HomeMy WebLinkAboutRES 14-119RESOLUTION NO.14 -119 WHEREAS, on April 9, 2013, the City Council of the City of Beaumont, Texas passed Resolution No. 13 -082 awarding a contract in the amount of $12,330,865 to Allco, LLC, of Beaumont, Texas, for the South Park Drainage Improvement Project; and, WHEREAS, on August 12, 2013, the City Manager executed Change Order No. 1, in the amount of $7.705 to furnish a temporary fence within the Chemtrade Chemical Plant, thereby increasing the contract amount to $12,338,570; and, WHEREAS, on October 21, 2013, the City Manager executed Change Order No. 2, in the amount of $9,863.99 for the construction of a concrete wingwall at the outfall inside the Chemtrade Chemical Plant, thereby increasing the contract amount to $12,348,433.99; and, WHEREAS, on November 25, 2013, the City Manager executed Change Order No. 3, in the amount of $3,173.81 for the removal of a raised median for driveway access to LIT and SETX Food Bank, thereby increasing the contract amount to $12,351,607.80; and, WHEREAS, on February 20, 2014, the City Manager executed Change Order No. 4, in the amount of $5,665.38 for the addition of reinforcing steel in the concrete roadway, thereby increasing the contract amount to $12,357,273.18; and, WHEREAS, on March 4, 2014, the City Council of the City of Beaumont, Texas passed Resolution No. 14 -057 authorizing the City Manager to execute Change Order No. 5, in the amount of $23,059.13, to include costs associated with realignment of the storm sewerwithin the KCS railroad crossing easement and a deduction foreliminating the prime coat and embankment material, thereby increasing the contract amount to $12,380,332.31; and, WHEREAS, on March 28, 2014, the City Manager executed Change Order No. 6, in the amount of $6,294.22, for all costs associated with the installation of cement stabilized backfill at the junction box on MLK feeder road, removal and installation of pipe and inlets on East Lavaca, the removal and shoring costs and installation of field modifications for a by -pass pumping access point, thereby increasing the contract amount to $12,386,626.53; and, WHEREAS, Change Order No. 7, in the amount of $143,400, is required to include costs associated with bypass pumping of the storm water within the construction area to the existing storm sewer system, thereby increasing the contract amount to $12,530,026.53; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 7 for additional work described above, thereby increasing the contract amount by $143,400 for a total contract amount of $12,530,026.53 for the South Park Drainage Improvement Project. 2014. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 27th day of May, U140 MUor Becky