HomeMy WebLinkAboutRES 13-228 RESOLUTION NO.13-228
WHEREAS, on May 14, 2013, the City Council of the City of Beaumont, Texas
passed Resolution No. 13-111 awarding a contract in the amount of$377,000 to McInnis
Construction, Inc., of Silsbee, Texas, for the Civic Center North Entry Project; and,
WHEREAS, on May 14, 2013, the City Council of the City of Beaumont, Texas,
passed Resolution No. 13-111 approving Change Order No. 1 in the amount of($28,400)
for the elimination of 230 sq. ft. of exterior pavers, a glass wall on the north side, square
columns in lieu of tapered columns, accent flooring tile, new light fixtures and new ceiling
tile in the secondary entryway, thereby decreasing the contract amount to $348,600; and,
WHEREAS, on July 30, 2013, the City Manager executed Change Order No. 2 in
the amount of$6,267.80 to replace belled footing on the north side, thereby increasing the
contract amount to $354,867.80; and,
WHEREAS, on September 11, 2013, the City Manager executed Change Order No.
3 in the amount of$7,992.63 to install sheet rock, wall protection and ceiling grid in corridor
102, thereby increasing the contract amount to $362,860.43; and,
WHEREAS, Change Order No. 4, in the amount of $18,301.80 is required for
removal of two trees located in the existing sidewalk and the installation of a brick paved
sidewalk connecting to the new brick paved sidewalk at the intersection of Main and the
parking lot entrance, thereby increasing the contract amount to $381,162.23;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order
No. 4 for additional work described above, thereby increasing the contract amount by
$18,301.80 for a total contract amount of$381,162.23.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 15th day of
October, 2013.