HomeMy WebLinkAboutRES 09-027 RESOLUTION NO. 09-027 WHEREAS, on January 9, 2007, the City Council of the City of Beaumont, Texas, passed Resolution No. 07-005 awarding a contract in the amount of$1,491,195 to Allco, Ltd. for the Sanitary Sewer Rehabilitation of Small Diameter Mains Contract-XII Project; and, WHEREAS, Change Order No. 1 was required for extra work to rehabilitate approximately 710 linear feet of 8-inch sanitary sewer lines, remove approximately 420 linear feet of existing deteriorated 4-inch liner pipe, install one manhole in the street, install one end of line clean out, pre-televise and post-televise the rehabilitated lines, replace two service connections and increase the contract time 45 calendar days, increasing the contract amount by $31,670 thereby increasing the contract amount to $1,522,865; and, WHEREAS, Change Order No. 2 was required to rehabilitate approximately 1640 linear feet of 10-inch sanita ry sewer lines, remove and replace seven manholes in the street, televise 1640 linear feet of damaged lines, post televise 1640 linear feet of rehabilitated lines, perform construction flagging on Roberts Avenue and Fourth Street, replace five service connections and increase the contract time by 60 calendar days thereby increasing the total contract time to 375 calendar days and increasing the contract amount by $92,925 for a total amount of$1,615,790 for the Sanitary Sewer Rehabilitation of Small Diameter Mains Contract-XII Project; and, WHEREAS, Change Order No. 3 was required to rehabilitate approximately 740 linear feet of 6-inch and 310 linear feet of 8-inch sanitary sewer lines, remove and replace three manholes, clean and televise 1050 linear feet of existing lines, post televise 1050 linear feet of rehabilitated lines, and replace 14 service connections and increasing the amount by $44,055 thereby increasing the contract to $1,659,845; and WHEREAS, Change Order No. 4, executed on November 1, 2007, increased the contract amount by $9,950 for a total contract amount of$1,669,795; and WHEREAS, Change Order No. 5 in the amount of $152,080 is required to rehabilitate approximately 2,160 linear feet of 8-inch and 750 linear feet of 10-inch sanitary sewer lines, remove and replace eight manholes in the street, furnish and install one manhole in the street, abandon one manhole in place, clean and televise 2,910 linear feet of damaged lines, post televise 2,910 linear feet of rehabilitated lines, replace 63 service connections and increase the contract time by 120 calendar days, thereby increasing the contract amount to $1,821,875; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute Change Order No. 5 for extra work described above in the amount of$152,080, thereby increasing the contract to $1,821,875. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 27th day of January, 2009. Ar MO, - Mayor Becky Ames - � w � i