HomeMy WebLinkAboutRES 13-162 RESOLUTION NO.13-162
WHEREAS, on August 16, 2011, the City Council of the City of Beaumont, Texas,
passed Resolution No. 11-229 awarding a contract in the amount of $1,111,359 to Allco,
LLC, of Beaumont Texas,forthe Wastewater Treatment Plant Sludge Pump Replacement
Project to furnish all labor, materials, and equipment to remove and replace the existing
belt press pumps at the Wastewater Treatment Plant located at 4900 Lafin Road; and,
WHEREAS, Change Order No. 1 in the amount of ($25,355.75) is required to
furnish all necessary labor, materials, and equipment to install a new concrete slab and
pipe rail for the refurbished belt press conveyor; install access stairs and handrails for
Junction Box No. 3; install a new 6-inch diameter force main from the grit cyclonic units to
the grit classifiers; connect an existing 6-inch drain to the 12-inch main at the Influent
Building; increase Bid Item 7.5 to provide six (6) additional pipe bollards at the Belt Press
Canopy; and reduce Bid Item 5.2 amount to refurbish belt press conveyor, thereby
decreasing the contract amount to $1,086,003.25; and,
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order
No. 1 in the amount of ($25,355.75), thereby decreasing the contract amount to
$1,086,003.25 for the Wastewater Treatment Plant Sludge Pump Replacement Project.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 6th day of
August, 2013.
�' - a or Becky mes -
AW