Loading...
HomeMy WebLinkAboutRES 11-320 RESOLUTION NO. 11-320 WHEREAS, on December 14, 2010, the City Council of the City of Beaumont, Texas, passed Resolution No. 10-322 awarding a contract in the amount of$3,022,510.00 to Russell Marine, LLC, of Channelview, Texas, for the Riverfront Park Bank Stabilization Project; and, WHEREAS, Change Order No. 1 in the amount of $41,190.00 was required for unforeseen work due to the failure of the concrete bulkhead wall, thereby increasing the contract amount to $3,063,700.00; and, WHEREAS, Change Order No. 2 in the amount of $35,953.24 was required for removing and disposing submerged timber pilings and the replacement of a damaged 36 inch outfall pipe, thereby increasing the contract amount to $3,099,653.24; WHEREAS, Change Order No. 3 in the amount of$11,275.00 was required for the replacement of approximately 850 square feet of sidewalk, 14 linear feet of concrete cap, as well as the installation of two (2) additional bollards, thereby increasing the contract amount to $3,110,928.24; and, WHEREAS, Change Order No. 4 in the amount of($1,250.00)was required for the elimination of hydro-mulching, thereby decreasing the contract amount to$3,109,678.24; and, WHEREAS, Change Order No. 5 in the amount of($21,600.00) is required for the reduction of flowable fill material, thereby decreasing the contract amount to $3,088,078.24; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and THAT the City Manager be and he is hereby authorized to execute Change Order No. 5 for additional work described above, thereby decreasing the contract amount by ($21,600.00) for a total contract amount of$3,088,078.24. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 15th day of November, 2011. ayor Becky Ames - k�s`�