Loading...
HomeMy WebLinkAboutPB 402.10I NEW 3-2011PPPEEERRRFFFOOORRRMMMAAANNNCCCEEE BBBEEENNNCCCHHHMMMAAARRRKKKSSS 404040402222....10101010IIII TwoTwoTwoTwo----Firefighter Firefighter Firefighter Firefighter CCCConnection of the onnection of the onnection of the onnection of the 5” 5” 5” 5” Storz Storz Storz Storz totototo 2222----½½½½”””” WyeWyeWyeWye ApplianceApplianceApplianceAppliance TTTToooo aaaa Standpipe/Sprinkler FDCStandpipe/Sprinkler FDCStandpipe/Sprinkler FDCStandpipe/Sprinkler FDC Anne Huff,Anne Huff,Anne Huff,Anne Huff, Fire ChiefFire ChiefFire ChiefFire Chief Beaumont Fire-Rescue Services Discipline:Discipline:Discipline:Discipline: FireFireFireFire Protection SystProtection SystProtection SystProtection Systemsemsemsems Effective:Effective:Effective:Effective: 3/5/20113/5/20113/5/20113/5/2011 Revised:Revised:Revised:Revised: Replaces:Replaces:Replaces:Replaces: I. I. I. I. ObjectivObjectivObjectivObjectiveeee The firefighter, using two 25’ sections of 2-1/2” fire hose, 100’ of 5” hose and the 5” Storz to 2-½” wye appliance, shall demonstrate the proper procedure for a two-firefighter connection method to the standpipe/sprinkler FDC. The firefighters shall be given a maximum of three (3) minutes to complete the skill. II. II. II. II. Instructions Instructions Instructions Instructions –––– Procedures for Achieving the ObjectiveProcedures for Achieving the ObjectiveProcedures for Achieving the ObjectiveProcedures for Achieving the Objective While wearing full protective clothing and a self-contained breathing apparatus (SCBA), you shall demonstrate the two-firefighter method of connecting the 5” Storz to 2-½” wye adaptor and 5” hose from the apparatus to the standpipe/sprinkler FDC. You will have a maximum time limit to complete this skill of three (3) minutes. You will begin on my instruction to start. The skill will end when you state to me that you have completed the identified steps. Do you understand these instructions? III. III. III. III. Examiner’s NoteExaminer’s NoteExaminer’s NoteExaminer’s Note The firefighters will not be allowed to review the performance steps at the time of testing. IIIIV. V. V. V. Preparation & EquipmentPreparation & EquipmentPreparation & EquipmentPreparation & Equipment A. Two 25’ sections of 2-½” hose B. 5” Storz to 2-½” wye appliance C. Assorted spanners/wrenches to complete the task D. 100’ of 5” hose Note: The firefighters shall accomplish the skill wearing “FULL PROTECTIVE CLOTHING FOR STRUCTURAL FIREFIGHTER” as required by the Texas Commission on Fire Protection to include helmet, coat, boots, hood, and trousers. Gloves shall be optional. Firefighters will not don face piece or hood. V. V. V. V. Reference SourcesReference SourcesReference SourcesReference Sources A. National Fire Protection Association (NFPA) 1001, 3-3.13(a) B. IFSTA, Essentials of Fire Fighting, 4th Edition, pages 578-584. PB 402.10H –Two-FF Connection of 5” Stortz to 2-1/2” Adapter to FDC Page 2 of 2 402.10I – Two firefighter Connection of the Storz to 2-½”Wye Appliance to the Standpipe/Sprinkler FDC Discipline: Fire Protection Systems FirefighterFirefighterFirefighterFirefighter #1#1#1#1:::: (No partial points given) a) Obtains the necessary tools and equipment prior to approaching the FDC ................................................................................................ 1.0_____ b) Removes the Storz to 2-½” wye adaptor and the two sections of 2-½” hose from the apparatus compartment ......................................... 1.0_____ c) Carries the sections of 2-½” hose toward the FDC stopping 25’ prior to FDC ................................................................................... 1.0_____ d) Unrolls the 2-½” sections of hose toward the FDC ................................. 1.0_____ e) Inspects the FDC connections for debris prior to connection.................... 1.0_____ f) Connects the 2-½” hose to the FDC ..................................................... P/FP/FP/FP/F _____ g) Assists Firefighter #2 in completing all connections ............................... P/FP/FP/FP/F _____ Firefighter Firefighter Firefighter Firefighter #2#2#2#2:::: (No partial points given) a) Carries Storz 5” to 2-½” wye and 5” hose to the 2-½” hose already connected to FDC ...................................................................... 1.0_____ b) Connects the 5” hose to the Storz to 2-½” wye ..................................... P/FP/FP/FP/F _____ c) Connects the two 2-½” hose couplings to the wye .................................. P/FP/FP/FP/F _____ d) Checks to ensure the wye valves are in the open position ........................ 1.0_____ e) Both firefighters complete the skill in the allotted time ............................. P/FP/FP/FP/F _____ Points Points Points Points PossiblePossiblePossiblePossible Passing Passing Passing Passing ScoreScoreScoreScore AttemptAttemptAttemptAttempt Performance RatingPerformance RatingPerformance RatingPerformance Rating (Points)(Points)(Points)(Points) PASSPASSPASSPASS FAILFAILFAILFAIL 7777 5555 FirstFirstFirstFirst SecondSecondSecondSecond ThirdThirdThirdThird Name:Name:Name:Name: OfOfOfOfficer #:ficer #:ficer #:ficer #: Evaluator:Evaluator:Evaluator:Evaluator: Officer #:Officer #:Officer #:Officer #: Date:Date:Date:Date: Location:Location:Location:Location: Name:Name:Name:Name: Officer #:Officer #:Officer #:Officer #: Evaluator:Evaluator:Evaluator:Evaluator: Officer #:Officer #:Officer #:Officer #: Date:Date:Date:Date: Location:Location:Location:Location: