HomeMy WebLinkAboutRES 12-152 RESOLUTION NO. 12-152
WHEREAS, on August 9, 2011, the City Council of the City of Beaumont, Texas,
passed Resolution No. 11-217 awarding a contract in the amount of$2,920,815.00 with
Allco, LLC, Beaumont, Texas, for the Wastewater Treatment Plant Bar Screen
Replacement and Digester Rehabilitation Project; and,
WHEREAS, Change Order No. 1, in the amount of $78,646.66, is required to
furnish all necessary labor, materials,and equipment to remove and replace existing sluice
gate brackets at influent channels; remove and replace the existing light fixtures in the bar
screen and influent pump area, modify digester baffles at telescopic valves,extend the 12"
blowoff on blower header piping at the digesters; pipeburst the existing 10"concrete drain
line into the influent building; furnish and install a new high flow bar screen in lieu of
rehabilitation of the existing bar screen; and furnish and install a new 30"diameter sanitary
sewer force main to the wastewater treatment plant influent box including pipe and fittings,
a new manhole, concrete repair, and a temporary entrance to the Wastewater Treatment
Plant; thereby increasing the contract amount to $2,999,461.66;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted.
THAT the City Manager be and he is hereby authorized to execute Change Order
No. 1 in the amount of $78,646.66, thereby increasing the contract amount to
$2,999,461.66,for the Wastewater Treatment Plant Bar Screen Replacement and Digester
Rehabilitation Project.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 17th day of July,
2012.
C�
- Mayor Becky Ames -