HomeMy WebLinkAboutRES 14-086RESOLUTION NO.14-086 WHEREAS, on October 18, 2011, the City Council of the City of Beaumont, Texas, passed Resolution No. 11-303 awarding a contract in the amount of $1,644,323 with Brystar Contracting, Inc., of Beaumont, Texas, for the Sanitary Sewer Rehabilitation of Small Diameter Mains Contract XXI Project; and, WHEREAS, on August 14, 2012, the City Council of the City of Beaumont, Texas passed Resolution No. 12-170 authorizing Change Order No. 1, in the amount of $25,153.75, to furnish all necessary labor, materials, and equipment to pipeburst approximately 2,140 linear feet of 6 -inch sanitary sewer lines with 8 -inch DR -17 HDPE; delete 1,675 linear feet of 6 -inch sanitary sewer lines; remove and replace one existing sanitary sewer manhole; furnish and install one end -of -line cleanout; replace two 4 -inch short side service connections; replace one 4 -inch long side service connection; pre televise three existing services; clean and televise approximately 465 linear feet of deteriorated lines; and post televise 465 linear feet of rehabilitated sanitary sewer lines, thereby increasing the contract amount to $1,669,476.75; WHEREAS, on January 8, 2013, the City Council of the City of Beaumont, Texas passed Resolution No. 13-001 authorizing Change Order No. 2 in the amount of $26,850 to furnish all necessary labor, materials, and equipment to pipeburst approximately 540 linear feet of 8 -inch sanitary sewer lines with 10 -inch DR -17 HDPE; furnish and install one (1) sanitary sewer manhole; replace three (3) 4 -inch short side service connections; replace two (2) 4 -inch long side service connections; pre televise five (5) existing services; clean and televise approximately 540 linear feet of deteriorated lines; and post televise 540 feet of rehabilitated sanitary sewer lines, thereby increasing the contract amount to 1,696,326.75; and, WHEREAS, Change Order No. 3 in the amount of ($45,870.91) is required to furnish all necessary labor, materials, and equipment to pipeburst approximately 274.5 linear feet of 8 -inch sanitary sewer lines with 8 -inch DR -17 HDPE; furnish and install one (1) sanitary sewer manhole; abandon seven (7) manholes in place; replace one 4 -inch long side service connection; and, pre televise approximately 198.5 linear feet of deteriorated lines. The proposed change order will also deduct 2,036 linear feet of 6 -inch sanitary sewer lines; approximately 195 linear feet of 8 -inch sanitary sewer lines; stabilization of nine (9) existing manholes; remove and replace 15 existing manholes with new ring and cover; furnish and install five (5) end of line cleanouts; replace three (3) 4 -inch short side service connections pre televise 86 existing services; and, post televise 2,056.5 linear feet of rehabilitated sanitary sewer lines. This change order also includes the purchase of the remaining materials on hand, thereby decreasing the contract amount to $1,650,455.84; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; THAT the City Manager be and he is hereby authorized to execute Change Order No. 3 in the amount of ($45,870.91), thereby decreasing the contract amount to $1,650,455.84, forthe Sanitary Sewer Rehabilitation of Small Diameter Mains Contract XXI Project. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 22nd day of April, 2014. �Aayo'r Becky Wmes -