Loading...
HomeMy WebLinkAboutRES 14-076RESOLUTION NO.14-076 WHEREAS, on August 16, 2011, the City Council of the City of Beaumont, Texas, passed Resolution No. 11-229 awarding a contract in the amount of $1,111,359 to Allco, LLC, of Beaumont Texas, forthe Wastewater Treatment Plant Sludge Pump Replacement Project to furnish all labor, materials, and equipment to remove and replace the existing belt press pumps at the Wastewater Treatment Plant located at 4900 Lafin Road; and, WHEREAS, on August 6, 2013, the City Council of the City of Beaumont, Texas, passed Resolution No. 13-162 approving Change Order No. 1 in the amount of ($25,355.75) to furnish all necessary labor, materials, and equipment to install a new concrete slab and pipe rail for the refurbished belt press conveyor; install access stairs and handrails for Junction Box No. 3; install a new 6 -inch diameter force main from the grit cyclonic units to the grit classifiers; connect an existing 6 -inch drain to the 12 -inch main at the Influent Building; increase Bid Item 7.5 to provide six (6) additional pipe bollards at the Belt Press Canopy; and reduce Bid Item 5.2 amount to refurbish belt press conveyor, thereby decreasing the contract amount to $1,086,003.25; and, WHEREAS„ on March 4, 2104, the City Council of the City of Beaumont, Texas, passed Resolution No. 14-053 approving Change Order No. 2 in the amount of $48,309.96 to furnish and install new electrical equipment in MCC 1 for Pumps 1 and 3; reinstall VFD equipment in MCC 1 thatwas damaged by sewergas corrosion; modifythe Primary Sludge Pump belts and sheave size; provide the additional work required to perform the suction pipe connections due to existing underground electrical and piping conflicts uncovered once excavation work began; replace an existing concrete pump pad for Primary Pumps 1 & 3 that was damaged due to deterioration; replace secondary pump check valves; provide for a price adjustment for modifications of the Sludge Belt Conveyor based on actual supplied equipment, and delete the allowance for Bid Item 11, thereby increasing the contract amount to $1,134,313.21; and, WHEREAS, Change Order No. 3 in the amount of $168,098.00 is required to replace the existing 10" secondary sludge force main, from the new Secondary Pump Station to the existing Cyclonic Degrit Units, with four (4) independent discharge lines made of 6" diameter PVC pipe; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 3 in the amount of $168.098.00, thereby increasing the contract amount to $1,302,411.21 for the Wastewater Treatment Plant Sludge Pump Replacement Project. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 8th day of March, 2014. t - ayor Beck Ames -