCBA or SCUBA equipment, face pieces, and cylinders. 11. The Hose Maintenance & Testing Program Manager or designee for fire hose. 12. The _Hydrant Maintenance & Testing Program Manager or designee for fire hydrants. 13. The Health & Wellness Program Manager or designee for fitness equipment. F. In the event that an asset has not yet been entered into the Firehouse database, the person responsible for entering the work order or maintenance/test record shall email the following information to the Fire Administrator: 1. Asset make, model, and serial number. 2. Asset description. 3. Asset location. 4. Problems with asset or work that needs to be done. G. The Fire Administrator or designee shall enter the asset record into Firehouse and create the work order or maintenance/test record. SOG 600.01 — Creating & Processing Work Orders & Test Records Page 3 of 3