HomeMy WebLinkAboutRES 16-128RESOLUTION NO. 16-128 WHEREAS, on September 29, 2015, the City Council of the City of Beaumont, Texas adopted Resolution No. 15-211 approving the award of a contract to BDS Constructors, LLC d/b/a MK Constructors, of Vidor Texas, in the amount of $960,329 for the Goodhue Road Sanitary Sewer Project to provide for the installation of 1,470 linear feet of new 12 -inch diameter sanitary sewer line on Goodhue Road along with all related appurtenances; and, WHEREAS, on February 9, 2016, the City Council of the City of Beaumont, Texas adopted Resolution No. 16-029 approving Change Order No. 1, in the amount of $225,529.50, to provide for the installation of the sanitary sewer line by directional drill method instead of open -cut excavation; provide for the cleaning and television inspection of the existing Calder interceptor line; rehabilitate and seal six (6) existing manholes between Goodhue Road and Caldwood Cutoff ditch; and, replace the existing damaged sanitary sewer siphon under the Caldwood Cutoff ditch, thereby increasing the contract amount to $1,185,858.50; and, WHEREAS, Change Order No. 2, in the amount of ($7,868.50), is required to correct the total cost for cleaning of sanitary sewer pipe, deduct unused items related to the sealing of manholes and lines, and provide for six (6) stainless steel manhole rain stoppers, thereby reducing the contract amount to $1,177,990.00; and WHEREAS, the project has been inspected by the Water Utilities Division and found to be complete in accordance with the provisions and terms set forth in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 1 for additional work described above, thereby decreasing the contract amount by ($7,868.50) for a total contract amount of $1,177,990.00 for the Goodhue Road Sanitary Sewer Project; and, BE IT FURTHER RESOLVED THAT the Goodhue Road Sanitary Sewer Project be and the same is hereby accepted; and, BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make final payment in the amount of $60,894.12 to BDS Constructors, LLC d/b/a MK Constructors, of Vidor, Texas. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 26th day of July, 2016.