Loading...
HomeMy WebLinkAboutRES 10-087 RESOLUTION NO. 10-087 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute a Grade Crossing Construction and Maintenance Agreement with Burlington, Northern & Santa Fe Railway Company and Beaumont Independent School District for the Bayou Willow Parkway Project. The agreement is substantially in the form attached hereto as Exhibit "A" and made a part hereof for all purposes. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 13th day of April, 2010. to, �� - Mayor Becky Ames - GRADE CROSSING CONSTRUCTION AND MAINTENANCE AGREEMENT BNSF File No. 023805 Bayou Willow Parkway U.S. D.O.T. No. 023805K Railroad Line Segment 7505 Railroad Milepost 71.30 This Agreement ("Agreement"), is executed to be effective as of this 30`h day of December, 2009 ("Effective Date"), by and between BNSF RAILWAY COMPANY, a Delaware corporation ("BNSF"), the CITY OF BEAUMONT, a political subdivision of the State of Texas ("City"), and the BEAUMONT INDEPENDENT SCHOOL DISTRICT("Agency"). RECITALS: WHEREAS, BNSF owns and operates a line of railroad in and through the City of El Paso, State of Texas; WHEREAS, in the interest of aiding vehicular travel and public safety, the Agency is undertaking a project to create the new Bayou Willow Parkway at-grade crossing, located at BNSF Line Segment 7505 and Milepost 71.30, and designated by the new D.O.T. No. 023805K, by constructing a 3-lane roadway and installing railroad crossinq signals and activation equipment within a new roadway easement across the BNSF right-of-way as indicated on the Exhibit A, attached hereto and incorporated herein; and WHEREAS, the existing at-grade crossing known as Private/Field Road, Milepost 71.45, DOT No. 023738T, Line Segment 7505, Silsbee Subdivision, Gulf Division will be permanently closed, vacated, abandoned, and removed upon completion of construction and the placing in service of said new Bayou Willow Parkway at-grade crossing; WHEREAS, the parties agree that the RAILROAD will receive no ascertainable benefit from the installation of advance warning signs, pavement marking stop bars or crossing signal equipment (hereinafter collectively called, "Crossing Signal Equipment"); and WHEREAS, the Agency also desires BNSF to install a new crossing surface at Bayou Willow Parkway with a new concrete and rubber crossing surface; WHEREAS, the Agency is paying for the acquisition and installation of crossing signal equipment and the new crossing surface at Bayou Willow Parkway; WHEREAS, the BNSF agrees to purchase and install, at AGENCY'S sole expense, the crossing signal equipment and the new crossing surface described in the scope of work herein, and upon the terms and conditions set forth below. NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties contained herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: ARTICLE I—SCOPE OF WORK 1. The term "Project"as used herein includes any and all work related to the construction of Bayou Willow Parkway by the Agency and installation of crossing signals, activation equipment, and new crossing surfaces at U.S. D.O.T No. 023805K, (hereinafter referred to as the "Crossing")by BNSF, more particularly described on the Exhibit A, including, but not limited to, any and all changes to telephone, telegraph, signal and electrical lines and appurtenances, temporary and permanent track work, fencing, grading, alterations to or new construction of drainage facilities, preliminary and construction engineering and contract preparation and the permanent removal, closure, vacation, and abandonment of the at- Bayou Willow Parkway C&M Agreement(12/30/2009) Page 1 Form 0118 Rev. 12/28/09 EXHIBIT "A" t � grade crossings known as known as Private/Field Road, Milepost 71.45, DOT No. 023738T, Line Segment 7505, Silsbee Subdivision, Gulf Division. ARTICLE 11—BNSF OBLIGATIONS In consideration of the covenants of Agency set forth herein and the faithful performance thereof, BNSF agrees as follows: 1. In consideration of the faithful performance of the Agency's covenants contained herein, BNSF hereby grants to Agency, its successors and assigns, upon and subject to the terms and conditions set forth in this Agreement, permission and license to enter upon and use the portion of BNSF's right-of-way as is necessary to construct and thereafter maintain, the Crossing as described further on Exhibit A, excepting and reserving BNSF's rights, and the rights of any others who have obtained, or may obtain, permission or authority from BNSF, to do the following: (a) Operate, maintain, renew and/or relocate any and all existing railroad track or tracks, wires, pipelines and other facilities of like character upon, over or under the surface of said right-of- way; (b) Construct, operate, maintain, renew and/or relocate upon said right-of-way, without limitation, such facilities as the BNSF may from time to time deem appropriate; (c) Otherwise use or operate the right-of-way as BNSF may from time to time deem appropriate. This right is given by BNSF without warranty of title of any kind, expressed or implied, and no covenant on warranty of title shall be implied from the use of any word or words herein contained. In the event Agency is evicted by anyone owning, or claiming title to or any interest in said right-of-way, BNSF will not be liable to Agency for any damages, losses or any expenses of any nature whatsoever. The granting of similar rights to others, subsequent to the date of this Agreement, will not impair or interfere with the rights granted to Agency herein. 2. BNSF will furnish all labor, materials, tools, and equipment for railroad work required for the construction of the Project, such railroad work and the estimated cost thereof being as shown on Exhibit D attached hereto and made a part hereof. In the event construction on the Project has not commenced within six (6) months following the Effective Date, BNSF may, in its sole and absolute discretion, revise the cost estimates set forth in said Exhibit D. In such event, the revised cost estimates will'become a part of this Agreement as though originally set forth herein. Any item of work incidental to the items listed on Exhibit D not specifically mentioned therein may be included as a part of this Agreement upon written approval of Agency, which approval will not be unreasonably withheld. Construction of the Project must include the following railroad work by BNSF: (a) Procurement of materials, equipment and supplies necessary for the railroad work; (b) Preliminary engineering, design, and contract preparation; (c) Furnishing of flagging services during construction of the Project as required and set forth in further detail on Exhibit C, attached to this Agreement and made a part hereof; (d) Furnishing engineering and inspection as required in connection with the construction of the Project; (d) Installation of one 56-foot concrete crossing surface for the one track complete with new rail, ties, ballast, fasteners, along with appropriate surfacing, to carry the improved roadway and sidewalks; (e) Installation of Crossing Signal Equipment and Crossing Signal Control House as shown on Exhibit A ; Bayou Willow Parkway C&M Agreement(12/30/2009) Page 2 Form 0118 Rev. 12/28/09 (f) Make such changes in the alignment, location and elevation of its telephone, telegraph, signal and/or wire lines and appurtenances along, over or under the tracks, both temporary and permanent, as may become necessary by reason of the construction of the Project. 3. BNSF will do all railroad work set forth in Article II, Section 2 above on an actual cost basis,when BNSF, in its sole discretion, determines it is required by its labor agreements to perform such work with its own employees working under applicable collective bargaining agreements. 4. Agency agrees to reimburse BNSF for work of an emergency nature caused by Agency or Agency's contractor in connection with the Project which BNSF deems is reasonably necessary for the immediate restoration of railroad operations, or for the protection of persons or BNSF property. Such work may be performed by BNSF without prior approval of Agency and Agency agrees to fully reimburse BNSF for all such emergency work. 5. BNSF may charge Agency for insurance expenses, including self-insurance expenses, when such expenses cover the cost of Employer's Liability (including, without limitation, liability under the Federal Employer's Liability Act) in connection with the construction of the Project. Such charges will be considered part of the actual cost of the Project, regardless of the nature or amount of ultimate liability for injury, loss or death to BNSF's employees, if any. 6. During the construction of the Project, BNSF will send Agency progressive invoices detailing the costs of the railroad work performed by BNSF under this Agreement. Agency must reimburse BNSF for completed force-account work within thirty (30) days of the date of the invoice for such work. Upon completion of the Project, BNSF will send Agency a detailed invoice of final costs, segregated as to labor and materials for each item in the recapitulation shown on Exhibit D. Pursuant to this section and Article IV, Section 7 herein, Agency must pay the final invoice within ninety (90) days of the date of the final invoice. BNSF will assess a finance charge of .033% per day (12% per annum) on any unpaid sums or other charges due under this Agreement which are past its credit terms. The finance charge continues to accrue daily until the date payment is received by BNSF, not the date payment is made or the date postmarked on the payment. Finance charges will be assessed on delinquent sums and other charges as of the end of the month and will be reduced by amounts in dispute and any unposted payments received by the month's end. Finance charges will be noted on invoices sent to Agency under this section. 7. Upon completion of construction of the Project, BNSF will, at its sole cost and expense, operate and maintain the Crossing Signal Equipment, Crossing Signal Control House, and the new crossing surfaces, from end-of-tie to end-of-tie, in proper condition. ARTICLE III—AGENCY OBLIGATIONS In consideration of the covenants of BNSF set forth herein and the faithful performance thereof, Agency agrees as follows: 1. Agency must furnish to BNSF plans and specifications for the Project. Said plans (reduced size 11" x 17"), showing the plan and profile of the roadway work on BNSF right-of-way and marked as Exhibit A, attached hereto and made a part hereof, must be submitted to BNSF for the development of railroad cost estimates. 2. Agency must make any required application and obtain all required permits and approvals for the construction of the Project. 3. Agency must acquire all rights of way necessary for the construction of the Project. 4. Agency must make any and all arrangements for the installation or relocation of wire lines, pipe lines and other facilities owned by private persons, companies, corporations, political subdivisions or public utilities other than BNSF which may be necessary for the construction of the Project. Bayou Willow Parkway C&M Agreement(12/30/2009) Page 3 Form 0118 Rev. 12128/09 r 5. Agency must construct the Project as shown on the attached Exhibit A and do all work("Agency's Work") provided for in the plans and specifications for the Project, except railroad work that will be performed by BNSF hereunder. Agency must furnish all labor, materials, tools and equipment for the performance of Agency's Work. The principal elements of Agency's Work are as follows: (a) Design and construction of Bayou Willow Parkway; (b) Installation of a pavement marking stop bar in accordance with the Manual on Uniform Traffic Control Devices(hereinafter called, "MUTCD"); (c) Installation of advance warning signs in accordance with the MUTCD (d) Perform all necessary grading and paving, including backfill of excavations and restoration of disturbed vegetation on BNSF's right-of-way; (e) Provide suitable drainage, both temporary and permanent; (f) Provide all barricades, lights, flagmen or traffic control devices necessary for preventing vehicular traffic from using a portion of the Crossing, during the installation of the concrete crossing surfaces, and also during the installation of the Crossing Signal Equipment; (g) Construct concrete roadway surface on approaches to each track; (h) Job site cleanup including removal of all construction materials, concrete debris, surplus soil, refuse, contaminated soils, asphalt debris, litter and other waste materials to the satisfaction of BNSF; 6. The Agency will approve the location of the signals and signal bungalow prior to the installation by BNSF. 7. The Agency must have advanced railroad crossing signs and standard pavement markings in place at the crossing shown on Exhibit A (if the same are required by the MUTCD) prior to the acceptance of this Project by the Agency. 8. The Agency must give BNSF's Manager Public Projects written notice to proceed ("Notice to Proceed")with the railroad portion of the work after receipt of necessary funds for the Project. BNSF will not begin the railroad work(including, without limitation, procurement of supplies, equipment or materials) until written notice to proceed is received from Agency. 9. The Agency's Work must be performed by Agency or Agency's contractor in a manner that will not endanger or interfere with the safe and timely operations of BNSF and its facilities. 10. For any future inspection or maintenance, either routine or otherwise, performed by subcontractors on behalf of the Agency, the Agency shall require the subcontractors to execute the C documents. Prior to performing any future maintenance with its own personnel, the Agency shall: comply with all of BNSF's applicable safety rules and regulations; require any Agency employee performing maintenance to complete the safety training program at the BNSF's Internet Website "contractororientation.com"; notify BNSF when, pursuant to the requirements of exhibit C, a flagger is required to be present; procure, and have approved by BNSF's Risk Management Department, Railroad Protective Liability insurance. 11. Agency must require its contractor(s) to notify BNSF's Roadmaster at least thirty (30) calendar days prior to requesting a BNSF flagman in accordance with the requirements of Exhibit C attached hereto. Additionally, Agency must require its contractor(s) to notify BNSF's Manager of Public Projects thirty(30)calendar days prior to commencing work on BNSF property or near BNSF tracks. Bayou Willow Parkway C&M Agreement(12/30/2009) Page 4 Form 0118 Rev. 12/28/09 12. Agency must include the following provisions in any contract with its contractor(s) performing work on said Project: (a) The Contractor is placed on notice that fiber optic, communication and other cable lines and systems (collectively, the "Lines") owned by various telecommunications companies may be buried on BNSF's property or right-of-way. The locations of these Lines have been included on the plans based on information from the telecommunications companies. The contractor will be responsible for contacting BNSF's Communications Network Control Center at 800-533-2891, BNSF's Signal Representative (Supervisor Signals-Construction) at 817-740-7384, and the telecommunications companies and notifying them of any work that may damage these Lines or facilities and/or interfere with their service. The contractor must also mark all Lines shown on the plans or marked in the field in order to verify their locations. The contractor must also use all reasonable methods when working in the BNSF right-of-way or on BNSF property to determine if any other Lines (fiber optic, cable, communication or otherwise)may exist. (b) Failure to mark or identify these Lines will be sufficient cause for BNSF's engineering representative to stop construction at no cost to the Agency or BNSF until these items are completed. In addition to the liability terms contained elsewhere in this Agreement, the contractor hereby indemnifies, defends and holds harmless BNSF for, from and against all cost, liability, and expense whatsoever (including, without limitation, attorney's fees and court costs and expenses) arising out of or in any way contributed to by any act or omission of Contractor, its subcontractors, agents and/or employees that cause or in any way or degree contribute to (1) any damage to or destruction of any Lines by Contractor, and/or its subcontractors, agents and/or employees, on BNSF's property or within BNSF's right-of-way, (2) any injury to or death of any person employed by or on behalf of any telecommunications company, and/or its contractor, agents and/or employees, on BNSF's property or within BNSF's right-of-way, and/or (3) any claim or cause of action for alleged loss of profits or revenue by,or loss of service by a customer or user of such telecommunication company(ies).THE LIABILITY ASSUMED BY CONTRACTOR WILL NOT BE AFFECTED BY THE FACT, IF IT IS A FACT, THAT THE DAMAGE, DESTRUCTION, INJURY, DEATH, CAUSE OF ACTION OR CLAIM WAS OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF BNSF, ITS AGENTS, SERVANTS, EMPLOYEES OR OTHERWISE, EXCEPT TO THE EXTENT THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE INTENTIONAL MISCONDUCT OR GROSS NEGLIGENCE OF BNSF. (c) The Contractor will be responsible for the rearrangement of any facilities or Lines determined to interfere with the construction. The Contractor must cooperate fully with any telecommunications company(ies) in performing such rearrangements. 13. Agency must require compliance with the obligations set forth in this agreement, including Exhibit C and Exhibit C-1, and incorporate in each prime contract for construction of the Project, or the specifications therefore(i)the provisions set forth in Article III; (ii)the provisions set forth in Article IV; and (iii) the provisions set forth in Exhibit C and Exhibit C-I, attached hereto and by reference made a part hereof. 14. Except as otherwise provided below in this Section 13, all construction work performed hereunder by Agency for the Project will be pursuant to a contract or contracts to be let by Agency, and all such contracts must include the following: (a) All work performed under such contract or contracts within the limits of BNSF's right-of- way must be performed in a good and workmanlike manner in accordance with plans and specifications approved by BNSF; (b) Changes or modifications during construction that affect safety or BNSF operations must be subject to BNSF's approval; Bayou Willow Parkway C&M Agreement(12/3012009) Page 5 Form 0118 Rev. 12/28/09 (c) No work will be commenced within BNSF's right-of-way until each of the prime contractors employed in connection with said work must have (i) executed and delivered to BNSF a letter agreement in the form of Exhibit C-I, and (ii) delivered to and secured BNSF's approval of the required insurance; and (d) If it is in Agency's best interest, Agency may direct that the construction of the Project be done by day labor under the direction and control of Agency, or if at any time, in the opinion of Agency, the contractor has failed to prosecute with diligence the work specified in and by the terms of said contract, Agency may terminate its contract with the contractor and take control over the work and proceed to complete the same by day labor or by employing another contractor(s) provided; however, that any contractor(s) replacing the original contractor(s) must comply with the obligations in favor of BNSF set forth above and, provided further, that if such construction is performed by day labor, Agency will, at its expense, procure and maintain on behalf of BNSF the insurance required by Exhibit C-1. (e) To facilitate scheduling for the Project, Agency shall have its contractor give BNSF's Roadmaster 90 days advance notice of the proposed times and dates for work windows. BNSF and Agency's contractor will establish mutually agreeable work windows for the Project. BNSF has the right at any time to revise or change the work windows, due to train operations or service obligations. BNSF will not be responsible for any additional costs and expenses resulting from a change in work windows. Additional costs and expenses resulting from a change in work windows shall be accounted for in the contractor's expenses for the Project. 15. Agency must advise the appropriate BNSF Manager Public Projects and the City's Public Works Director, in writing, of the completion date of the Project within thirty(30)days after such completion date. Additionally, Agency must notify BNSF's Manager Public Projects, in writing, of the date on which Agency and/or its Contractor will meet with BNSF for the purpose of making final inspection of the Project. 16. TO THE FULLEST EXTENT PERMITTED BY LAW, AGENCY HEREBY RELEASES, INDEMNIFIES, DEFENDS AND HOLDS HARMLESS BNSF, ITS AFFILIATED COMPANIES, PARTNERS, SUCCESSORS, ASSIGNS, LEGAL REPRESENTATIVES, OFFICERS, DIRECTORS, SHAREHOLDERS, EMPLOYEES AND AGENTS FOR, FROM AND AGAINST ANY AND ALL CLAIMS, LIABILITIES, FINES, PENALTIES, COSTS, DAMAGES, LOSSES, LIENS, CAUSES OF ACTION, SUITS, DEMANDS, JUDGMENTS AND EXPENSES (INCLUDING, WITHOUT LIMITATION, COURT COSTS AND ATTORNEYS' FEES) OF ANY NATURE, KIND OR DESCRIPTION OF ANY PERSON (INCLUDING, WITHOUT LIMITATION, THE EMPLOYEES OF THE PARTIES HERETO) OR ENTITY DIRECTLY OR INDIRECTLY ARISING OUT OF, RESULTING FROM OR RELATED TO (IN WHOLE OR IN PART) (1) THE USE, OCCUPANCY OR PRESENCE OF AGENCY, ITS CONTRACTORS, SUBCONTRACTORS, EMPLOYEES OR AGENTS IN, ON, OR ABOUT THE CONSTRUCTION SITE, (11) THE PERFORMANCE, OR FAILURE TO PERFORM BY THE AGENCY, ITS CONTRACTORS, SUBCONTRACTORS, EMPLOYEES, OR AGENTS, ITS WORK OR ANY OBLIGATION UNDER THIS AGREEMENT, (111) THE SOLE OR CONTRIBUTING ACTS OR OMISSIONS OF AGENCY, ITS CONTRACTORS, SUBCONTRACTORS, EMPLOYEES, OR AGENTS IN, ON, OR ABOUT THE CONSTRUCTION SITE, (IV) AGENCY'S BREACH OF THE TEMPORARY CONSTRUCTION LICENSE OR EASEMENT GRANTED TO AGENCY PURSUANT TO ARTICLE II OF THIS AGREEMENT, (V) ANY RIGHTS OR INTERESTS GRANTED TO AGENCY PURSUANT TO THE TEMPORARY CONSTRUCTION LICENSE OR EASEMENT DISCUSSED IN ARTICLE II OF THIS AGREEMENT, (VI) AGENCY'S OCCUPATION AND USE OF BNSF'S PROPERTY OR RIGHT-OF-WAY, INCLUDING, WITHOUT LIMITATION, SUBSEQUENT MAINTENANCE OF THE STRUCTURE BY AGENCY, OR(VII) AN ACT OR OMISSION OF AGENCY OR ITS OFFICERS, AGENTS, INVITEES, EMPLOYEES OR CONTRACTORS OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY ANY OF THEM, OR ANYONE THEY CONTROL OR EXERCISE CONTROL OVER. THE LIABILITY ASSUMED BY AGENCY WILL NOT BE AFFECTED BY THE FACT, IF IT IS A FACT, THAT THE DAMAGE, DESTRUCTION, INJURY OR DEATH WAS OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF BNSF, ITS AGENTS, SERVANTS, EMPLOYEES OR OTHERWISE, EXCEPT TO Bayou Willow Parkway C&M Agreement(12/30/2009) Page 6 Form 0118 Rev. 12/28/09 1 THE EXTENT THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE INTENTIONAL MISCONDUCT OR GROSS NEGLIGENCE OF BNSF. 17. Agency must take all necessary actions to permanently close, vacate, and abandon,the roadway crossing the right of way known as Private/Field Road, Milepost 71.45, DOT No. 023738T, Line Segment 7505, Silsbee Subdivision, Gulf Division prior to the start of construction of said new Bayou Willow Parkway at-grade crossing. 18. Agency must perform all necessary work to obtain the permanent closure, vacation, and removal of the at-grade crossing known as Private/Field Road, Milepost 71.45, DOT No. 023738T, Line Segment 7505, Silsbee Subdivision, Gulf Division across BNSF's right-of-way and must barricade and remove the road approaches within 3 days of opening of the new at-grade crossing to vehicular traffic. BNSF will cooperate with Agency to achieve the closures and vacations and will remove the crossing surface within its right-of-way. If Agency's work for both closures and vacations is not completed after 3 days of opening the new at-grade crossing, Agency authorizes BNSF to complete the necessary closure work, at the Agency's expense. Agency agrees to fully reimburse BNSF for all such work. ARTICLE IV—CITY OBLIGATIONS In consideration of the covenants of BNSF set forth herein and the faithful performance thereof, City agrees as follows: 1. For any future inspection or maintenance, either routine or otherwise, performed by subcontractors on behalf of the City, the City shall require the subcontractors to execute the C documents. Prior to performing any future maintenance with its own personnel, the City shall: comply with all of BNSF's applicable safety rules and regulations; require any City employee performing maintenance to complete the safety training program at the BNSF's Internet Website "contractororientation.com"; notify BNSF when, pursuant to the requirements of exhibit C, a flagger is required to be present; procure, and have approved by BNSF's Risk Management Department, Railroad Protective Liability insurance. 2. In addition to the terms and conditions set forth elsewhere in this Agreement, the City agrees to the following terms upon completion of construction of the Project: (a) City will own and be fully responsible for repairs, maintenance, future construction or reconstruction of the Bayou Willow Parkway roadway. (b) City will maintain the elevation of the Bayou Willow Parkway roadway approaches to match the elevation on the railroad track crossing surfaces and to be no more than three (3)inches above or six(6) inches below top-of-rail elevation at a distance measured thirty (30)feet from the nearest rail. (c) City will maintain the advanced railroad crossing warning signs and pavement markings and, to the fullest extent allowed by the Laws and the Constitution of the State of Texas, agrees to hold harmless and indemnify BNSF for any claims, damages or losses, in whole or in part, caused by or due to the City's failure to maintain the advanced warning signs and markings or other requirements of the MUTCD. (d) City will do nothing and permit nothing to be done in the maintenance of the Bayou Willow Parkway roadway, which will interfere with or endanger facilities of BNSF. (e) Notwithstanding the provision of Article II, Section 7(a), if any regulations, ordinances, acts, rules or other laws subsequently passed or amended by the City or any other governmental or legislative authority increase the City's portion of maintenance cost under this Agreement, BNSF will receive the benefit of any such regulations, ordinances, acts, rules or other laws and the City's increased portion of maintenance costs will be incorporated into and made a part of this Agreement. Bayou Willow Parkway CAM Agreement(12/30/2009) Page 7 Form 0118 Rev. 12/28/09 (f) It is expressly understood by the City and BNSF that any right to install utilities will be governed by a separate permit or license agreement between the parties hereto. 3. The City must notify and obtain prior authorization from BNSF's Manager of Public Projects before entering BNSF's right-of-way for Inspection and Maintenance purposes and the BNSF Manager of Public Projects will determine if flagging is required. If the construction work hereunder is contracted, City must require its prime contractor(s)to comply with the obligations set forth in Exhibit C and Exhibit C- 1, as the same may be revised from time to time. The parties hereto acknowledge that no party is an agent, servant, or employee of any of the other parties, and each party agrees it is responsible for its own individual acts and deeds as well as the acts and deeds of its contractors, agents, representatives, and employees during performance of contract work. ARTICLE V—JOINT OBLIGATIONS IN CONSIDERATION of the premises, the parties hereto mutually agree to the following: 1. All work contemplated in this Agreement must be performed in a good and workmanlike manner and each portion must be promptly commenced by the party obligated hereunder to perform the same and thereafter diligently prosecuted to conclusion in its logical order and sequence. Furthermore, any changes or modifications during construction which affect BNSF will be subject to BNSF's approval prior to the commencement of any such changes or modifications. 2. The work hereunder must be done in accordance with the Exhibit A and the detailed plans and specifications approved by BNSF. 3. Agency must require its contractor(s)to reasonably adhere to the Project's construction schedule for all Project work. The parties hereto mutually agree that BNSF's failure to complete the railroad work in accordance with the construction schedule due to inclement weather or unforeseen railroad emergencies will not constitute a breach of this Agreement by BNSF and will not subject BNSF to any liability. Regardless of the requirements of the construction schedule, BNSF reserves the right to reallocate the labor forces assigned to complete the railroad work in the event of an emergency to provide for the immediate restoration of railroad operations (BNSF or its related railroads) or to protect persons or property on or near any BNSF owned property. BNSF will not be liable for any additional costs or expenses resulting from any such reallocation of its labor forces. The parties mutually agree that any reallocation of labor forces by BNSF pursuant to this provision and any direct or indirect consequences or costs resulting from any such reallocation will not constitute a breach of this Agreement by BNSF. 4. BNSF will have the right to stop construction work on the Project if any of the following events take place: (i) Agency (or any of its contractors) performs the Project work in a manner contrary to the plans and specifications approved by BNSF; (ii) Agency (or any of its contractors), in BNSF's opinion, prosecutes the Project work in a manner which is hazardous to BNSF property, facilities or the safe and expeditious movement of railroad traffic; or (iii) the insurance described in the attached Exhibit C-1 is canceled during the course of the Project. The work stoppage will continue until all necessary actions are taken by Agency or its contractor to rectify the situation to the satisfaction of BNSF's Division Engineer or until additional insurance has been delivered to and accepted by BNSF. Any such work stoppage under this provision will not give rise to any liability on the part of BNSF. BNSF's right to stop the work is in addition to any other rights BNSF may have including, but not limited to, actions or suits for damages or lost profits. In the event that BNSF desires to stop construction work on the Project, BNSF agrees to immediately notify the following individual in writing: Claudine Starita Parsons Project Manager 3395 Harrison Avenue Beaumont, Texas 77706 Bayou Willow Parkway C&M Agreement(12130/2009) Page 8 Form 0118 Rev.12/28/09 5. Agency must supervise and inspect the operations of all Agency contractors to assure compliance with the plans and specifications approved by BNSF, the terms of this Agreement and all safety requirements of the BNSF railroad. If BNSF determines that proper supervision and inspection is not being performed by Agency personnel at any time during construction of the Project, BNSF has the right to stop construction (within or adjacent to its operating right-of-way). Construction of the Project will not proceed until Agency corrects the situation to BNSF's reasonable satisfaction. If BNSF feels the situation is not being corrected in an expeditious manner, BNSF will immediately notify Claudine Starita, Parsons Proiect Manager for appropriate corrective action. 6. Pursuant to this section and Article II, Section 6 herein,Agency must, out of funds made available to it for the construction of the Project", reimburse BNSF in full for the actual costs of all work performed by BNSF under this Agreement. 7. All expenses detailed in statements sent to Agency pursuant to Article II, Section 6 herein will comply with the terms and provisions of the Federal Aid Highway Program Manual, U.S. Department of Transportation, as amended from time to time, which manual is hereby incorporated into and made a part of this Agreement by reference. The parties mutually agree that BNSF's preliminary engineering, design, and contract preparation costs described in Article II, Section 2 herein are part of the costs of the Project even though such work may have preceded the date of this Agreement. 8. The construction of the Project will not commence until Agency gives BNSF's Manager Public Projects thirty (30) days prior written notice of such commencement. The commencement notice will reference BNSF's file number 023805 and D.O.T. Crossing No. 023805K and must state the time that construction activities will begin. 9. If a railway or highway improvement project necessitates rearrangement, relocation, or alteration of the Crossing Signal Equipment, Crossing Signal House, or the new crossing surface installed hereunder, the costs for such rearrangement, relocation or alteration will be the responsibility of the party requesting such changes 10. If the Crossing Signal Equipment and/or Crossing Signal House installed hereunder cannot, through age, be maintained, or by virtue of its obsolescence, requires replacement,the cost of installation of the new crossing signal equipment and/or new crossing signal house will be negotiated by the parties hereto on the basis of the current Federal Aid Railroad Signal Program participation and applicable Agency at the time of such replacement is warranted 11. Any books, papers, records and accounts of the parties hereto relating to the work hereunder or the costs or expenses for labor and material connected with the construction will at all reasonable times be open to inspection and audit by the agents and authorized representatives of the parties hereto, as well as the State of Texas and the Federal Highway Administration, for a period of one(1) year from the date of the final BNSF invoice under this Agreement. 12. The covenants and provisions of this Agreement are binding upon and inure to the benefit of the successors and assigns of the parties hereto. Notwithstanding the preceding sentence, neither party hereto may assign any of its rights or obligations hereunder without the prior written consent of the other party. 13. In the event construction of the Project does not commence within twelve (12) months of the Effective Date, this Agreement will become null and void. 14. Neither termination nor expiration of this Agreement will release either party from any liability or obligation under this Agreement, whether of indemnity or otherwise, resulting from any acts, omissions or events happening prior to the date of termination or expiration. 15. To the maximum extent possible, each provision of this Agreement will be interpreted in such a manner as to be effective and valid under applicable law. If any provision of this Agreement is prohibited by, or held to be invalid under, applicable law, such provision will be ineffective solely to the extent of such prohibition or invalidity and the remainder of the provision will be enforceable. Bayou Willow Parkway C&M Agreement(12/30/2009) Page 9 Form 0118 Rev.12128/09 16. This Agreement (including exhibits and other documents, manuals, etc. incorporated herein) is the full and complete agreement between BNSF, the Agency, and the City with respect to the subject matter herein and supersedes any and all other prior agreements between the parties hereto. The parties further agree that all existing agreements between the BNSF, the Agency, and the City concerning licenses, permits, leases or easements at this location shall remain in full force and effect. To the extent that property is referred to as being the 'Railroad property," "Railroad right of way,"or other such notation, such reference does not change the legal status of such property as it exists on the date of executing this Agreement and such terms are simply used to reference the property where the Project is to be constructed as of the Effective Date. 17. Any notice provided for herein or concerning this Agreement must be in writing and will be deemed sufficiently given when sent by certified mail, return receipt requested, to the parties at the following addresses: BNSF Railway Company: BNSF Manager Public Projects 5800 North Main Street Saginaw,Texas 76179 Agency: BISD Superintendent 3395 Harrison Avenue Beaumont,Texas 77706 City: Public Works Director 801 Main Street P.O. Box 3827 Beaumont,Texas 77704-3827 Bayou Willow Parkway C&M Agreement(12/30/2009) Page 10 Form 0118 Rev. 12/28/09 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by its duly qualified and authorized officials as of the day and year first above written. BNSF RAILWAY COMPANY By: Printed Name: J. Lyn Hartley Title: Director Public Projects AGENCY BEAUMONT INDEPENDENT SCHOOL DISTRICT By: Printed Name: Dr. Carrol Thomas Title: BISD Superintendent WITNESS: CITY CITY OF BEAUMONT,TEXAS By: Printed Name: Title: WITNESS: Bayou Willow Parkway C&M Agreement(12/30/2009) Page 11 Form 0118 Rev.12/28/09 A O I o o D 0 N • N m A n O O p o � B D I� C z. o A 1.A Z: Sy 4 dr I O O: i M 1 � i Downs Rd f r (D ^07 r�i V b O N ED Phelps Rd w 0 .0r d ° r: Q ✓�, n �N a 0'.\PROJECTS\08217 BISO AIh1 Cpmpler\Gird\IRSL 6\8217-76C600.Cwg App 17,2008 11 32— Fittz&Shipman BIsD MULTI—PURPOSE CENTER SHEET N0 INC. PROJECT HAKE: Bayou Willow Parkway at BNSF Railway EX-A Eb--w F.gr—and La S-wym RAILROAD MILE POST 71.31 1105 CORNERSTONE COURT,BEAUMONT,TEXAS PERMIT LOCATION MAP PROJECT NO (109)832-7238 FAX(109)932-7303 BEAUMONT, TEXAS D8247 DATE:4/16/09 V. Bayou Wdlow Parkway 1 131, 941 T.7-1 Oli ma IFINNIIINNII sm Plan & Profile ie-in Detail 21: to lu EXHIBIT A Layout Bayou Willow Parkway @ BNSF Ratiroad Milepost 71 30 4 in Beaumont,Texas 47' B—B 46' F—F 28.5' 18.5' 8` CONCRETE 0 LOCATION FOR — qt _...... ..-- ---- ,I __._ ..._..._OR �....OX R6 .._.._._.... ,ray TO 1 T 5' 0' #3 BARS 0 18 O.0 E W '� fi f>_, PREPARED SUB GRADE COMPACTED STRUCTURAL NOTES: 1. REMOVE VEGETATION, EXCAVATE, GRADE AND PROOF FILL EMBANKMENT ROLL PER TxDOT SPECIFICATION. REMOVE SOFT SPOTS. FILL WITH STRUCTURAL FILL COMPACT. 2. HYDROMULEN SEED ALL DISTURBED AREAS BEHIND CURB. i i i 1 i i EXHIBIT A PAVEMENT SECTION Within BNSF Right of Way . BISD MULTI PURPOSE CENTER SHEET "°' Fpman :______ ________ _______________ _ _ _ __ ._ ___ __.. - Ex-C INC.. Bayou Willow Parkway Consa I*WFnqIr—andl.andSwwyom PERMIT VICINITY MAP 1405 CORNERSTONE COURT, BEAUMONT, TEXAS BEAUMONT, TEXAS PROJECT N0. (409) 832-7238 FAX (409) 832-7303 08247 3-20-09 I I� TO ENO OF TRACK The Burlington Northern & Santa Fe Railway Company II TO BEAUMONi TX {,LC EASTWARD PPR.1027'MPH 120'MIN. WESTWARD APPR.1027' I II I{� 20 MPH 50'MIN.---�7 24 l�50'MIN. I BAYOU WILLOW PARKWAY DDT 023 805 K INSTALL: GATES & FLASHERS CONTROL DEVICES: CONSTANT WARNING - OUT SALVAGE: NONE INSTRUMENT HOUSE EXHIBIT A-RR Signal Sketch a BELL BNSF RAILWAY CO. METER BEAUMONT, TX. BAYOU WILLOW PARKWAY>> • CROSSING CONTROLL CONNECTIONS Warning device placement: LS: 7505 BIDIRECTIONAL CROSSING CONTROL Clearance to C.L. Track = Min. 12' M.P. 71.30 D UNIDIRECTIONAL CROSSING CONTROL Edge of Road to C.L.Foundation: in 3 i DOT " 023 805 K 4 with curb. Min.8'3'Without curb, DIVISION GULF Max.12' SUBDIVISION SILSBEE A COUPLER OR TERMINATION House Clearance: 25'Min. to Near Roil KANSAS CITY 30'Min. to Edge of Road NO SCALE ALL LIGHTS TO BE LED DATE: 06/26/09 l GUARD RAIL FILE: 7505071-30.dgn DDF/DDF 7505071_30.dgn 6/30/2009 8:12:36 AM EXHIBIT "C" CONTRACTOR REQUIREMENTS 1.01 General • 1.01.01 The Contractor must cooperate with BNSF RAILWAY COMPANY, hereinafter referred to as "Railway" where work is over or under on or adjacent to Railway property and/or right-of-way, hereafter referred to as "Railway Property", during the construction of Bayou Willow Parkway (DOT No.023805K)at railroad milepost 71.30 in Beaumont,Texas. • 1.01.02 The Contractor must execute and deliver to the Railway duplicate copies of the Exhibit "C-1" Agreement, in the form attached hereto, obligating the Contractor to provide and maintain in full force and effect the insurance called for under Section 3 of said Exhibit"C-1". Questions regarding procurement of the Railroad Protective Liability Insurance should be directed to Rosa Martinez at Marsh,USA,214-303-8519. • 1.01.03 The Contractor must plan, schedule and conduct all work activities so as not to interfere with the movement of any trains on Railway Property. • 1.01.04 The Contractor's right to enter Railway's Property is subject to the absolute right of Railway to cause the Contractor's work on Railway's Property to cease if, in the opinion of Railway,Contractor's activities create a hazard to Railway's Property, employees, and/or operations. Railway will have the right to stop construction work on the Project if any of the following events take place: (i) Contractor (or any of its subcontractors) performs the Project work in a manner contrary to the plans and specifications approved by Railway; (ii) Contractor(or any of its subcontractors), in Railway's opinion, prosecutes the Project work in a manner which is hazardous to Railway property, facilities or the safe and expeditious movement of railroad traffic; (iii) the insurance described in the attached Exhibit C-1 is canceled during the course of the Project; or(iv)Contractor fails to pay Railway for the Temporary Construction License or the Easement. The work stoppage will continue until all necessary actions are taken by Contractor or its subcontractor to rectify the situation to the satisfaction of Railway's Division Engineer or until additional insurance has been delivered to and accepted by Railway. In the event of a breach of(i) this Agreement, (ii) the Temporary Construction License, or (iii) the Easement, Railway may immediately terminate the Temporary Construction License or the Easement. Any such work stoppage under this provision will not give rise to any liability on the part of Railway. Railway's right to stop the work is in addition to any other rights Railway may have including,but not limited to, actions or suits for damages or lost profits. In the event that Railway desires to stop construction work on the Project, Railway agrees to immediately notify the following individual in writing: Claudine Starita Parsons Project Manager 3395 Harrison Ave Beaumont,Texas 77706 • 1.01.05 The Contractor is responsible for determining and complying with all Federal, State and Local Governmental laws and regulations, including, but not limited to environmental laws and regulations(including but not limited to the Resource Conservation and Recovery Act, as amended; the Clean Water Act, the Oil Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health and safety laws and regulations. The Contractor hereby indemnifies, defends and holds harmless Railway for, from and against all fines or penalties imposed or assessed by Federal, State and Local Govemmental Agencies against the Railway which arise out of Contractor's work under this Agreement. • 1.01.06 The Contractor must notify the Beaumont ISD at (409) 617-5781 and Railway's Manager Public Projects, telephone number 817-352-2902 at least thirty (30) calendar days before commencing any work on Railway Property. Contractors notification to Railway,must refer to Railroad's file 023805K. Bayou Willow Parkway—Exhibit C(10/06/09) 1 • 1.01.07 For any bridge demolition and/or falsework above any tracks or any excavations located with any part of the excavations located within, whichever is greater, twenty-five(25) feet of the nearest track or intersecting a slope from the plane of the top of rail on a 2 horizontal to I vertical slope beginning at eleven (11) feet from centerline of the nearest track, both measured perpendicular to center line of track, the Contractor must furnish the Railway five sets of working drawings showing details of construction affecting Railway Property and tracks. The working drawing must include the proposed method of installation and removal of falsework, shoring or cribbing, not included in the contract plans and two sets of structural calculations of any falsework, shoring or cribbing. For all excavation and shoring submittal plans, the current"BNSF-UPRR Guidelines for Temporary Shoring"must be used for determining the design loading conditions to be used in shoring design, and all calculations and submittals must be in accordance with the current "BNSF-UPRR Guidelines for Temporary Shoring". All submittal drawings and calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located. All calculations must take into consideration railway surcharge loading and must be designed to meet American Railway Engineering and Maintenance-of-Way Association (previously known as American Railway Engineering Association) Coopers E-80 live loading standard. All drawings and calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located.The Contractor must not begin work until notified by the Railway that. plans have been approved. The Contractor will be required to use lifting devices such as, cranes and/or winches to place or to remove any falsework over Railway's tracks. In no case will the Contractor be relieved of responsibility for results obtained by the implementation of said approved plans. • 1.01.08 Subject to the movement of Railway's trains,Railway will cooperate with the Contractor such that the work may be handled and performed in an efficient manner. The Contractor will have no claim whatsoever for any type of damages or for extra or additional compensation in the event his work is delayed by the Railway. 1.02 Contractor Safety Orientation • 1.02.01 No employee of the Contractor,its subcontractors,agents or invitees may enter Railway Property without first having completed Railway's Engineering Contractor Safety Orientation,found on the web site www.contractororientation.com. The Contractor must ensure that each of its employees, subcontractors, agents or invitees completes Railway's Engineering Contractor Safety Orientation through internet sessions before any work is performed on the Project. Additionally, the Contractor must ensure that each and every one of its employees,subcontractors,agents or invitees possesses a card certifying completion of the Railway Contractor Safety Orientation before entering Railway Property. The Contractor is responsible for the cost of the Railway Contractor Safety Orientation. The Contractor must renew the Railway Contractor Safety Orientation annually. Further clarification can be found on the web site or from the Railway's Representative. 1.03 Railway Requirements • 1.03.01 The Contractor must take protective measures as are necessary to keep railway facilities, including track ballast, free of sand, debris, and other foreign objects and materials resulting fi•om his operations. Any damage to railway facilities resulting from Contractor's operations will be repaired or replaced by Railway and the cost of such repairs or replacement must be paid for by the Agency. • 1.03.02 The Contractor must notify the Railway's Division General Manager at 281-350-7781 and provide blasting plans to the Railway for review seven (7) calendar days prior to conducting any blasting operations adjacent to or on Railway's Property. • 1.03.03 The Contractor must abide by the following temporary clearances during construction: ■ 15' Horizontally from centerline of nearest track ■ 21'-6" Vertically above top of rail ■ 27'-0" Vertically above top of rail for electric wires carrying less than 750 volts ■ 28'-0" Vertically above top of rail for electric wires carrying 750 volts to 15,000 volts • 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 volts Bayou Willow Parkway—Exhibit C (10/06/09) 2 ■ 34'4" Vertically above top of rail for electric wires carrying more than 20,000 volts • 1.03.04 Upon completion of construction,the following clearances shall be maintained: ■ 25' Horizontally from centerline of nearest track ■ 23'-3 ''/2" Vertically above top of rail • 1.03.05 Any infringement within State statutory clearances due to the Contractor's operations must be submitted to the Railway and to the Beaumont ISD and must not be undertaken until approved in writing by the Railway, and until the Beaumont ISD has obtained any necessary authorization from the State Regulatory Authority for the infringement. No extra compensation will be allowed in the event the Contractor's work is delayed pending Railway approval, and/or the State Regulatory Authority's approval. • 1.03.06 In the case of impaired vertical clearance above top of rail, Railway will have the option of installing tell-tales or other protective devices Railway deems necessary for protection of Railway operations,The cost of tell-tales or protective devices will be borne by the Agency. • 1.03.07 The details of construction affecting the Railway's Property and tracks not included in the contract plans must be submitted to the Railway by Beaumont ISD for approval before work is undertaken and this work must not be undertaken until approved by the Railway. • 1.03.08 At other than public road crossings, the Contractor must not move any equipment or materials across Railway's tracks until permission has been obtained from the Railway. The Contractor must obtain a "Temporary Construction Crossing Agreement" from the Railway prior to moving his equipment or materials across the Railways tracks. The temporary crossing must be gated and locked at all times when not required for use by the Contractor. The temporary crossing for use of the Contractor will be constructed and, at the completion of the project,removed at the expense of the Contractor. • 1.03.09 Discharge, release or spill on the Railway Property of any hazardous substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous waste is prohibited and Contractor must immediately notify the Railway's Resource Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess of a reportable quantity. Contractor must not allow Railway Property to become a treatment, storage or transfer facility as those terms are defined in the Resource Conservation and Recovery Act or any state analogue. • 1.03.10 The Contractor upon completion of the work covered by this contract, must promptly remove from the Railway's Property all of Contractor's tools, equipment, implements and other materials, whether brought upon said property by said Contractor or any Subcontractor, employee or agent of Contractor or of any Subcontractor, and must cause Railway's Property to be left in a condition acceptable to the Railway's representative. 1.04 Contractor Roadway Worker on Track Safety Program and Safety Action Plan • 1.04.01 Each Contractor that will perform work within 25 feet of the centerline of a track must develop and implement a Roadway Worker Protection/On Track Safety Program and work with Railway Project Representative to develop an on track safety strategy as described in the guidelines listed in the on track safety portion of the Safety Orientation. This Program must provide Roadway Worker protection/on track training for all employees of the Contractor, its subcontractors, agents or invitees. This training is reinforced at the job site through job safety briefings.Additionally,each Contractor must develop and implement the Safety Action Plan, as provided for on the web site www.contractororientation.coni, which will be made available to Railway prior to commencement of any work on Railway Property. During the performance of work, the Contractor must audit its work activities.The Contractor must designate an on-site Project Supervisor who will serve as the contact person for the Railway and who will maintain a copy of the Safety Action Plan, safety audits, and Material Safety Datasheets(MSDS),at the job site. • Contractor shall have a background investigation performed on all of its employees, subcontractors and agents Bayou Willow Parkway—Exhibit C(10/06/09) 3 who will be performing any services on railroad property under this Agreement. The background screening shall at a minimum meet the criteria defined by the e-RAILSAFE program outlined at lsafe,cgm in addition to any other applicable regulatory requirements.The e-RAILSAFE program uses rail industry background screening standards. Contractor shall obtain consent from all employees screened in compliance with the e-RAILSAFE program criteria to release completed background information to BNSF. Contractor shall be subject to periodic audit to ensure compliance. Contractor shall not permit any of its employees,subcontractors or agents to perform services on property hereunder who are not approved under e-RAILSAFE program standards. Railroad shall have the right to deny entry onto its premises to any of Contractor's employees, subcontractors or agents who do not display the authorized identification badge issued by a background screening service meeting the standards set forth for the e-RAILSAFE program or who pose a threat, in Railroad's reasonable opinion,to the safety or security of Railroad's operations. Contractors shall ensure its employees, subcontractors and agents are United States citizens or legally working in this country under a work VISA. 1.05 Railway Flagger Services: • 1.05.01 The Contractor must give Railway's Roadmaster Aaron Whitney at 337-572-2502 (office#)or 337- 303-4589 (cell #) a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger's position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements. • 1.05.02 Unless determined otherwise by Railway's Project Representative, Railway flagger will be required and furnished when Contractor's work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25-feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions: • 1.05.02a When,upon inspection by Railway's Representative, other conditions warrant. • 1.05.02b When any excavation is performed below the bottom of tie elevation,if, in the opinion of Railway's representative,track or other Railway facilities may be subject to movement or settlement. • 1.05.02c When work in any way interferes with the safe operation of trains at timetable speeds. • 1.05.02d When any hazard is presented to Railway track, communications, signal,electrical, or other facilities either due to persons,material,equipment or blasting in the vicinity. • 1.05.02e Special permission must be obtained from the Railway before moving heavy or cumbersome objects or equipment which might result in making the track impassable. • 1.05.03 Flagging services will be performed by qualified Railway flaggers. • 1.05.03a Flagging crew general ly consists of one employee. However, additional personnel may be required to protect Railway Property and operations, if deemed necessary by the Railways Representative. 1.05.03b Each time a flagger is called,the minimum period for billing will be the eight(8) hour basic day. • 1.05.03c The cost of flagger services provided by the Railway will be borne by the CONTRACTOR. The Bayou Willow Parkway—Exhibit C(10/06/09) 4 estimated cost for one(1) flagger is approximately $800.00 for an eight(8) hour basic day with time and one- half or double time for overtime, rest days and holidays. The estimated cost for each flagger includes vacation allowance, paid holidays, Railway and unemployment insurance, public liability and property damage insurance, health and welfare benefits, vehicle, transportation, meals, lodging, radio, equipment, supervision and other costs incidental to performing flagging services. Negotiations for Railway labor or collective bargaining agreements and rate changes authorized by appropriate Federal authorities may increase actual or estimated flagging rates. THE FLAGGING RATE IN EFFECT AT THE TIME OF PERFORMANCE BY THE CONTRACTOR HEREUNDER WILL BE USED TO CALCULATE THE ACTUAL COSTS OF FLAGGING PURSUANT TO THIS PARAGRAPH. • 1.05.03d The average train traffic on this route is 2 freight trains per 24-hour period at a timetable speed 20 MPH and no passenger trains. 1.06 Contractor General Safety Requirements • 1.06.01 Work in the proximity of railway track(s)is potentially hazardous where movement of trains and equipment can occur at any time and in any direction. All work performed by contractors within 25 feet of any track must be in compliance with FRA Roadway Worker Protection Regulations. • 1.06.02 Before beginning any task on Railway Property, a thorough job safety briefing must be conducted with all personnel involved with the task and repeated when the personnel or task changes. If the task is within 25 feet of any track, the job briefing must include the Railway's flagger, as applicable, and include the procedures the Contractor will use to protect its employees, subcontractors, agents or invitees from moving any equipment adjacent to or across any Railway track(s). • 1.06.03 Workers must not work within 25 feet of the centerline of any track without an on track safety strategy approved by the Railway's Project Representative. When authority is provided, every contractor employee must know: (1) who the Railway flagger is, and how to contact the flagger, (2) limits of the authority,(3)the method of communication to stop and resume work,and(4) location of the designated places of safety. Persons or equipment entering flag/work limits that were not previously job briefed, must notify the flagger immediately, and be given a job briefing when working within 25 feet of the center line of track. • 1.06.04 When Contractor employees are required to work on the Railway Property after normal working hours or on weekends,the Railroad's representative in charge of the project must be notified.A minimum of two employees must be present at all times. • 1.06.05 Any employees, agents or invitees of Contractor or its subcontractors under suspicion of being under the influence of drugs or alcohol,or in the possession of same, will be removed from the Railway's Property and subsequently released to the custody of a representative of Contractor management. Future access to the Railway's Property by that employee will be denied. • 1.06.06 Any damage to Railway Property, or any hazard noticed on passing trains must be reported immediately to the Railway's representative in charge of the project. Any vehicle or machine which may come in contact with track, signal equipment, or structure (bridge) and could result in a train derailment must be reported immediately to the Railway representative in charge of the project and to the Railway's Resource Operations Center at 1(800) 832-5452. Local emergency numbers are to be obtained from the Railway representative in charge of the project prior to the start of any work and must be posted at the job site. • 1.06.07 For safety reasons, all persons are prohibited from having pocket knives, firearms or other deadly weapons in their possession while working on Railway's Property. • 1.06.08 All personnel protective equipment (PPE) used on Railway Property must meet applicable OSHA and ANSI specifications. Current Railway personnel protective equipment requirements are listed on the web site, vv",w.conrraciororientation.corn, however, a partial list of the requirements include: a) safety glasses with permanently affixed side shields (no yellow lenses); b) hard hats c) safety shoe with: hardened toes, Bayou Willow Parkway—Exhibit C (10/06/09) 5 above-the-ankle lace-up and a defined heel; and d) high visibility retro-reflective work wear. The Railroad's representative in charge of the project is to be contacted regarding local specifications for meeting requirements relating to hi-visability work wear. Hearing protection, fall protection, gloves, and respirators must be worn as required by State and Federal regulations. (NOTE—Should there be a discrepancy between the information contained on the web site and the information in this paragraph,the web site will govern.) • 1.06.09 THE CONTRACTOR MUST NOT PILE OR STORE ANY MATERIALS, MACHINERY OR EQUIPMENT CLOSER THAN 25'-0" TO THE CENTER LINE OF THE NEAREST RAILWAY TRACK. MATERIALS, MACHINERY OR EQUIPMENT MUST NOT BE STORED OR LEFT WITHIN 250 FEET OF ANY HIGHWAY/RAIL AT-GRADE CROSSINGS OR TEMPORARY CONSTRUCTION CROSSING, WHERE STORAGE OF THE SAME WILL OBSTRUCT THE VIEW OF A TRAIN APPROACHING THE CROSSING. PRIOR TO BEGINNING WORK, THE CONTRACTOR MUST ESTABLISH A STORAGE AREA WITH CONCURRENCE OF THE RAILROAD'S REPRESENTATIVE. • 1.06.10 Machines or vehicles must not be left unattended with the engine running. Parked machines or equipment must be in gear with brakes set and if equipped with blade, pan or bucket, they must be lowered to the ground. All machinery and equipment left unattended on Railway's Property must be left inoperable and secured against movement. (See internet Engineering Contractor Safety Orientation program for more detailed specifications) • 1.06.11 Workers must not create and leave any conditions at the work site that would interfere with water drainage. Any work performed over water must meet all Federal,State and Local regulations. . • 1.06.12 All power line wires must be considered dangerous and of high voltage unless informed to the contrary by proper authority. For all power lines the minimum clearance between the lines and any part of the equipment or load must be; 200 KV or below - 15 feet;200 to 350 KV-20 feet; 350 to 500 KV-25 feet; 500 to 750 KV-35 feet; and 750 to 1000 KV-45 feet. If capacity of the line is not known, a minimum clearance of 45 feet must be maintained. A person must be designated to observe clearance of the equipment and give a timely warning for all operations where it is difficult for an operator to maintain the desired clearance by visual means. 1.07 Excavation • 1.07.01 Before excavating,the Contractor must determine whether any underground pipe lines, electric wires, or cables, including fiber optic cable systems are present and located within the Project work area. The Contractor must determine whether excavation on Railway's Property could cause damage to buried cables resulting in delay to Railway traffic and disruption of service to users. Delays and disruptions to service may cause business interruptions involving loss of revenue and profits. Before commencing excavation, the Contractor must contact BNSF's Roadmaster Aaron Whitney at 337-572-2502 and BNSF's Si2nal- Construction Supervisor Dwayne Tiffin at 817-740-7384. All underground and overhead wires will be considered HIGH VOLTAGE and dangerous until verified with the company having ownership of the line. It is the Contractor's responsibility to notify any other companies that have underground utilities in the area and arrange for the location of all underground utilities before excavating. • 1.07.02 The Contractor must cease all work and notify the Railway immediately before continuing excavation in the area if obstructions are encountered which do not appear on drawings. If the obstruction is a utility and the owner of the utility can be identified, then the Contractor-must also notify the owner immediately. If there is any doubt about the location of underground cables or lines of any kind, no work must be performed until the exact location has been determined. There will be no exceptions to these instructions. • 1.07.03 All excavations must be conducted in compliance with applicable OSHA regulations and, regardless of depth, must be shored where there is any danger to tracks, structures or personnel. • 1.07.04 Any excavations, holes or trenches on the Railway's Property must be covered, guarded and/or protected when not being worked on. When leaving work site areas at night and over weekends,the areas must Bayou Willow Parkway—Exhibit C (10/06/09) 6 1.08 Hazardous Waste, Substances and Material Reporting • 1.08.01 if Contractor discovers any hazardous waste, hazardous substance, petroleum or other deleterious material, including but not limited to any non-containerized commodity or material, on or adjacent to Railway's Property, in or near any surface water, swamp, wetlands or waterways, while performing any work under this Agreement, Contractor must immediately: (a) notify the Railway's Resource Operations Center at 1(800) 832-5452, of such discovery: (b) take safeguards necessary to protect its employees, subcontractors, agents and/or third parties: and(c)exercise due care with respect to the release,including the taking of any appropriate measure to minimize the impact of such release. 1.09 Personal Injury Reporting • 1.09.01 The Railway is required to report certain injuries as a part of compliance with Federal Railroad Administration(FRA)reporting requirements.Any personal injury sustained by an employee of the Contractor, subcontractor or Contractor's invitees while on the Railway's Property must be reported immediately(by phone mail if unable to contact in person)to the Railway's representative in charge of the project. The Non-Employee Personal Injury Data Collection Form contained herein is to be completed and sent by Fax to the Railway at 1(817)352-7595 and to the Railway's Project Representative no later than the close of shift on the date of the injury. Bayou Willow Parkway—Exhibit C (10/06/09) 7 NON-EMPLOYEE PERSONAL INJURY DATA COLLECTION INFORMATION REQUIRED TO BE COLLECTED PURSUANT TO FEDERAL REGULATION. IT SHOULD BE USED FOR COMPLIANCE WITH FEDERAL REGULATIONS ONLY AND IS NOT INTENDED TO PRESUME ACCEPTANCE OF RESPONSIBILITY OR LIABILITY. 1. Accident City/St 2, Date: Time: County: 3. Temperature: 4. Weather (if non-Railway location) 5. Social Security# 6. Name(last,first,mi) 7. Address: Street: City: St. Zip: 8. Date of Birth:_ and/or Age Gender: (if available) 9. (a) Injury:_ (b)Body Part: (i.e.(a)Laceration(b)Hand) 11. Description of Accident(To include location, action,result,etc.): 12. Treatment: ? First Aid Only ? Required Medical Treatment ? Other Medical Treatment 13. Dr.Name 30.Date: 14. Dr. Address: Street: City: St: Zip: 15. Hospital Name: 16. Hospital Address: Street: City: St: Zip: 17. Diagnosis: FAX TO RAILWAY AT(817)352-7595 AND COPY TO RAILWAY ROADMASTER FAX 337-572-2595 RAILWAY MANAGER PUBLIC PROJECTS FAX(817)352-2912 Bayou Willow Parkway—Exhibit C(10/06/09) 8 LAW DEPARTMENT APPROVED EXHIBIT "C-1" Agreement Between BNSF RAILWAY COMPANY and the CONTRACTOR BNSF RAILWAY COMPANY Attention: Manager Public Projects Railway File: 023805K Agency Project: Bayou Willow Parkway(DOT No 023805K)—construct roadway approaches and construct new center medians Gentlemen: The undersigned (hereinafter called, the "Contractor"), has entered into a contract (the "Contract") dated , 200} with the Beaumont Independent School District (ISD) for the performance of certain work in connection with the following project: Bayou Willow Parkway (DOT No. 023805K) — construct roadway approaches and construct new center medians. Performance of such work will necessarily require contractor to enter BNSF RAILWAY COMPANY ("Railway") right of way and property ("Railway Property"). The Contract provides that no work will be commenced within Railway Property until the Contractor employed in connection with said work for the Beaumont ISD (i) executes and delivers to Railway an Agreement in the form hereof, and (ii)provides insurance of the coverage and limits specified in such Agreement and Section 3 herein. If this Agreement is executed by a party who is not the Owner, General Partner, President or Vice President of Contractor, Contractor must furnish evidence to Railway certifying that the signatory is empowered to execute this Agreement on.behalf of Contractor. Accordingly, in consideration of Railway granting permission to Contractor to enter upon Railway Property and as an inducement for such entry, Contractor, effective on the date of the Contract,has agreed and does hereby agree with Railway as follows: Section 1. RELEASE OF LIABILITY AND INDEMNITY Contractor hereby waives, releases, indemnifies, defends and holds harmless Railway for all judgments, awards, claims,demands,and expenses(including attorneys'fees),for injury or death to all persons, including Railway's and Contractor's officers and employees, and for loss and damage to property belonging to any person, arising in any manner from Contractor's or any of Contractor's subcontractors' acts or omissions or any work performed on or about Railway's property or right-of-way. THE LIABILITY ASSUMED BY CONTRACTOR WILL NOT BE AFFECTED Bi' THE FACT, IF IT IS A FACT, THAT THE DESTRUCTION, DAMAGE, DEATH, OR INJURY WAS OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF RAILWAY, ITS AGENTS, SERVANTS, EMPLOYEES OR OTHERWISE, EXCEPT TO THE EXTENT THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE INTENTIONAL MISCONDUCT OR GROSS NEGLIGENCE OF RAILWAY. THE INDEMNIFICATION OBLIGATION ASSUMED BY CONTRACTOR INCLUDES ANY CLAIMS, SUITS OR JUDGMENTS BROUGHT AGAINST RAILWAY UNDER THE FEDERAL EMPLOYEE'S LIABILITY ACT, INCLUDING CLAIMS FOR STRICT LIABILITY UNDER THE SAFETY APPLIANCE ACT OR THE LOCOMOTIVE INSPECTION ACT,WHENEVER SO CLAIMED. Bayou Willow Parkway C-1 (10/06/09) 1 (Revised 06-2008,Exhibit C-1) Contractor further agrees,at its expense, in the name and on behalf of Railway,that it will adjust and settle all claims made against Railway, and will,at Railway's discretion,appear and defend any suits or actions of law or in equity brought against Railway on any claim or cause of action arising or growing out of or in any manner connected with any liability assumed by Contractor under this Agreement for which Railway is liable or is alleged to be liable. Railway will give notice to Contractor, in writing, of the receipt or dependency of such claims and thereupon Contractor must proceed to adjust and handle to a conclusion such claims, and in the event of a suit being brought against Railway, Railway may forward summons and complaint or other process in connection therewith to Contractor, and Contractor, at Railway's discretion, must defend, adjust, or settle such suits and protect, indemnify, and save harmless Railway from and against all damages,judgments, decrees, attorney's fees, costs, and expenses growing out of or resulting from or incident to any such claims or suits. In addition to any other provision of this Agreement,in the event that all or any portion of this Article shall be deemed to be inapplicable for any reason, including without limitation as a result of a decision of an applicable court, legislative enactment or regulatory order, the parties agree that this Article shall be interpreted as requiring Contractor to indemnify Railroad to the fullest extent permitted by applicable law. THROUGH THIS AGREEMENT THE PARTIES EXPRESSLY INTEND FOR CONTRACTOR TO INDEMNIFY RAILROAD FOR RAILROAD'S ACTS OF NEGLIGENCE. It is mutually understood and agreed that the assumption of liabilities and indemnification provided for in this Agreement survive any termination of this Agreement. Section 2.TERM This Agreement is effective from the date of the Contract until (i) the completion of the project set forth herein, and (ii) full and complete payment to Railway of any and all sums or other amounts owing and due hereunder. Section 3. INSURANCE Contractor must,at its sole cost and expense,procure and maintain during the life of this Agreement the following insurance coverage: A. Commercial General Liability insurance. This insurance must contain broad form contractual liability with a combined single limit of a minimum of$2,000,000 each occurrence and an aggregate limit of at least $4,000,000. Coverage must be purchased on a post 1998 ISO occurrence form or equivalent and include coverage for,but not limit to the following: ♦ Bodily Injury and Property Damage ♦ Personal Injury and Advertising Injury ♦ Fire legal liability ♦ Products and completed operations This policy must also contain the following endorsements, which must be indicated on the certificate of insurance: ♦ It is agreed that any workers' compensation exclusion does not apply to Railroad payments related to the Federal Employers Liability Act or a Raib•oad Wage Continuation Program or similar programs and any payments made are deemed not to be either payments made or obligations assumed under any Workers Compensation, disability benefits, or unemployment compensation law or similar law. ♦ The definition of insured contract must be amended to remove any exclusion or other limitation for any work being done within 50 feet of railroad property. ♦ Any exclusions related to the explosion,collapse and underground hazards must be removed. No other endorsements limiting coverage as respects obligations under this-Agreement may be included on the policy. Bayou Willow Parkway C-1 (10/06/09) 2 (Revised 06-2008, Exhibit C-1) B. Business Automobile Insurance. This insurance must contain a combined single limit of at least $1,000,000 per occurrence, and include coverage for,but not limited to the following: ♦ Bodily injury and property damage ♦ Any and all vehicles owned,used or hired C. Workers Compensation and Employers Liability insurance including coverage for,but not limited to: ♦ Contractor's statutory liability under the worker's compensation laws of the state(s) in which the work is to be performed. If optional under State law, the insurance must cover all employees anyway. ♦ Employers' Liability (Part B) with limits of at least $500,000 each accident, $500,000 by disease policy limit,$500,000 by disease each employee. D. Railroad Protective Liability insurance naming only the Railroad as the Insured with coverage of at least$2,000,000 per occurrence and $6,000,000 in the aggregate. The policy Must be issued on a standard ISO form CG 00 35 10 93 and include the following: ♦ Endorsed to include the Pollution Exclusion Amendment(ISO form CG 28 31 10 93) ♦ Endorsed to include the Limited Seepage and Pollution Endorsement. ♦ Endorsed to remove any exclusion for punitive damages. ♦ No other endorsements restricting coverage may be added. ♦ The original policy must be provided to the Railroad prior to performing any work or services under this Agreement Other Requirements: All policies (applying to coverage listed above) must not contain an exclusion for punitive damages and certificates of insurance must reflect that no exclusion exists. Contractor agrees to waive its right of recovery against Railroad for all claims and suits against Railroad. In addition, its insurers, through the terms of the policy or policy endorsement, waive their right of subrogation against Railroad for all claims and suits. The certificate of insurance must reflect the waiver of subrogation endorsement. Contractor further waives its right of recovery, and its insurers also waive their right of subrogation against Railroad for loss of its owned or leased property or property under contractor's care,custody or control. Contractor's insurance policies through policy endorsement, must include wording which states that the policy is primary and non-contributing with respect to any insurance carried by Railroad. The certificate of insurance must reflect that the above wording is included in evidenced policies. All policy(ies) required above (excluding Workers Compensation and if applicable, Railroad Protective) must include a severability of interest endorsement and Railroad must be named as an additional insured with respect to work performed under this agreement. Severability of interest and naming Railroad as additional insured must be indicated on the certificate of insurance. Contractor is not allowed to self-insure without the prior written consent of Railroad. If granted by Railroad, any deductible,self-insured retention or other financial responsibility for claims must be covered directly by contractor in lieu of insurance. Any and all Railroad liabilities that would otherwise, in accordance with the provisions of this Agreement, be covered by contractor's insurance will be covered as if contractor elected not to include a deductible,self-insured retention or other financial responsibility for claims. Prior to commencing the Work, contractor must furnish to Railroad an acceptable certificate(s) of insurance including an original signature of the authorized representative evidencing the required coverage, endorsements, and amendments and referencing the contract audit/folder number if available. The policy(ies) must contain a provision that obligates the insurance company(ies) issuing such policy(ies)to notify Railroad in writing at least 30 days prior to any cancellation, non-renewal, substitution or material alteration. This cancellation Bayou Willow Parkway C-1 (10/06/09) 3 (Revised 06-2008,Exhibit C-1) ICI provision must be indicated on the certificate of insurance. Upon request from Railroad, a certified duplicate original of any required policy must be furnished. Contractor should send the certificate(s)to the following address: Ebix BPO PO Box 12010-BN Hemet, CA 92546-8010 Fax number: 951-766-2299 Any insurance policy must be written by a reputable insurance company acceptable to Railroad or with a current Best's Guide Rating of A-and Class VII or better,and authorized to do business in the state(s) in which the service is to be provide. Contractor represents that this Agreement has been thoroughly reviewed by contractor's insurance agent(s)/broker(s), who have been instructed by contractor to procure the insurance coverage required by this Agreement. Allocated Loss Expense must be in addition to all policy limits for coverages referenced above. Not more frequently than once every five years,Railroad may reasonably modify the required insurance coverage to reflect then-current risk management practices in the railroad industry and underwriting practices in the insurance industry. If any portion of the operation is to be subcontracted by contractor, contractor must require that the subcontractor provide and maintain the insurance coverages set forth herein, naming Railroad as an additional insured, and requiring that the subcontractor release, defend and indemnify Railroad to the same extent and under the same terms and conditions as contractor is required to release,defend and indemnify Railroad herein, Failure to provide evidence as required by this section will entitle, but not require, Railroad to terminate this Agreement immediately. Acceptance of a certificate that does not comply with this section will not operate as a waiver of contractor's obligations hereunder. The fact that insurance(including, without limitation, self-insurance) is obtained by contractor will not be deemed to release or diminish the liability of contractor including, without limitation, liability under the indemnity provisions of this Agreement. Damages recoverable by Railroad will not be limited by the amount of the required insurance coverage. For purposes of this section, Railroad means "Burlington Northern Santa Fe Corporation", "BNSF RAILWAY COMPANY"and the subsidiaries,successors,assigns and affiliates of each, Section 4. EXHIBIT"C" CONTRACTOR REQUIREMENTS The Contractor must observe and comply with all provisions, obligations, requirements and limitations contained in the Contract,and the Contractor Requirements set forth on Exhibit"C"attached to the Contract and this Agreement, , including, but not be limited to, payment of all costs incurred for any damages to Railway roadbed, tracks,and/or appurtenances thereto, resulting from use,occupancy, or presence of its employees, representatives,or agents or subcontractors on or about the construction site. Section 5. TRAIN DELAY Contractor is responsible for and hereby indemnifies and holds harmless Railway (including its affiliated railway companies, and its tenants) for, from and against all damages arising from any unscheduled delay to a freight or passenger train which affects Railway's ability to fully utilize its equipment and to rneet customer service and contract obligations. Contractor will be billed, as further provided below, forthe economic losses arising from loss of use of equipment,contractual loss of incentive pay and bonuses and contractual penalties resulting from train delays,whether caused by Contractor, or subcontractors, or by the Railway performing work under this Agreement. Railway agrees that it will not perform any act to unnecessarily cause train delay. Bayou Willow Parkway C-1 (10/06/09) 4 (Revised 06-2008,Exhibit C-1) For loss of use of equipment, Contractor will be billed the current freight train hour rate per train as determined from Railway's records. Any disruption to train traffic may cause delays to multiple trains at the same time for the same period. Additionally, the parties acknowledge that passenger, U.S. mail trains and certain other grain, intermodal, coal and freight trains operate under incentive/penalty contracts between Railway and its customer(s). Under these arrangements, if Railway does not meet its contract service commitments, Railway may suffer loss of performance or incentive pay and/or be subject to penalty payments.- Contractor is responsible for any train performance and incentive penalties or other contractual economic losses actually incurred by Railway which are attributable to a train delay caused by Contractor or its subcontractors. The contractual relationship between Railway and its customers is proprietary and confidential. In the event of a train delay covered by this Agreement, Railway will share information relevant to any train delay to the extent consistent with Railway confidentiality obligations. Damages for train delay are currently $382.20 per hour per incident. THE RATE THEN IN EFFECT AT THE TIME OF PERFORMANCE BY THE CONTRACTOR HEREUNDER WILL BE USED TO CALCULATE THE ACTUAL COSTS OF TRAIN DELAY PURSUANT TO THIS AGREEMENT. Contractor and its subcontractors must give Railway's Roadmaster (Aaron Whitney) 4 weeks advance notice of the times and dates for proposed work windows. Railway and Contractor will establish mutually agreeable work windows for the project. Railway has the right at any time to revise or change the work windows due to train operations or service obligations. Railway will not be responsible for any additional costs or expenses resulting from a change in work windows. Additional costs or expenses resulting from a change in work windows shall be accounted for in Contractor's expenses for the project. Contractor and subcontractors must plan,schedule,coordinate and conduct all Contractor's work so as to not cause any delays to any trains. Kindly acknowledge receipt of this letter by signing and returning to the Railway two original copies of this letter,which,upon execution by Railway,will constitute an Agreement between us. (Contractor) BNSF Railway Company By: By: Printed Name: Name: Manager Public Projects Title: Contact Person: Accepted and effective this the day of 2009. Address: City:_ State:—Zip: Fax: Phone: E-mail: Bayou Willow Parkway C-1 (10/06/09) 5 (Revised 06-2008,Exhibit C-1) i EXHIBIT D-RR Crossing Surface Cost Estimate ++wr+ MAINTAIN PROPRIETARY CONFIDENTIALITY BNSF RAILWAY COMPANY FHPM ESTIMATE FOR BISD LOCATION BROOKS TO BAYOU WILLOW PKWY DETAILS OF ESTIMATE PLAN ITEM: PTR023805K VERSION: I PURPOSE,JUSTIFICATION AND DESCRIPTION PIP-CROSSING-LS 7505-MP 71.3-DOT 023805K-BAYOU WILLOW PKWY-BEAUMONT,TX-SILSBEE SUB-GULF DIV-RUM WHITNEY- DE MCNABB DESCRIPTION OF PROJECT AS PROVIDED BY PROJECT ENGINEER:K.ADAMS 5120/09 BNSF TO INSTALL ONE 56-FT CONCRETE CROSSING SURFACE ON BAYOUR WILLOW PARKWAY(DOT NO.0238D5K)IN BEAUMONT, TEXAS AT MP 71.30,LS 7505,SILSBEE SUBDIVISION,GULF DIVISION BISD WILL CONSTRUCT ROADWAY APPROACHES TO THE NEW CROSSING. ADDED MOBILIZATION 5/28/09 BILLING FOR THIS PROJECT SHOULD BE DIRECTED TO: PROJECT IS 100%BILLABLE TO BEAUMONT INDEPENDENT SCHOOL DISTRICT MAINTAIN PROPRIETARY CONFIDENTIALITY THE PHYSICAL LIMITS OF THIS PROJECT ARE DESCRIBED BY LINE SEGMENT,MILE POST RANGES,AND IN SOME CASES TRACK NUMBER.THIS IS THE PRIMARY AREA FOR THE PROJECT.THERE WILL BE CASES WHERE WORK AIAY OCCUR BEYOND THE DEFINED LIMITS.PROJECTS THAT INCLUDE SIGNAL,ELECTRICAL,OR TELECOMMUNICATION EQUIPMENT MAY REQUIRE ACTIVITY BEYOND THESE DEFINED TRACK LIMITS.ALL OR PORTIONS OF SOME PROJECTS MAY OCCUR IN AREAS WHERE NO MILEPOST SIGNS EXIST SUCH AS YARDS.THIS ESTIMATE IS GOOD FOR 90 DAYS.THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE M COST FOR LABOR, MATERIAL,AND OVERHEAD. DESCRIPTION QUANTITY U/M COST TOTAL$ «:nss*ass - LABOR rasrrt+ss++ PLACE FIELD WELDS-CAP 96.0 MH 2,186 PLACE PUBLIC CROSSING-CAP 68.0 NH 1,477 PLACE TRACK PANELS-ADDITION-CAP 48.0 MH 1,043 SURFACE TRACK-ADDITION-CAP 24.0 MH 565 UNLOAD BALLAST-ADDITION-CAP 13.08 MH 307 UNLOAD CROSSING MATERIAL-PUBLIC-CAP 15.0 MH 333 UNLOAD TRACK PANELS-ADDITION 15.0 MH 332 PAYROLL ASSOCIATED COSTS 4,291 EQUIPMENT EXPENSES 3.616 DA LABOR OVERHEADS 6,677 INSURANCE EXPENSES 996 TOTAL LABOR COST 21,822 21,822 rrrsrts sraarsa MATERIAL ♦iarrt««rtrtrrr4 ASPHALT IN PLACE PER TON 50.0 NT NX 7,085 BALLAST,DAVIS OK (GU,TX,KSW) 200.0 NT *' 2,078 TRACK PANEL,136 LB 40 FT-10 FT TIES-PANDROL 3.0 EA '• 14,619 RAIL,TRANSN,LH,25 FT,136-1/4 WORN I IS 2.0 EA 2,817 RAIL,TRANSN,RH 25 FT,136-1/4 WORN 115 2.0 EA 2,817 SIGN,CROSSBJG WHISTLE,W/LETTER W 2.0 EA 9 WELDKIT,GENERIC FOR ALL RAIL WEIGHTS 12.0 KT 852 CONC 13608-SEC WITH FILLER FOR WOOD 56.0 FT 11,604 CONCRETE XING RAMP AND PANEL RESTRAINT. 1.0 Si 257 MATERIAL HANDLING 1,747 ONLINE TRANSPORTATION 2,000 OFFLINE TRANSPORTATION 398 TOTAL MATERIAL COST 46,283 46,283 rtrt+rtrrwwrr OTHER as♦+rt+wrr« GANG AND EQUIPMENT MOBILAZATION 1.0 LS 5500 LEASED EQUIPMENT WITH OPERATOR 1.0 LS 4,000 Page 1 of 2 1 TOTAL OTHER ITEMS COST 9,500 9,500 PROJECT SUBTOTAL 77,605 CONTINGENCIES 7,760 BILL PREPARATION FEE 854 GROSS PROJECT COST 86,219 LESS COST PAID BY BNSF 0 TOTAL BILLABLE COST 86,219 Page 2 of 2 EXHIBIT D-RR Signal Cost Estimate *""•• MAINTAIN PROPRIETARY CONFIDENTIALITY •"•• BNSF RAILWAY COMPANY FHPM ESTIMATE FOR CITY OF BEAUMONT LOCATION BROOKS DETAILS OF ESTIMATE PLAN ITEM: PS1023805K VERSION: I PURPOSE,JUSTIFICATION AND DESCRIPTION INSTALL NEW GATES,FLASHERS W/LED LENSES&BUNGALOW W/CONSTANT WARNING CIRCUITRY AT BAYOU WILLOW PARKWAY DOT 023 805 K IN BEAUMONT,TX US 7505 MP 71.30 ON THE GULF DIV.,SILSBEE SUBDIV. MONTHLY POWER UTILITY COST CENTER: 61699 THE MATERIAL LIST BELOW REFLECTS TYPICAL REPRESENTIVE PACKAGES USED FOR ESTIMATING PURPOSE ONLY. THEY CAN BE EXPECTED TO CHANGE AFTER THE ENGINEERING PROCESS.DETAILED AND ACCURATE MATERIAL LISTS WILL BE FURNISHED WHEN ENGINEERING IS COMPLETED. CONTINUING CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF RAILROAD. THIS ESTIMATE IS GOOD FOR 90 DAYS.THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR,MATERIAL,AND OVERHEAD. ......rr,.rww.r«,......,wrrrrrr SIGNAL WORK ONLY..r.rrttrrr..rw t.rtrtrrrrr•...... THE BEAUMONT INDEPENDENT SCHOOL DISTRICT IS FUNDING 100%OF THE PROJECT COST. MAINTAIN PROPRIETARY CONFIDENTIALITY DESCRIPTION QUANTITY U/M COST TOTAL$ rtw4rtr4!!4! LABOR twrwkr ttr! SIGNAL FIELD LABOR-CAP 9510 MH 24,810 SIGNAL SHOP LABOR-CAP 64.0 MH 1,684 PAYROLL ASSOCIATED COSTS 18,227 EQUIPMENT EXPENSES 8,213 DA LABOR OVERHEADS 28,347 INSURANCE EXPENSES 4,238 TOTAL LABOR COST 85,519 85,519 ,...w.rtlrlrr, MATERIAL ,lt.rtrwltrrl, 3"STEEL CONDUIT 70.0 FT N 1,190 BATTERY 1.0 LS N 4,540 BUNGALOW 6X6 1.0 EA N 8,612 BUNGALOW MATERIAL 1.0 LS N 5,260 CABLE 1.0 LS N 5,460 CHARGERS 1.0 LS N 1,030 DBL SIDED X-BUCK 3.0 EA N 1,725 FIELD MATERIAL 1.0 LS N 4,920 FOUNDATIONS STEEL 3.0 EA N 2,121 GATE KEEPER 3.0 EA N 5,583 GATE MECH.MODEL 95 3.0 EA N 22,605 GENERATOR 1.0 EA N 6,128 HXP3R SYSTEM 1.0 EA N 18,163 LED GATE KIT 3.0 EA N 990 LED LIGHT AD1 12.0 EA N 3,060 MATERIAL FOR ELECTRICAL 1.0 EA N 1,500 POLYPIPE 1.0 LS N 3,000 RECORDER 1.0 EA N 5,203 TELLULAR MONITOR 1.0 EA N 2,500 OFFLINE TRANSPORTATION 1,029 TOTAL MATERIAL COST 104,609 104,609 rwr+,lw,r. OTHER w.wrrrr.t, AC POWER SERVICE 1.0 EA N 5.000 CONTRACT BORING 1.0 LS N 25.000 CONTRACT ENGINEERING 1.0 LS N 5,000 FILL DIRT 100.0 CY N 2,500 SURFACE ROCK 25.0 CY N 625 TOTAL OTH ER ITEMS COST 38,125 38,125 PROJECT SUBTOTAL 228,253 Page 1 of 2 CONTINGENCIES 0 BILL PREPARATION FEE 2.283 GROSS PROJECT COST 230,536 LESS COST PAID BY BNSF 0 TOTAL BILLABLE COST 230,536 Page 2 of 2