Loading...
HomeMy WebLinkAboutRES 14-170RESOLUTION NO.14-170 WHEREAS, construction of the streets, storm sewer, water and sanitary sewer improvements constructed in Deerfield Phase Three have been completed as follows: ; and, Streets • Winnsboro Circle approximately 404 feet extension east of existing Winnsboro Circle to and including the cul-de-sac. • Carrie Lane approximately 186 feet extension north of the existing Carrie Lane to the 3-OM4-3 Dead End Roadway markers. Storm Sewer, Water and Sanitary Sewer Improvements • Deerfield Phase Three, right-of-way only. WHEREAS, the developers of said streets desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department has determined that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the above -referenced street, storm sewer, water and sanitary sewer improvements in Deerfield Phase Three, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 12th day of August, 2014. r+ i ayor Becky Ames - C! ..... Ul