HomeMy WebLinkAboutRES 10-224 RESOLUTION NO. 10-224
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in Bayou Willow Parkway, Part I, have been completed as
follows:
Street
• Bayou Willow Parkway approximately 2,444 feet south of existing Interstate
Highway 10 Service Road towards State Highway 124 (Fannet Road) dead
ended before the BNSF Railroad tracks.
Storm Sewer. Water and Sanitary Sewer Improvements
• Bayou Willow Parkway, Part I, right-of-way only.
WHEREAS, the developers of said street desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department has
determined that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the above-referenced street, storm sewer, water and sanitary sewer improvements
in Bayou Willow Parkway, Part I,with the exception of streetlights, are hereby accepted by
the City of Beaumont and shall be continuously maintained by the City contingent upon
filing of the final plat, complete with filings of dedication of all rights-of-way and easements
required on the preliminary and final plats and installation of the streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 24th day of
August, 2010.
- a or Beck Ames -
�� Y Y