Loading...
HomeMy WebLinkAboutRES 15-070RESOLUTION NO.15-070 WHEREAS, construction of the streets, storm sewer, water and sanitary sewer improvements constructed in West Commerce Parkway (formerly Washington Boulevard Park) Reconstruction have been completed as follows: ; and, Streets • West Commerce Parkway, formerly Washington Boulevard Park, approximately 249 feet to and including the cul-de-sac which had previously been abandoned and the reconstructed area of the existing West Commerce Parkway roadway approximately 194 feet to and including the cul-de-sac. Storm Sewer. Water and Sanitary Sewer Improvements • West Commerce Parkway, right-of-way only. WHEREAS, the developers of said street desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department has determined that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the above -referenced street, storm sewer, water and sanitary sewer improvements in West Commerce Parkway (Washington Boulevard Park) Reconstruction, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. 2015. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 14th day of April, Major Beck 'Ames -