Loading...
HomeMy WebLinkAboutPB 407.01C REVISED 1-2012PPPEEERRRFFFOOORRRMMMAAANNNCCCEEE BBBEEENNNCCCHHHMMMAAARRRKKKSSS 407.01C407.01C407.01C407.01C Forming Elements of a Bowline KnotForming Elements of a Bowline KnotForming Elements of a Bowline KnotForming Elements of a Bowline Knot Anne Huff,Anne Huff,Anne Huff,Anne Huff, Fire ChiefFire ChiefFire ChiefFire Chief Beaumont Fire-Rescue Services Discipline:Discipline:Discipline:Discipline: Ropes, Knots, & HitchesRopes, Knots, & HitchesRopes, Knots, & HitchesRopes, Knots, & Hitches Effective:Effective:Effective:Effective: 1/1/20011/1/20011/1/20011/1/2001 Revised:Revised:Revised:Revised: 1111/5/201/5/201/5/201/5/2012222 Replaces:Replaces:Replaces:Replaces: Firefighter Benchmark #39Firefighter Benchmark #39Firefighter Benchmark #39Firefighter Benchmark #39 I. I. I. I. ObjectiveObjectiveObjectiveObjective The firefighter shall demonstrate tying a bowline knot with a safety on a smoke ejector in preparation for hoisting. The firefighter shall select the type and length of rope which will be adequate to meet the provisions of this skill. The firefighter shall verbally identify the working, standing, and running sections of the rope. The firefighter shall accomplish the skill in four (4) minutes or less. II. II. II. II. Instructions Instructions Instructions Instructions –––– Procedures for Achieving the ObjectiveProcedures for Achieving the ObjectiveProcedures for Achieving the ObjectiveProcedures for Achieving the Objective You will select the type and length of rope which will be adequate to meet this skill. You will verbalize five (5) potential elements of rope degradation. You shall demonstrate tying a bowline knot with safety on a smoke ejector. I will primarily evaluate the finished product for accuracy by comparing the knot to reference materials. You will also verbally identify the working, standing, and running sections of the rope. You will have four (4) minutes to complete this skill. You will be required to complete the mandatory steps while performing this skill. The skill will begin on my instruction to start. The time will stop when all the identified steps have been accomplished and you put your hands in the air to signal that you have completed this skill. Do you understand these instructions? III. III. III. III. Examiner’s NoteExaminer’s NoteExaminer’s NoteExaminer’s Note The firefighter will not be allowed to review the performance steps at the time of testing. IV. IV. IV. IV. Preparation & EquipmentPreparation & EquipmentPreparation & EquipmentPreparation & Equipment A. Adequate length of rope (synthetic/natural) B. Smoke ejector C. The firefighter shall accomplish the skill wearing a helmet. V. V. V. V. Reference SourcesReference SourcesReference SourcesReference Sources D. TCFP, Performance Standards, Section 104-3.01, 4.01a, 5.01 E. NFPA, National Fire Protection Association 1001, 3-1.1.2, 3-5.3 F. IFSTA Essentials of Fire Fighting, 4th Edition, pages 151, 163. PB 407.01C – Forming Elements of a Bowline Knot Page 2 of 2 407.01C - Forming Elements of a Bowline Knot Discipline: Ropes, Knots, & Hitches Name: Officer #: Evaluator: Officer #: Date: Location: If the firefighter:If the firefighter:If the firefighter:If the firefighter: (No partial points given)(No partial points given)(No partial points given)(No partial points given) With a rope:With a rope:With a rope:With a rope: a) Inspects rope for damage and verbalizes at least 5 elements of rope degradation (elements could include: softness, crusty spots, stiffness, brittleness, nicks, cuts, dirt, mildew, heat sears or discoloration, fuzziness, mushy spots, sheath sliding, lumps and/or depressions.) ............... 1.0 _____ b) Correctly measures rope for desired size ................................................... 1.0 _____ c) Ties bowline knot on a smoke ejector in preparation for hoistingTies bowline knot on a smoke ejector in preparation for hoistingTies bowline knot on a smoke ejector in preparation for hoistingTies bowline knot on a smoke ejector in preparation for hoisting ................. P/FP/FP/FP/F _____ d) Ties safety to loop ................................................................................... 1.0 _____ e) Completes the skill in the allotted time ...................................................... 1.0 _____ Allotted time for this skill: 4 minutesAllotted time for this skill: 4 minutesAllotted time for this skill: 4 minutesAllotted time for this skill: 4 minutes Time:Time:Time:Time: ____________________________ minutesminutesminutesminutes ____________________________ secondssecondssecondsseconds • BolBolBolBolded letters dded letters dded letters dded letters denotes mandatory passage of this stepenotes mandatory passage of this stepenotes mandatory passage of this stepenotes mandatory passage of this step Points Points Points Points PossiblePossiblePossiblePossible Passing Passing Passing Passing ScoreScoreScoreScore AttemptAttemptAttemptAttempt Performance RatingPerformance RatingPerformance RatingPerformance Rating (Points)(Points)(Points)(Points) PASSPASSPASSPASS FAILFAILFAILFAIL 4 3 First Second Third