Loading...
HomeMy WebLinkAboutPB 402.09B REVISED 12-2012PPPEEERRRFFFOOORRRMMMAAANNNCCCEEE BBBEEENNNCCCHHHMMMAAARRRKKKSSS 404040402222....09090909BBBB Hoisting Hoisting Hoisting Hoisting UnchargedUnchargedUnchargedUncharged Hose LinesHose LinesHose LinesHose Lines Anne Huff,Anne Huff,Anne Huff,Anne Huff, Fire ChiefFire ChiefFire ChiefFire Chief Beaumont Fire-Rescue Services Discipline:Discipline:Discipline:Discipline: HoseHoseHoseHose Effective:Effective:Effective:Effective: 1/1/20011/1/20011/1/20011/1/2001 Revised:Revised:Revised:Revised: 12121212/5/5/5/5/201/201/201/2012222 Replaces:Replaces:Replaces:Replaces: Firefighter Benchmark #59Firefighter Benchmark #59Firefighter Benchmark #59Firefighter Benchmark #59 I. I. I. I. ObjectiveObjectiveObjectiveObjective The firefighter, given the necessary equipment and assistance, shall demonstrate hoisting an uncharged 2-½” hose line to an upper landing. II. II. II. II. Instructions Instructions Instructions Instructions –––– Procedures for Achieving the ObjectiveProcedures for Achieving the ObjectiveProcedures for Achieving the ObjectiveProcedures for Achieving the Objective You shall demonstrate the proper method of hoisting an uncharged 2-½” hose line to the second floor. You will begin on my instruction to start. The skill will end when you state to me that you have completed all of the identified steps. Do you understand this instruction? IIIIIIIII. I. I. I. Examiner’s NoteExaminer’s NoteExaminer’s NoteExaminer’s Note The firefighter will not be allowed to review the performance steps at the time of testing. IV. IV. IV. IV. Preparation & EquipmentPreparation & EquipmentPreparation & EquipmentPreparation & Equipment A. 3 sections of 2-½” hose B. Rope C. Appropriate nozzle(s) for each hose line NOTE: The firefighter shall accomplish the skills wearing “FULL PROTECTIVE CLOTHING FOR STRUCTURAL FIREFIGHTER” as required by the Texas Commission on Fire Protection to include helmet, gloves, coat, trousers, boots, and SCBA. V. V. V. V. Reference SourcesReference SourcesReference SourcesReference Sources A. TCFP, Performance Standards, Section 106-9.01. B. NFPA, 1001 3-3.9(a), 3-3.9(b), 3-3.12(b). C. IFSTA, Essentials of Fire Fighting, 4th Edition, pages 171, 430-431. PBPBPBPB 404040402222....09090909BBBB –––– Hoisting Hoisting Hoisting Hoisting and Advancing a Hose Lineand Advancing a Hose Lineand Advancing a Hose Lineand Advancing a Hose Line PagePagePagePage 2222 of of of of 2222 402.09B - Hoisting and Advancing Hose Lines Discipline: Hose Name: Officer #: Evaluator: Officer #: Date: Location: If the firefighter:If the firefighter:If the firefighter:If the firefighter: (No partial points given)(No partial points given)(No partial points given)(No partial points given) HoiHoiHoiHoisting an uncharged hose line (2sting an uncharged hose line (2sting an uncharged hose line (2sting an uncharged hose line (2----½ inch)½ inch)½ inch)½ inch) a) Arranges necessary equipment in an organized manner .............................. 1.0 _____ b) Safety hoists uncharged hose line to the roof or upper landing .................... 2.0 _____ c) Keeps rope and hitches next to building with nozzle away from the building ................................................................................................. 1.0 _____ d) Raises hose and nozzle effectively and efficiently ........................................ 1.0 _____ Points Points Points Points PossiblePossiblePossiblePossible Passing Passing Passing Passing ScoreScoreScoreScore AttemptAttemptAttemptAttempt Performance RatingPerformance RatingPerformance RatingPerformance Rating (Points)(Points)(Points)(Points) PASSPASSPASSPASS FAILFAILFAILFAIL 5 4 First Second