HomeMy WebLinkAboutRES 13-137 RESOLUTION NO.13-137
WHEREAS, on August 9, 2011, the City Council of the City of Beaumont, Texas,
passed Resolution No. 11-217 awarding a contract in the amount of$2,920,815.00 with
Allco, LLC, Beaumont, Texas, for the Wastewater Treatment Plant Bar Screen
Replacement and Digester Rehabilitation Project; and,
WHEREAS, on July 17, 2012, the City Council of the City of Beaumont, Texas,
passed Resolution No. 12-152 authorizing Change Order No. 1, in the amount of
$78,646.66,to furnish all necessary labor,materials,and equipment to remove and replace
existing sluice gate brackets at influent channels; remove and replace the existing light
fixtures in the bar screen and influent pump area, modify digester baffles at telescopic
valves, extend the 12" blowoff on blower header piping at the digesters; pipeburst the
existing 10"concrete drain line into the influent building;furnish and install a new high flow
bar screen in lieu of rehabilitation of the existing bar screen; and furnish and install a new
30" diameter sanitary sewer force main to the wastewater treatment plant influent box
including pipe and fittings, a new manhole, concrete repair, and a temporary entrance to
the Wastewater Treatment Plant;thereby increasing the contract amount to$2,999,461.66;
and,
WHEREAS, on February 11, 2013, the City Manager executed Change Order No.
2 in the amount of$9,921.00 to furnish all necessary labor, equipment, and materials to
prepare and paint the existing walls, ceiling, and floor of the influent pump room, thereby
increasing the contract amount to $3,009,382.66; and,
WHEREAS, on April 24, 2013, the City Manager executed Change Order No. 3 in
the amount of $8,662.00 to furnish all necessary labor, equipment, and materials to
I
prepare and paint the existing spiral stairway to the influent pump room and the four
existing influent pumps and piping; and,to reduce the costs for foam control and screening
removal, thereby increasing the contract amount to $3,018,044.66; and,
WHEREAS, Change Order No. 4, in the amount of$196,722, is required to furnish
all necessary engineering design, labor, materials, and equipment to replace the existing
walls and roofs and to rehabilitate, seal and connect the bases of the existing sewer
junction boxes at the main entrance and northeast comer of the Wastewater Treatment
Plant; and, to delete Additive Bid Item 6 for the proposed 42-inch bypass line, thereby
increasing the contract amount to $3,214,766.66;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted, and,
THAT the City Manager be and he is hereby authorized to execute Change Order
No. 4 in the amount of $196,722.00, thereby increasing the contract amount to
$3,214,766.66,forthe Wastewater Treatment Plant BarScreen Replacement and Digester
Rehabilitation Project.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 25th day of
June, 2013.