HomeMy WebLinkAboutRES 09-308 RESOLUTION NO. 09-308
WHEREAS,on February 10,2009,the City Council of the City of Beaumont, Texas,
passed Resolution No. 09-046 awarding a contract in the amount of$576,354.00 to Huff
& Mitchell, Inc., of Cypress, Texas, for the Sanitary Sewer System Improvements 60-Inch
Trunk Outfall Rehabilitation Phase I Project; and
WHEREAS, Change Order No. 1 in the amount of$60,000 was required for"extra
work"to include labor, materials, and equipment necessary to install 100 linear feet of 54-
Inch HOBAS Pipe by opencut methods across the pipeline corridor on Lafin Road to return
the existing line to the correct grade, thereby increasing the contract time by ten (10)
calendar days and the total contract amount to $636,354; and
WHEREAS, Change Order No. 2 in the amount of$34,695.71 is required for"extra
work" to furnish and install an additional 1 ,052 tons of cement stabilized sand on Lafin
Road and haul off 642 cubic yards of excavated material, thereby increasing the contract
time by 5 calendar and the total contract amount to $671,049.71.
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to execute Change Order No. 2
for"extra work" described above, thereby increasing the contract time by five (5) calendar
days and the contract amount by $34,695.71, for a total contract amount of$671,049.71.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 13th day of
October, 2009.
' -61ayor Becky Ames -
c„�
w s
2�
N r
ti;�