Loading...
HomeMy WebLinkAboutRES 08 246 RESOLUTION NO. 08-246 WHEREAS, bids were solicited for a contract for the reconstruction and rehabilitation of owner-occupied housing units damaged by Hurricane Rita; and, WHEREAS, J. W. Turner Construction of Tomball, Texas, and TWA Air Conditioning of Orange, Texas, submitted bids in the amounts of$296,217 and $165,164 respectively; and, WHEREAS, City Council is of the opinion that the bid submitted by J. W. Turner Construction of Tomball,Texas, in the amount of$296,217 for reconstruction of the below listed structures should be accepted: Location 3090 Hollywood $72,247 3140 Cartwright 79,480 2805 W. Lucas 72,245 1208 Harrison 72,245 TOTAL $296,217 and, WHEREAS, City Council is of the opinion that the bid submitted by TWA Air Conditioning of Orange, Texas, in the amount of $165,164 for rehabilitation of the below listed structures should be accepted: Location 1085 Van Buren $45,906 855 Alma 63,926 1820 Sarah 55,332 TOTAL $165,164 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the bids submitted by J. W. Turner of Tomball, Texas, in the amount of $296,217 for reconstruction of the four (4) structures listed above and TWA Air Conditioning of Orange, Texas, in the amount of $165,164 for rehabilitation of the three (3) structures listed above be accepted by the City of Beaumont. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 9th day of September, 2008. � p.UMp � - ayor Becky Ames - 0 t0►&f0