Loading...
HomeMy WebLinkAboutRES 09-141 RESOLUTION NO. 09-141 WHEREAS, on October 2, 2007, the City Council of the City of Beaumont, Texas, passed Resolution No. 07-304 awarding a contract in the amount of$429,796.02 to Allco, Ltd., Beaumont, Texas, for the Sanitary Sewer Rehabilitation of Small Diameter Mains Contract - XIII Project; and, WHEREAS, Change Order No. 1 in the amount of $71,612.80 was required for "extra work"to rehabilitate approximately 240 linear feet of 6-inch and 1,150 linear feet of 8-inch sanitary sewer lines, remove and replace four manholes, clean and televise 1,390 linear feet of existing lines, post televise 1,390 linear feet of rehabilitated lines, furnish and install two end of line cleanouts, replace 30 short side service connections and increase the contract time by 155 calendar days for the area between Fieldwood and Ebonwood Lane from Edson Drive to Bandera Drive, thereby increasing the contract amount to $501,408.82; and WHEREAS, Change Order No. 2 in the amount of$15,409.68 is required for"extra work" to rehabilitate approximately 384 linear feet of 8-inch sanitary sewer lines, remove and replace one manhole, clean and televise 384 linear feet of existing lines, post televise 384 linear feet of rehabilitated lines, replace one short side service connection, and increase the contract time by 20 calendar days to a total of 295 calendar days, thereby increasing the contract amount to $516,818.50. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager is hereby authorized to execute Change Order No. 2 for "extra work"described above in the amount of$15,409.68,thereby increasing the contract amount to $516,818.50. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 19th day of May, 2009. r' M r Becky Ames"- � W W r r 1101 err