HomeMy WebLinkAboutPB 406.03L NEW 7-2011PPPEEERRRFFFOOORRRMMMAAANNNCCCEEE BBBEEENNNCCCHHHMMMAAARRRKKKSSS
406.0406.0406.0406.03333LLLL
Contain a Leak in a 55 GalloContain a Leak in a 55 GalloContain a Leak in a 55 GalloContain a Leak in a 55 Gallon Drumn Drumn Drumn Drum
Anne Huff,Anne Huff,Anne Huff,Anne Huff, Fire ChiefFire ChiefFire ChiefFire Chief
Beaumont Fire-Rescue Services
Discipline:Discipline:Discipline:Discipline: Hazmat Hazmat Hazmat Hazmat –––– Technician Technician Technician Technician LevelLevelLevelLevel
EEEEffective:ffective:ffective:ffective: 7777////5/5/5/5/2020202011111111
Revised:Revised:Revised:Revised:
Replaces:Replaces:Replaces:Replaces:
I. I. I. I. ObjectiveObjectiveObjectiveObjective
A. Given scenarios involving hazardous materials/WMD incidents, the hazardous
materials technician shall select the tools, equipment, and materials for the control of
hazardous materials/WMD incidents and identify the precautions for controlling
releases from the packaging/containers and shall complete the following tasks:
B. Given a 55 gal (208 L) drum and applicable tools and materials, demonstrate the
ability to contain the following types of leaks:
1. Bung leak
2. Chime leak
3. Forklift puncture
4. Nail puncture
C. Given a 55 gal (208 L) drum and an over pack drum, demonstrate the ability to place
the 55 gal (208 L) drum into the over pack drum using the following methods:
1. Rolling slide-in
2. Slide-in
3. Slip-over
II. II. II. II. Instructions Instructions Instructions Instructions –––– ProcedurProcedurProcedurProcedures for Achieving the Objectivees for Achieving the Objectivees for Achieving the Objectivees for Achieving the Objective
Presented with a 55-gallon leaking drum containing a randomly selected leak
involving either a nail puncture, a forklift puncture, a chime leak, or a leaking closure (bung
or top) you will choose the appropriate tools and equipment, from the equipment available,
and contain the leak. Additionally you will over pack the drum utilizing a randomly selected
method (selected by the examiner). After donning CPC, you will begin on my instructions to
start. The skill will end when you state or indicate to me that you have completed all the
identified steps. Do you understand these instructions?
III. III. III. III. Examiner’s NoteExaminer’s NoteExaminer’s NoteExaminer’s Note
The hazardous materials technician will not be allowed to review the performance
steps at the time of testing.
PB 406.03L – Contain a Leak in a 55 Gallon Drum Page 2 of 3
IV. IV. IV. IV. Preparation & EquipmentPreparation & EquipmentPreparation & EquipmentPreparation & Equipment
A. 55-gallon drum with either a nail puncture, a forklift puncture, a chime, leak, or a
leaking closure (bung).
B. Bung wrench
C. Drum plugging and patching kit
D. Over pack drum
E. CPC with respiratory protection
V. V. V. V. ReReReReference Sourcesference Sourcesference Sourcesference Sources
See Reference Sources in PB 406.03A.
PB 406.03L – Contain a Leak in a 55 Gallon Drum Page 3 of 3
PB 406.03L – Containing a Leak in a 55 gallon Drum
DDDDiscipline: Hazardous Materials
Name:
Officer #:
Evaluator:
Officer #:
Date:
Location:
TTTThehehehe Haz Mat Technician shall:Haz Mat Technician shall:Haz Mat Technician shall:Haz Mat Technician shall: (No partial points given)
A. Given a 55 Gal (208L) drum and applicable tools and materials, demonstrate
the ability to contain one of the following types of leaks:
1. Bung leak
2. Chime leak
3. Forklift puncture
4. Nail puncture
.…………………………….……………………………............ P/F___P/F___P/F___P/F_______
B. Given a 55 Gal (208L) drum and an over pack drum, demonstrate the ability
to place the 55 gal (208L) drum into the over pack drum using one of the
following methods:
1. Rolling slide-in
2. Slide-in
3. Slip-over
…….……………………………………………………..……….P/F____P/F____P/F____P/F____
C. All tasks must be performed in Chemical Protective Clothing
Time AllocationTime AllocationTime AllocationTime Allocation
Completes skill in allotted time ......................................................................... P/FP/FP/FP/F _____
Allotted time for this skill: Allotted time for this skill: Allotted time for this skill: Allotted time for this skill: _____ minutes _____ seconds_____ minutes _____ seconds_____ minutes _____ seconds_____ minutes _____ seconds
Actual time:Actual time:Actual time:Actual time: _____ minutes _____ seconds_____ minutes _____ seconds_____ minutes _____ seconds_____ minutes _____ seconds
Points Points Points Points
PossiblePossiblePossiblePossible
Passing Passing Passing Passing
ScoreScoreScoreScore
AttemptAttemptAttemptAttempt
Performance RatingPerformance RatingPerformance RatingPerformance Rating
(Po(Po(Po(Points)ints)ints)ints)
PASSPASSPASSPASS
FAILFAILFAILFAIL
P/F
P/F
First
Second
Third