HomeMy WebLinkAboutRES 09-289 RESOLUTION NO. 09-289
WHEREAS, on July 29, 2008, the City Council of the City of Beaumont, Texas,
passed Resolution No. 08-217 awarding a contract in the amount of $568,047.02 to
Norman Highway Constructors, Inc., for the Brick Paved Sidewalks Project for the
downtown block bounded by Park Street, Fannin Street, Neches Street and Bowie Street;
WHEREAS, Change Order No. 1 in the amount of($17,139.49)is required to adjust
estimated construction quantities to match quantities actually used,thereby decreasing the
contract amount to $550,907.53; and
WHEREAS, the project has been inspected and completed in accordance with the
terms and conditions of the contract and should be accepted;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to execute Change Order No. 1
in the amount of ($17,139.49), thereby decreasing the contract amount to $550,907.53.
BE IT FURTHER RESOLVED THAT the completed Brick Paved Sidewalks Project
for the downtown block bounded by Park, Fannin, Neches and Bowie Streets be and the
same is hereby accepted.
BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make final
payment in the amount of$29,620.38 to Norman Highway Constructors, Inc.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 29th day of
September, 2009.
low
l, �pUMO /1��11
�� QIayor Becky Ames -
.�s
CITY OF BEAUMONT
DATE: September 23, 2009
PROJECT: BLOCK 59 DOWNTOWN BRICK PAVED SIDEWALKS PROJECT
OWNER: CITY OF BEAUMONT
CONTRACTOR: NORMAN HIGHWAY CONSTRUCTORS, INC.
CHANGE ORDER NO. : 1 (FINAL)
THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE:
Adjust the Estimated Quantities to reflect the Actual Quantities used in completing the project.
ORIGINAL CONTRACT AMOUNT: $568,047.02
NET FROM PREVIOUS CHANGE ORDERS: $568,047.02
TOTAL AMOUNT OF THIS CHANGE ORDER: ($17,139.49)
PERCENT OF THIS CHANGE ORDER: (3.02%)
TOTAL PERCENT CHANGE TO DATE: (3.02%)
NEW CONTRACT AMOUNT: $550,907.53
CONTRACT''TIMES IS NOT AFFECTED BY THIS CHANGE ORDER
ACCEPTED BY:
CONTRACTOR
APPROVED BY:
J IS P. COLBERT,P.E. CITY ENGINEER
THOMAS A. WARNER, P.E.
DIRECTOR OF PUBLIC WORKS
L
KYLE HAYES, CITY MANAGER
ATTESTED BY: /j.
V- V J�
TINA BROUSSA D, CITY CLER