Loading...
HomeMy WebLinkAboutRES 15-295RESOLUTION NO. 15-295 WHEREAS, on July 26, 2012, the Texas Department of Transportation (TxDOT) entered into an agreement with Tradeco Infrastructura, Inc. in the amount of $11,284,746.71 for the Concord Road Project; and, WHEREAS, on July 9, 2013, the City Council of the City of Beaumont, Texas, passed Resolution No. 13-147 approving Change Order No. 1, in the amount of $88,965.21, including $12,085.19 for Engineering and Contingency charges, for modifications to the water, sanitary sewer, storm sewer, and conduit lines for the project; and, WHEREAS, on June 10, 2015, Tradeco Infrastructura, Inc. delivered a voluntary letter of default to TxDOT abandoning and terminating the contract; and, WHEREAS, the surety bond held by American Home Assurance Company is acting in its capacity as the surety for Tradeco and has chosen Texas Sterling Construction Co. as the completion contractor; and, WHEREAS, TxDOT has requested Change Order Nos. 2, 3, 4 and 5, in the total amount of $37,798.99, including $5,134.81 for Engineering and Contingency charges, for the removal of water oak trees along SH 105; temporary drainage on SH 105 to aid the installation of water and sanitary sewer improvements; adjustment of sanitary manholes to match final paving; and, removal of three (3) existing sanitary manholes, respectively, thereby increasing the contract amount to $11,411,510.91; and, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute an acknowledgment of Change Order Nos. 2, 3, 4 and 5 for additional work described above, thereby increasing the contract amount by $37,798.99 for a total contract amount of $11,411,510.91 for the Concord Road Project. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 15th day of December, 2015. r� ��UI►iFp��1�11 IV - yor Becky Ames -