Loading...
HomeMy WebLinkAboutRES 16-095RESOLUTION NO. 16-095 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in Deerfield Phase IV Subdivision have been completed as follows: and, Street • Somerville Circle approximately 131 feet extension east of existing Somerville Circle to and including the cul-de-sac. • Bonner Drive approximately 201 feet extension north of existing Bonner Drive to Chappell Hill Drive. • Chappell Hill Drive approximately 223 feet east to 3 -OM 4P markers end of pavement. Street Maintenance, Storm Sewer, Water and Sanitary Sewer Improvements • Deerfield Phase IV Subdivision, right-of-way only. WHEREAS, the developers of said improvements desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department has determined that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT- THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the above -referenced street, storm sewer, water and sanitary sewer improvements in Fairfield Phase IV Subdivision, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights -of -way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 24th day of May, 2016. F6 7 !,... ,w0 -.: _ f.