WHEREAS,on November4,2008,the City Council of the City of Beaumont,Texas,
passed Resolution No. 08-297 awarding a contract in the amount of $8,595,437.53 to
Brystar Contracting of Beaumont, Texas, for a contract for the Downtown Brick Paved
Sidewalks and Drainage Improvements (Park from Crockett to College, Neches from
Liberty to College, North Pearl from Calder to North Street, College from Neches to Pearl,
Wall from Neches to Orleans, Forsythe from Neches to Pearl, Fannin from Neches to
Orleans, Bowie from Neches to Pearl, Liberty from Magnolia to Pearl, and Broadway from
Magnolia to Pearl); and,
WHEREAS, Change Order No. 1 in the amount of$337,559 was required to install
storm sewer pipe capturing all roof drainage from the Goodwill and Municipal Court
buildings and the reconstruction of the Municipal Court parking area to eliminate water
entering the building through weep holes, thereby increasing the contract amount to
$8,932,996.53;
WHEREAS, Change Order No. 2 in the amount of$371,755.55 is required to add
construction item quantities for brick sidewalk improvements for Neches Street (College
Street to the railroad tracks), south side of College Street(Neches Street to Trinity Street)
and Crockett Street(Park Street to Orleans Street),thereby increasing the contract amount
to $9,304,752.08;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager is hereby authorized to execute Change Order No.2 in the amount
of$371,755.55, thereby increasing the contract amount to $9,304,752.08.