HomeMy WebLinkAboutSite Assessment Worksheet
TEXAS DIVISION OF EMERGENCY MANAGEMENT
TEXAS DEPARTMENT OF PUBLIC SAFETY
PUBLIC PROPERTY SITE ASSESSMENT WORKSHEET
TDEM-25 (5/10)
PG____of _____
KEY FOR DAMAGE CATEGORY (Use appropriate letters in the “category” blocks below)
A. DEBRIS CLEARANCE D. WATER CONTROL FACILITIES G. OTHER
B. PROTECTIVE MEASURES E. BUILDINGS AND EQUIPMENT
C. ROAD SYSTEMS F. PUBLIC UTILITY SYSTEM
SITE NO. CATEGORY LOCATION (Use map location, address, etc.)
DESCRIPTION OF DAMAGE
IMPACT INSURANCE % COMPLETE COST ESTIMATE
SITE NO. CATEGORY LOCATION (Use map location, address, etc.)
DESCRIPTION OF DAMAGE
IMPACT INSURANCE % COMPLETE COST ESTIMATE
SITE NO. CATEGORY LOCATION (Use map location, address, etc.)
DESCRIPTION OF DAMAGE
IMPACT INSURANCE % COMPLETE COST ESTIMATE
SITE NO. CATEGORY LOCATION (Use map location, address, etc.)
DESCRIPTION OF DAMAGE
IMPACT INSURANCE % COMPLETE COST ESTIMATE
PUBLIC ASSISTANCE DAMAGE ASSESSMENT CHECKLIST
(To Prepare for State and/or Federal Inspectors)
In order to expedite the damage assessment process, applicants should take the following steps before the
arrival of the State and Federal assessment team:
1. Mark the location of each damage site on a suitable map and develop a route of travel to each site.
Segregate damage/work activities into the seven categories of work, listed on the front of this
worksheet. All damage sites should be identified by the applicant before the inspectors arrive.
2. Ensure that the person designated to accompany the survey team is knowledgeable of the repairs
already made and the location of all other damage sites which need to be repaired/surveyed.
3. Have photographs, site sketches or drawings of each damage site available for the inspectors
(especially where work has already been performed).
4. Compile a detailed breakdown of labor (including fringe benefits), equipment, and material costs for
each location where work has been completed or is in progress. While a variety of forms can be
used to summarize these items, the format chosen must document the type and location of work
performed on a daily basis.
5. Record force account equipment use in a manner compatible with the FEMA Schedule of Equipment
Rates. Keep damaged equipment and parts for review and inspection by the survey team.
6. List equipment, materials or inventory lost as a result of the disaster. Provide copies of estimates,
bids, purchase orders, invoices, inventory records or other substantiating evidence to verify loss
values or replacement cost.
7. Be prepared to describe to the inspectors which sites will be repaired by contract and those which
will be repaired by force account. If a contractor's estimate/bid has been received, have it available
for the inspectors.
8. Provide inspectors with policy information on insurance coverage and any proceeds received or
anticipated.