HomeMy WebLinkAboutRES 16-095RESOLUTION NO. 16-095
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in Deerfield Phase IV Subdivision have been completed as
follows:
and,
Street
• Somerville Circle approximately 131 feet extension east of existing
Somerville Circle to and including the cul-de-sac.
• Bonner Drive approximately 201 feet extension north of existing Bonner
Drive to Chappell Hill Drive.
• Chappell Hill Drive approximately 223 feet east to 3 -OM 4P markers end
of pavement.
Street Maintenance, Storm Sewer, Water and Sanitary Sewer Improvements
• Deerfield Phase IV Subdivision, right-of-way only.
WHEREAS, the developers of said improvements desire to have these
improvements accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department has
determined that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT-
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the above -referenced street, storm sewer, water and sanitary sewer
improvements in Fairfield Phase IV Subdivision, with the exception of streetlights, are
hereby accepted by the City of Beaumont and shall be continuously maintained by the
City contingent upon filing of the final plat, complete with filings of dedication of all
rights -of -way and easements required on the preliminary and final plats and installation
of the streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 24th day of
May, 2016.
F6 7
!,... ,w0
-.: _ f.